Operated by SM ENERGY COMPANY (P-5 788997) in the GOLD RIVER, NORTH (OLMOS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 63994District 04Field 35566500CondensateGasSaveExport
Value, all time
$225 k
Jan 1993 – Apr 2013
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 830 leases and 840 wells, and the rule below applies to all of them.

Discovered
1978-10-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-10-25.

The Commission's schedule remark for this field reads: REMAIN SUSPENDED.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition69 bbl$3,781
GasProduction75,700 Mcf$221,101
Total$224,881

27,862 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 28.0515, -99.9567. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

28.05154, -99.95667 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
4,827 ft
1 wells filed one
Completion to plug
37.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 4,827 ft.

Completions filed
Oct 1975
1 of 1 wells
Plug dates filed
Apr 2013
1 of 1 wells

Last completion to plug: a median of 37.5 years across the 1 well that filed both dates, with the middle half between 37.5 years and 37.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-47931073234,827 ftOct 1975Apr 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

Apr 20130093.964.28$0
Mar 201306193.623.91$239
Feb 201317491.233.42$344
Jan 201307691.603.42$260
Dec 201206786.773.42$229
Nov 201205086.953.62$181
Oct 201206889.383.40$231
Sep 201206394.672.92$184
Aug 201205392.662.91$154
Jul 201205385.133.02$160
Jun 201205779.822.52$144
May 201204491.612.49$109
Apr 2012043101.652.00$86
Mar 2012042105.052.22$93
Feb 2012042101.102.57$108
Jan 201205898.092.73$159
Dec 201105996.873.24$191
Nov 201106995.723.31$228
Oct 20110384.983.65$11
Sep 201101483.623.99$56
Aug 201138383.404.15$595
Jul 201109194.144.52$411
Jun 2011111392.904.64$617
May 2011112398.134.40$640
Apr 20111134105.964.33$687
Mar 2011221496.364.06$1,061
Feb 2011221085.644.18$1,049
Jan 2011128486.504.59$1,390
Dec 2010325785.734.35$1,375
Nov 2010125880.843.80$1,060
Oct 2010123178.103.51$889
Sep 2010221772.633.98$1,009
Aug 2010126173.684.42$1,227
Jul 2010124672.554.74$1,238
Jun 2010130870.364.91$1,583
May 2010129671.124.24$1,325
Apr 2010124881.694.12$1,104
Mar 2010130078.394.39$1,395
Feb 2010125873.585.44$1,478
Jan 2010134474.365.96$2,126
Dec 2009152671.445.48$2,956
Nov 2009334474.593.75$1,514
Oct 2009133772.544.11$1,458
Sep 2009127965.543.06$921
Aug 2009133467.423.22$1,142
Jul 2009034361.133.46$1,188
Jun 2009138166.163.90$1,550
May 2009252054.743.93$2,151
Apr 2009149146.773.59$1,808
Mar 2009147742.144.06$1,978
Feb 2009037932.814.63$1,756
Jan 2009043735.865.37$2,347
Dec 2008049737.105.98$2,971
Nov 2008058155.496.86$3,986
Oct 2008089075.246.92$6,161
Sep 20080513101.767.88$4,041
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 200602160.085.04$106
Aug 200605568.717.34$404
Jul 200603669.376.34$228
Jun 200603866.286.38$243
May 2006321966.016.42$1,605
Apr 2006015364.397.36$1,126
Mar 2006018256.707.08$1,289
Feb 2006011357.597.75$876
Jan 2006031760.598.93$2,832
Dec 2005036154.9413.42$4,843
Nov 2005033554.6910.59$3,547
Oct 2005037058.3413.80$5,104
Sep 2005034461.4512.08$4,155
Aug 2005036061.519.80$3,527
Jul 2005027855.697.84$2,181
Jun 2005043352.337.38$3,196
May 2005038345.226.65$2,547
Apr 2005039549.207.36$2,907
Mar 2005037650.377.15$2,690
Feb 2005030445.226.31$1,919
Jan 2005039243.166.32$2,478
Dec 2004029939.866.75$2,019
Nov 2004015545.286.33$981
Oct 2004026749.706.52$1,740
Sep 2004027843.245.28$1,469
Aug 2004015342.375.55$849
Jul 2004021338.286.08$1,296
Jun 2004025636.106.43$1,647
May 2004028737.486.49$1,864
Apr 2004034134.475.86$1,998
Mar 2004029434.365.53$1,626
