Operated by MARWELL PETROLEUM LTD PARTNRSHIP (P-5 531085) in the AGUA DULCE field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 56366District 04Field 00832001GasSaveExport
Value, all time
$144 k
Jan 1993 – Jun 2006
Value, last 12 filed months
$0
at the published price for each month
Months reported
162
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 53 leases and 107 wells, and the rule below applies to all of them.

Discovered
1928-04-03
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
466 ft
minimum

A drilling unit in this field needs at least 40 acres.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction106,859 Mcf$144,290
Total$144,290

63,979 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.6771, -97.8882. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.67706, -97.88817 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,084 ft
1 wells filed one
Completion to plug
32.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,084 ft.

Completions filed
Aug 1973
1 of 1 wells
Plug dates filed
Jun 2006
1 of 1 wells

Last completion to plug: a median of 32.8 years across the 1 well that filed both dates, with the middle half between 32.8 years and 32.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3550524227,084 ftAug 1973Jun 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (162)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

162 months

Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 2005054.9413.42$0
Nov 2005054.6910.59$0
Oct 2005058.3413.80$0
Sep 2005061.4512.08$0
Aug 2005061.519.80$0
Jul 2005055.697.84$0
Jun 2005052.337.38$0
May 2005045.226.65$0
Apr 2005049.207.36$0
Mar 2005050.377.15$0
Feb 2005045.226.31$0
Jan 2005043.166.32$0
Dec 2004039.866.75$0
Nov 2004045.286.33$0
Oct 2004049.706.52$0
Sep 2004043.245.28$0
Aug 2004042.375.55$0
Jul 2004038.286.08$0
Jun 20043036.106.43$193
May 20042837.486.49$182
Apr 20044334.475.86$252
Mar 200425334.365.53$1,399
Feb 2004032.455.51$0
Jan 200412432.036.30$781
Dec 200325430.266.30$1,601
Nov 200326428.804.60$1,213
Oct 200330128.174.76$1,433
Sep 200342026.314.75$1,995
Aug 200343229.765.13$2,216
Jul 200343629.415.17$2,254
Jun 200342028.565.98$2,513
May 200343326.595.97$2,586
Apr 200342626.675.41$2,304
Mar 200344431.146.10$2,707
Feb 200340133.487.93$3,178
Jan 200345230.315.58$2,523
Dec 200244226.914.85$2,145
Nov 200241724.664.14$1,725
Oct 200235026.464.23$1,480
Sep 200242127.443.64$1,530
Aug 200243325.963.16$1,370
Jul 200241224.583.06$1,261
Jun 200227023.733.34$901
May 200227824.663.58$996
Apr 200227223.653.51$955
Mar 200220122.003.10$624
Feb 200221318.222.38$506
Jan 200226417.172.38$627
Dec 200140016.932.36$946
Nov 200121818.072.41$524
Oct 200127119.782.53$685
Sep 200121924.262.25$493
Aug 200126024.873.05$794
Jul 200134023.933.20$1,087
Jun 200133024.563.82$1,262
May 200135025.524.31$1,508
Apr 200135224.685.34$1,878
Mar 200134024.545.38$1,828
Feb 200145027.755.77$2,595
Jan 200147127.478.40$3,956
Dec 200060726.889.12$5,537
Nov 200077432.215.66$4,379
Oct 200057831.235.15$2,974
Sep 200047331.875.19$2,453
Aug 200030029.644.54$1,362
Jul 200037728.534.09$1,542
Jun 200039029.304.40$1,715
May 200044327.263.68$1,630
Apr 200040024.513.12$1,246
Mar 200040828.422.86$1,167
Feb 200057227.622.73$1,560
Jan 200040025.272.48$992
Dec 199949524.282.42$1,200
Nov 199934723.192.43$845
Oct 199958420.982.80$1,637
Sep 199949121.752.62$1,286
Aug 199946419.262.88$1,334
Jul 199951517.892.37$1,222
Jun 199952815.942.36$1,247
May 199961715.792.32$1,432
Apr 199960215.102.21$1,329
Mar 199970112.471.84$1,289
Feb 19996069.981.82$1,102
Jan 199974410.381.90$1,414
Dec 19986849.201.77$1,213
Nov 199852210.892.19$1,141
Oct 199861612.421.97$1,213
Sep 199860512.592.08$1,260
Aug 199863711.301.91$1,215
Jul 199868111.742.24$1,524
Jun 199844211.242.24$989
May 1998012.622.21$0
Apr 199830113.042.51$754
Mar 199871112.802.31$1,642
Feb 199875013.952.30$1,724
Jan 199875514.702.15$1,627
Dec 199790616.322.41$2,184
Nov 199789318.193.09$2,758
Oct 199779019.253.15$2,488
Sep 199790417.742.95$2,671
Aug 199778317.862.55$2,000
Jul 199782717.582.25$1,858
Jun 199793717.242.26$2,115
May 19971,12218.972.31$2,590
Apr 199774017.882.08$1,541
Mar 199795318.951.94$1,848
Feb 199792520.492.21$2,040
Jan 199784523.483.54$2,991
Dec 199690123.32$0
Nov 19961,02821.97$0
Oct 19961,01323.31$0
Sep 199697722.22$0
Aug 199662020.26$0
Jul 199699119.55$0
Jun 19961,15318.73$0
May 19961,12219.43$0
Apr 199684821.51$0
Mar 19961,13119.38$0
Feb 19961,19816.98$0
Jan 199696617.07$0
Dec 19951,09017.19$0
Nov 19951,09116.00$0
Oct 19951,21815.43$0
Sep 19951,16816.18$0
Aug 19951,04015.92$0
Jul 19951,12215.24$0
Jun 19951,24616.41$0
May 199564417.56$0
Apr 199599417.73$0
Mar 19951,23216.44$0
Feb 19951,17916.58$0
Jan 19951,10415.92$0
Dec 19941,15315.03$0
Nov 19941,18215.90$0
Oct 19941,39915.58$0
Sep 19941,48615.29$0
Aug 19941,53216.13$0
Jul 19941,75417.56$0
Jun 19941,60617.09$0
May 19941,73115.88$0
Apr 19941,64414.14$0
Mar 19941,35912.46$0
Feb 19941,36012.50$0
Jan 19941,55012.66$0
Dec 19931,47212.33$0
Nov 19931,30014.49$0
Oct 19931,50515.85$0
Sep 19931,59515.03$0
Aug 19931,82015.66$0
Jul 19932,04615.46$0
Jun 19932,00016.79$0
May 19932,12317.68$0
Apr 19931,58418.05$0
Mar 19931,68618.14$0
Feb 19931,68617.90$0
Jan 19932,33016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2004 — as filed, then multipliedworked
Gas                   30 Mcf  × $  6.43 =       $193

────────────────────────────────────────────────────
Month total                                     $193

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/56366 is the state's own key, not one this site invented.