GUTIERREZ, DANIEL ETAL

Operated by PETRO-OPS, LLC (P-5 102240) in the MEDICO (3080 YEGUA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 11111District 04Field 60188300OilCasinghead gasSaveExport
Value, all time
$3.4 M
Jan 1993 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 14 wells, and the rule below applies to all of them.

Discovered
1986-09-23
as the register files it
Field class
Oil
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 1987-01-01.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition114,307 bbl$3,093,892
Casinghead gasProduction140,031 Mcf$342,286
Total$3,436,178

48,300 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (10)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.1454, -98.9223. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.5 miles.

27.14597, -98.92296 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 10 wells
With a plug date
0.0%
0 of 10 wells
Median depth
3,518 ft
10 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
10100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 10 of 10 wells. Median 3,518 ft, with the middle half between 3,258 and 3,708 ft; the shallowest is 3,210 ft and the deepest 4,180 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 10 of 10 wells, Jan 1987 – Mar 2022. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Jan 1987 – Mar 2022
10 of 10 wells

10 wells

42-2473179953,702 ftMar 2022
42-2473181063,710 ftNov 2021
42-2473174214,180 ftDec 2012
42-2473183283,840 ftDec 2012
42-24731875113,625 ftAug 2012
42-24731899133,220 ftMay 1990
42-2473184393,210 ftFeb 1989
42-2473181673,240 ftJul 1988
42-2473177433,310 ftApr 1987
42-2473176123,410 ftJan 1987

