DE BENAVIDES, ROSA V. ET AL

Operated by KILLAM OIL CO., LTD. (P-5 460054) in the BRUNI, N.E. (9850) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 93319District 04Field 12633420CondensateGasSaveExport
Value, all time
$102 k
Jan 1993 – May 2005
Value, last 12 filed months
$0
at the published price for each month
Months reported
149
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 1 leases and 1 wells, and the rule below applies to all of them.

Discovered
1981-04-13
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFF. 8-1-81 PER AMENDMENT TO SWR 28 & 29

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition17 bbl$338
GasProduction58,593 Mcf$102,103
Total$102,440

24,998 Mcf of this lease's gas, across 47 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.4464, -98.8168. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.44637, -98.81683 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,600 ft
1 wells filed one
Completion to plug
24.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,600 ft.

Completions filed
Apr 1981
1 of 1 wells
Plug dates filed
May 2005
1 of 1 wells

Last completion to plug: a median of 24.1 years across the 1 well that filed both dates, with the middle half between 24.1 years and 24.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-47932182111,600 ftApr 1981May 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (149)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

149 months

May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 200207318.222.38$173
Jan 2002030117.172.38$715
Dec 2001041616.932.36$984
Nov 2001036718.072.41$883
Oct 2001011919.782.53$301
Sep 2001320924.262.25$543
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 2001013524.563.82$516
May 2001046925.524.31$2,020
Apr 2001069124.685.34$3,687
Mar 200101,32124.545.38$7,102
Feb 2001012027.755.77$692
Jan 2001034427.478.40$2,889
Dec 2000013626.889.12$1,241
Nov 2000059232.215.66$3,350
Oct 2000072131.235.15$3,710
Sep 2000095831.875.19$4,969
Aug 2000149629.644.54$2,282
Jul 2000056628.534.09$2,315
Jun 2000070829.304.40$3,113
May 2000068527.263.68$2,521
Apr 2000054024.513.12$1,683
Mar 2000067128.422.86$1,919
Feb 2000176027.622.73$2,100
Jan 2000071325.272.48$1,769
Dec 1999073424.282.42$1,779
Nov 1999070723.192.43$1,721
Oct 1999083020.982.80$2,327
Sep 1999075921.752.62$1,988
Aug 1999071619.262.88$2,059
Jul 1999081517.892.37$1,933
Jun 1999070115.942.36$1,656
May 1999063915.792.32$1,483
Apr 1999151115.102.21$1,143
Mar 1999059312.471.84$1,090
Feb 199906819.981.82$1,238
Jan 1999079110.381.90$1,503
Dec 199806519.201.77$1,154
Nov 199811,17410.892.19$2,577
Oct 1998071512.421.97$1,408
Sep 19980012.592.08$0
Aug 1998059311.301.91$1,131
Jul 1998030411.742.24$680
Jun 1998012411.242.24$277
May 1998034912.622.21$770
Apr 1998044613.042.51$1,117
Mar 1998055712.802.31$1,286
Feb 1998162313.952.30$1,446
Jan 1998060314.702.15$1,299
Dec 1997056016.322.41$1,350
Nov 1997045518.193.09$1,405
Oct 1997079119.253.15$2,492
Sep 1997459017.742.95$1,814
Aug 1997035817.862.55$915
Jul 1997263917.582.25$1,471
Jun 1997044517.242.26$1,004
May 1997068718.972.31$1,586
Apr 1997060617.882.08$1,262
Mar 1997041618.951.94$807
Feb 1997070920.492.21$1,564
Jan 1997061223.483.54$2,166
Dec 1996086523.32$0
Nov 1996045421.97$0
Oct 1996187923.31$23
Sep 1996174722.22$22
Aug 1996025320.26$0
Jul 1996061819.55$0
Jun 1996052218.73$0
May 1996086219.43$0
Apr 1996076821.51$0
Mar 1996055019.38$0
Feb 1996034816.98$0
Jan 1996030017.07$0
Dec 1995041617.19$0
Nov 1995052216.00$0
Oct 1995056915.43$0
Sep 1995066216.18$0
Aug 1995059515.92$0
Jul 1995079215.24$0
Jun 1995058316.41$0
May 1995033417.56$0
Apr 1995083617.73$0
Mar 1995011016.44$0
Feb 1995029816.58$0
Jan 1995051315.92$0
Dec 1994092515.03$0
Nov 199411,17815.90$16
Oct 1994045915.58$0
Sep 1994019115.29$0
Aug 199407216.13$0
Jul 199401117.56$0
Jun 1994025917.09$0
May 1994021815.88$0
Apr 1994034814.14$0
Mar 1994050612.46$0
Feb 1994042112.50$0
Jan 1994049212.66$0
Dec 1993047312.33$0
Nov 1993046914.49$0
Oct 1993050915.85$0
Sep 1993054515.03$0
Aug 1993043315.66$0
Jul 1993049815.46$0
Jun 1993040816.79$0
May 1993044417.68$0
Apr 199301,39618.05$0
Mar 1993049618.14$0
Feb 1993085117.90$0
Jan 19930016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2002 — as filed, then multipliedworked
Condensate             0 bbl  × $ 18.22 =         $0
Gas                   73 Mcf  × $  2.38 =       $173

────────────────────────────────────────────────────
Month total                                     $173

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/G/93319 is the state's own key, not one this site invented.