VELA

Operated by CLIFFWOOD PRODUCTION CO. (P-5 160606) in the LAREDO (LOBO) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 71854District 04Field 52025500CondensateGasSaveExport
Value, all time
$113 k
Jan 1993 – Feb 2001
Value, last 12 filed months
$28 k
at the published price for each month
Months reported
98
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 281 leases and 281 wells, and the rule below applies to all of them.

Discovered
1976-02-01
as the register files it
Field class
Gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1976-02-01.

The Commission's schedule remark for this field reads: SURVEYS.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition118 bbl$2,021
GasProduction131,484 Mcf$111,209
Total$113,230

91,168 Mcf of this lease's gas, across 46 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.4352, -99.4846. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.43524, -99.48457 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,660 ft
1 wells filed one
Completion to plug
24.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,660 ft.

Completions filed
Aug 1976
1 of 1 wells
Plug dates filed
Feb 2001
1 of 1 wells

Last completion to plug: a median of 24.5 years across the 1 well that filed both dates, with the middle half between 24.5 years and 24.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-4793128017,660 ftAug 1976Feb 2001Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (98)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

98 months

Feb 200107727.755.77$444
Jan 2001052727.478.40$4,426
Dec 2000049526.889.12$4,516
Nov 2000073932.215.66$4,181
Oct 2000062531.235.15$3,216
Sep 2000014631.875.19$757
Aug 2000010329.644.54$468
Jul 2000023928.534.09$977
Jun 2000058829.304.40$2,586
May 2000070327.263.68$2,587
Apr 2000073124.513.12$2,278
Mar 2000067128.422.86$1,919
Feb 2000067627.622.73$1,843
Jan 2000069625.272.48$1,726
Dec 1999071924.282.42$1,743
Nov 1999072623.192.43$1,767
Oct 199901,05320.982.80$2,952
Sep 19992394121.752.62$2,965
Aug 1999088919.262.88$2,556
Jul 1999085517.892.37$2,028
Jun 199901,19015.942.36$2,811
May 199901,20915.792.32$2,806
Apr 199901,09815.102.21$2,424
Mar 199901,35012.471.84$2,482
Feb 199901,1649.981.82$2,116
Jan 199901,16110.381.90$2,206
Dec 199841,1839.201.77$2,135
Nov 199801,11010.892.19$2,426
Oct 1998068812.421.97$1,355
Sep 1998075712.592.08$1,577
Aug 1998083411.301.91$1,591
Jul 1998078011.742.24$1,745
Jun 1998073511.242.24$1,644
May 199801,00112.622.21$2,209
Apr 1998190613.042.51$2,283
Mar 1998099712.802.31$2,303
Feb 1998084513.952.30$1,943
Jan 1998081414.702.15$1,754
Dec 1997068516.322.41$1,652
Nov 199701,02418.193.09$3,162
Oct 199701,12019.253.15$3,528
Sep 199701,18317.742.95$3,496
Aug 1997082517.862.55$2,108
Jul 1997074917.582.25$1,683
Jun 199701,04517.242.26$2,359
May 1997091718.972.31$2,117
Apr 19970117.882.08$2
Mar 19970018.951.94$0
Feb 199701,35720.492.21$2,993
Jan 199701,38923.483.54$4,917
Dec 199601,46223.32$0
Nov 199601,32021.97$0
Oct 199601,61123.31$0
Sep 199601,24822.22$0
Aug 199601,62020.26$0
Jul 199602,11619.55$0
Jun 199602,78018.73$0
May 199604,97019.43$0
Apr 199601,98721.51$0
Mar 199601,38319.38$0
Feb 199601,31916.98$0
Jan 199601,31517.07$0
Dec 199501,21217.19$0
Nov 199501,25416.00$0
Oct 199591,45015.43$139
Sep 199501,43016.18$0
Aug 199501,39415.92$0
Jul 199501,38515.24$0
Jun 199501,46316.41$0
May 199501,54217.56$0
Apr 199501,73617.73$0
Mar 1995811,44216.44$1,332
Feb 199501,30116.58$0
Jan 199501,38915.92$0
Dec 199401,45915.03$0
Nov 199401,44615.90$0
Oct 199401,64815.58$0
Sep 199401,66215.29$0
Aug 199401,79016.13$0
Jul 199401,81917.56$0
Jun 199402,22717.09$0
May 199402,58515.88$0
Apr 199402,82014.14$0
Mar 199403,38912.46$0
Feb 199403,34912.50$0
Jan 199403,23212.66$0
Dec 199302,76712.33$0
Nov 199302,74314.49$0
Oct 199303,16115.85$0
Sep 199302,42415.03$0
Aug 199301,26915.66$0
Jul 19930015.46$0
Jun 19930016.79$0
May 199301,04317.68$0
Apr 199302,17918.05$0
Mar 199301,90118.14$0
Feb 199303,30117.90$0
Jan 199302,82516.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2001 — as filed, then multipliedworked
Condensate             0 bbl  × $ 27.75 =         $0
Gas                   77 Mcf  × $  5.77 =       $444

────────────────────────────────────────────────────
Month total                                     $444

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/71854 is the state's own key, not one this site invented.