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 2019159053.472.42$8,502
Sep 20190055.052.66$0
Aug 2019134053.112.30$7,117
Jul 2019371056.272.46$20,876
Jun 20190052.782.49$0
May 2019339058.482.74$19,825
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 2018121052.934.24$6,405
Oct 2018162061.443.40$9,953
Sep 2018181059.543.11$10,777
Aug 2018505059.403.07$29,997
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 2015193040.162.87$7,751
Jul 2015191048.152.95$9,197
Jun 2015192056.152.88$10,781
May 2015361055.212.96$19,931
Apr 2015184049.822.71$9,167
Mar 2015181042.892.93$7,763
Feb 2015197044.662.98$8,798
Jan 2015360043.433.10$15,635
Dec 2014274054.693.59$14,985
Nov 2014185070.464.25$13,035
Oct 2014184078.303.90$14,407
Sep 2014194086.164.05$16,715
Aug 2014366089.394.04$32,717
Jul 2014565096.564.18$54,556
Jun 2014193098.164.74$18,945
May 2014392094.734.73$37,134
Apr 2014394095.944.81$37,800
Mar 2014576095.895.06$55,233
Feb 2014388097.406.19$37,791
Jan 2014554090.404.86$50,082
Dec 2013586091.824.35$53,807
Nov 2013589088.853.74$52,333
Oct 2013586097.423.78$57,088
Sep 20137440104.113.72$77,458
Aug 20135940104.253.52$61,925
Jul 20137650102.523.72$78,428
Jun 2013575094.403.93$54,280
May 2013585094.834.15$55,476
Apr 2013196093.964.28$18,416
Mar 2013351093.623.91$32,861
Feb 2013301091.233.42$27,460
Jan 2013195091.603.42$17,862
Dec 2012359086.773.42$31,150
Nov 2012143086.953.62$12,434
Oct 2012152089.383.40$13,586
Sep 2012148094.672.92$14,011
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 20121010105.052.22$10,610
Feb 2012750101.102.57$7,583
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070182.856.92$7
Sep 20070175.846.24$6
Aug 20070169.066.39$6
Jul 20070170.906.39$6
Jun 20070162.007.55$8
May 20070158.747.85$8
Apr 20070159.617.81$8
Mar 20070156.927.30$7
Feb 20070155.108.22$8
Jan 20070150.306.73$7
Dec 20060156.656.92$7
Nov 2006165154.207.62$8,951
Oct 20060154.906.01$6
Sep 20060160.085.04$5
Aug 2006152168.717.34$10,451
Jul 20060169.376.34$6
Jun 20060166.286.38$6
May 2006169166.016.42$11,162
Apr 20060164.397.36$7
Mar 20060156.707.08$7
Feb 20060157.597.75$8
Jan 20060160.598.93$9
Dec 20050154.9413.42$13
Nov 20050154.6910.59$11
Oct 20050158.3413.80$14
Sep 20050161.4512.08$12
Aug 2005142161.519.80$8,744
Jul 20050155.697.84$8
Jun 20050152.337.38$7
May 20050145.226.65$7
Apr 2005168149.207.36$8,273
Mar 2005020050.377.15$1,431
Feb 2005020045.226.31$1,262
Jan 2005020043.166.32$1,264
Dec 2004020039.866.75$1,350
Nov 2004020045.286.33$1,266
Oct 200413120049.706.52$7,814
Sep 2004020043.245.28$1,057
Aug 2004040042.375.55$2,220
Jul 2004040038.286.08$2,434
Jun 2004080036.106.43$5,146
May 200417190037.486.49$12,254
Apr 2004080034.475.86$4,687
Mar 20041761,00034.365.53$11,578
Feb 20041771,00032.455.51$11,253
Jan 20041801,00032.036.30$12,065
Dec 20031791,00030.266.30$11,718
Nov 20031791,00028.804.60$9,750
Oct 20031781,00028.174.76$9,774
Sep 20031701,00026.314.75$9,222
Aug 20031681,00029.765.13$10,129
Jul 20031761,00029.415.17$10,347
Jun 20033621,00028.565.98$16,322
May 20031721,00026.595.97$10,546
Apr 20031831,00026.675.41$10,288
Mar 20033501,00031.146.10$16,995
Feb 20033371,00033.487.93$19,209
Jan 20031671,00030.315.58$10,644
Dec 20023521,00026.914.85$14,326
Nov 20023251,00024.664.14$12,151
Oct 20021731,00026.464.23$8,807
Sep 20023481,00027.443.64$13,184
Aug 20023521,00025.963.16$12,302
Jul 20023421,00024.583.06$11,468
Jun 20023361,00023.733.34$11,312
May 20023431,00024.663.58$12,042
Apr 20023381,00023.653.51$11,506
Mar 20023401,00022.003.10$10,583
Feb 20023471,00018.222.38$8,698
Jan 20021641,00017.172.38$5,192
Dec 20013601,00016.932.36$8,459
Nov 20013421,00018.072.41$8,585
Oct 20011721,00019.782.53$5,931
Sep 20011751,00024.262.25$6,497