Feb 2004031532.455.51$1,736
Jan 2004041932.036.30$2,640
Dec 2003039830.266.30$2,508
Nov 2003040928.804.60$1,879
Oct 2003042128.174.76$2,004
Sep 2003043026.314.75$2,042
Aug 2003042129.765.13$2,160
Jul 2003043529.415.17$2,249
Jun 2003035528.565.98$2,124
May 2003040426.595.97$2,413
Apr 2003142026.675.41$2,298
Mar 2003147131.146.10$2,902
Feb 2003043733.487.93$3,464
Jan 2003045930.315.58$2,562
Dec 2002047926.914.85$2,325
Nov 2002121524.664.14$914
Oct 2002033226.464.23$1,404
Sep 2002123527.443.64$882
Aug 2002029325.963.16$927
Jul 2002026924.583.06$824
Jun 2002035923.733.34$1,198
May 2002037224.663.58$1,333
Apr 2002036623.653.51$1,286
Mar 2002032022.003.10$993
Feb 2002024318.222.38$577
Jan 2002037917.172.38$900
Dec 2001953616.932.36$1,420
Nov 2001044718.072.41$1,075
Oct 2001057519.782.53$1,454
Sep 2001026424.262.25$594
Aug 2001026024.873.05$794
Jul 2001026223.933.20$838
Jun 2001024624.563.82$941
May 2001019625.524.31$844
Apr 2001015924.685.34$848
Mar 2001015524.545.38$833
Feb 2001017327.755.77$998
Jan 2001029127.478.40$2,444
Dec 2000429026.889.12$2,753
Nov 2000022932.215.66$1,296
Oct 2000022731.235.15$1,168
Sep 2000030031.875.19$1,556
Aug 2000016729.644.54$758
Jul 2000015128.534.09$618
Jun 2000022929.304.40$1,007
May 2000021627.263.68$795
Apr 2000019024.513.12$592
Mar 2000010128.422.86$289
Feb 2000015927.622.73$434
Jan 2000020025.272.48$496
Dec 1999620724.282.42$647
Nov 1999016523.192.43$402
Oct 1999020720.982.80$580
Sep 1999023921.752.62$626
Aug 1999022419.262.88$644
Jul 1999033217.892.37$788
Jun 1999042715.942.36$1,009
May 1999036115.792.32$838
Apr 1999042315.102.21$934
Mar 1999240912.471.84$777
Feb 199903179.981.82$576
Jan 1999041710.381.90$792
Dec 199804889.201.77$865
Nov 1998035810.892.19$782
Oct 199808112.421.97$160
Sep 1998029512.592.08$614
Aug 1998033411.301.91$637
Jul 1998031111.742.24$696
Jun 1998042811.242.24$958
May 1998035912.622.21$792
Apr 1998028013.042.51$701
Mar 1998036612.802.31$845
Feb 1998032213.952.30$740
Jan 1998034914.702.15$752
Dec 1997031116.322.41$750
Nov 1997032118.193.09$991
Oct 1997038419.253.15$1,210
Sep 1997035017.742.95$1,034
Aug 1997029117.862.55$743
Jul 1997033017.582.25$741
Jun 1997031917.242.26$720
May 199705818.972.31$134
Apr 1997013717.882.08$285
Mar 1997032618.951.94$632
Feb 1997037120.492.21$818
Jan 1997045323.483.54$1,603
Dec 1996033223.32$0
Nov 1996052521.97$0
Oct 1996022723.31$0
Sep 1996025022.22$0
Aug 1996028520.26$0
Jul 1996033319.55$0
Jun 1996046518.73$0
May 1996044219.43$0
Apr 1996050821.51$0
Mar 1996050319.38$0
Feb 1996046916.98$0
Jan 1996061217.07$0
Dec 1995047417.19$0
Nov 1995047316.00$0
Oct 1995247015.43$31
Sep 1995051516.18$0
Aug 1995069315.92$0
Jul 1995071915.24$0
Jun 1995068716.41$0
May 1995047317.56$0
Apr 1995048217.73$0
Mar 1995064416.44$0
Feb 1995073816.58$0
Jan 1995059015.92$0
Dec 1994089115.03$0
Nov 1994081815.90$0
Oct 1994093715.58$0
Sep 1994073915.29$0
Aug 1994072316.13$0
Jul 1994084717.56$0
Jun 1994082417.09$0
May 1994042215.88$0
Apr 1994069814.14$0
Mar 1994067312.46$0
Feb 1994065212.50$0
Jan 1994034112.66$0
Dec 1993055812.33$0
Nov 1993058714.49$0
Oct 1993066815.85$0
Sep 1993067115.03$0
Aug 1993055215.66$0
Jul 1993058715.46$0
Jun 1993061016.79$0
May 1993053117.68$0
Apr 1993058618.05$0
Mar 1993065018.14$0
Feb 1993063417.90$0
Jan 1993075416.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2013 — as filed, then multipliedworked
Condensate             0 bbl  × $ 93.62 =         $0
Gas                   61 Mcf  × $  3.91 =       $239

────────────────────────────────────────────────────
Month total                                     $239

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/63994 is the state's own key, not one this site invented.