Aug 20013431,00024.873.05$11,584
Jul 20013641,00023.933.20$11,908
Jun 20013551,00024.563.82$12,543
May 20013681,00025.524.31$13,699
Apr 20013631,00024.685.34$14,294
Mar 20013661,00024.545.38$14,358
Feb 20013581,00027.755.77$15,702
Jan 20015461,00027.478.40$23,397
Dec 20003621,00026.889.12$18,853
Nov 20005431,00032.215.66$23,148
Oct 20003601,00031.235.15$16,388
Sep 20001791,00031.875.19$10,891
Aug 20001791,00029.644.54$9,846
Jul 20005311,00028.534.09$19,239
Jun 20001761,00029.304.40$9,554
May 20006881,00027.263.68$22,435
Apr 20005631,00024.513.12$16,915
Mar 20005331,00028.422.86$18,008
Feb 20005391,00027.622.73$17,614
Jan 20005431,00025.272.48$16,202
Dec 19995731,00024.282.42$16,336
Nov 19995311,00023.192.43$14,748
Oct 19995331,00020.982.80$13,986
Sep 19995461,00021.752.62$14,494
Aug 19997451,00019.262.88$17,224
Jul 19995421,00017.892.37$12,069
Jun 19997041,00015.942.36$13,584
May 19997371,00015.792.32$13,958
Apr 19995521,00015.102.21$10,543
Mar 19997181,00012.471.84$10,792
Feb 19995471,0009.981.82$7,277
Jan 19997101,00010.381.90$9,270
Dec 19983621,0009.201.77$5,104
Nov 19986961,00010.892.19$9,765
Oct 19987311,00012.421.97$11,048
Sep 19987181,00012.592.08$11,122
Aug 19988971,00011.301.91$12,043
Jul 19987211,00011.742.24$10,702
Jun 19987161,00011.242.24$10,285
May 19987131,00012.622.21$11,204
Apr 19989371,00013.042.51$14,724
Mar 19987141,00012.802.31$11,449
Feb 19981,0051,00013.952.30$16,319
Jan 19989181,00014.702.15$15,649
Dec 19979011,00016.322.41$17,115
Nov 19975611,00018.193.09$13,293
Oct 19979071,00019.253.15$20,610
Sep 19977311,00017.742.95$15,923
Aug 19979251,00017.862.55$19,075
Jul 19979211,00017.582.25$18,438
Jun 19979311,00017.242.26$18,308
May 19971,1351,00018.972.31$23,839
Apr 19977721,00017.882.08$15,886
Mar 19971,1181,00018.951.94$23,125
Feb 19977661,00020.492.21$17,901
Jan 19979501,00023.483.54$25,846
Dec 19967611,00023.32$17,747
Nov 19965801,00021.97$12,743
Oct 19963501,00023.31$8,159
Sep 19967651,00022.22$16,998
Aug 19967581,00020.26$15,357
Jul 19969521,00019.55$18,612
Jun 19967411,00018.73$13,879
May 19967751,00019.43$15,058
Apr 19967531,00021.51$16,197
Mar 19969231,00019.38$17,888
Feb 19969351,00016.98$15,876
Jan 19969881,00017.07$16,865
Dec 19951,1801,00017.19$20,284
Nov 19957961,00016.00$12,736
Oct 19959911,00015.43$15,291
Sep 19959761,00016.18$15,792
Aug 19951,1671,00015.92$18,579
Jul 19951,1741,00015.24$17,892
Jun 19951,3291,00016.41$21,809
May 19957951,00017.56$13,960
Apr 19951,1591,00017.73$20,549
Mar 19951,3001,00016.44$21,372
Feb 19951,1741,00016.58$19,465
Jan 19951,1611,00015.92$18,483
Dec 19941,3641,00015.03$20,501
Nov 19941,1971,00015.90$19,032
Oct 19941,3761,00015.58$21,438
Sep 19941,3451,00015.29$20,565
Aug 19941,1961,00016.13$19,291
Jul 19941,1881,00017.56$20,861
Jun 19941,1941,00017.09$20,405
May 19941,2001,00015.88$19,056
Apr 19941,3871,00014.14$19,612
Mar 19941,3781,00012.46$17,170
Feb 19941,1961,00012.50$14,950
Jan 19941,6221,00012.66$20,535
Dec 19931,3351,00012.33$16,461
Nov 19931,3931,00014.49$20,185
Oct 19931,3531,00015.85$21,445
Sep 19931,3541,00015.03$20,351
Aug 19931,4851,00015.66$23,255
Jul 19931,2901,00015.46$19,943
Jun 19931,3971,00016.79$23,456
May 19931,2181,00017.68$21,534
Apr 19931,2611,00018.05$22,761
Mar 19931,4561,10018.14$26,412
Feb 19931,6021,10017.90$28,676
Jan 19931,3921,10016.93$23,567

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2019 — as filed, then multipliedworked
Oil                  159 bbl  × $ 53.47 =     $8,502
Casinghead gas         0 Mcf  × $  2.42 =         $0

────────────────────────────────────────────────────
Month total                                   $8,502

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/O/11111 is the state's own key, not one this site invented.