YTURRIA L & C CO. NCT-1

Operated by CODY ENERGY LLC (P-5 164455) in the RAYMONDVILLE (A- 4A) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 12070District 04Field 74975084OilCasinghead gasSaveExport
Value, all time
$479 k
Jan 1993 – Mar 2002
Value, last 12 filed months
$55 k
at the published price for each month
Months reported
111
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 5 leases and 7 wells, and the rule below applies to all of them.

Discovered
1969-11-14
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: DOC. NO. 04-0229992 EFFECTIVE 2-1-02.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition17,963 bbl$376,136
Casinghead gasProduction22,199 Mcf$103,345
Total$479,482

5,880 Mcf of this lease's gas, across 18 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 26.6108, -97.7005. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

26.61085, -97.70052 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
2 of 2 wells
With a plug date
100.0%
2 of 2 wells
Median depth
7,950 ft
2 wells filed one
Completion to plug
14.1 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
2100.0%
A plug date is filed
2100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
2100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 7,950 and 7,950 ft, median 7,950 ft, over the 2 wells that filed a depth.

Completions filed
Jul 1992 – Oct 2000
2 of 2 wells
Plug dates filed
Sep 2010 – Oct 2010
2 of 2 wells

Last completion to plug: a median of 14.1 years across the 2 wells that filed both dates, with the middle half between 12.1 years and 16.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

2 wells

42-26130869507,950 ftOct 2000Oct 2010Yes
42-26130974517,950 ftJul 1992Sep 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (111)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

111 months

Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 200192019.782.53$1,820
Sep 2001147024.262.25$3,566
Aug 20010024.873.05$0
Jul 200116023.933.20$383
Jun 200125118124.563.82$6,857
May 20014791,35325.524.31$18,052
Apr 20016841,31224.685.34$23,881
Mar 20017001,66624.545.38$26,135
Feb 20011,0421,72927.755.77$38,887
Jan 20011,4002,15427.478.40$56,549
Dec 20003532,66226.889.12$33,773
Nov 20001,2202,82232.215.66$55,263
Oct 20004482,44031.235.15$26,546
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 19950015.43$0
Sep 19950016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 19940015.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 199421017.56$369
Jun 1994771417.09$1,316
May 19941682915.88$2,668
Apr 19941423414.14$2,008
Mar 1994651112.46$810
Feb 19942102912.50$2,625
Jan 199429262012.66$3,697
Dec 199332145612.33$3,958
Nov 1993179414.49$2,594
Oct 199325953815.85$4,105
Sep 199337275315.03$5,591
Aug 199361766115.66$9,662
Jul 1993364115.46$5,627
Jun 199354047116.79$9,067
May 199399944917.68$17,662
Apr 199382061518.05$14,801
Mar 19932,48336218.14$45,042
Feb 19932,02042317.90$36,158
Jan 19931,18241016.93$20,011

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2001 — as filed, then multipliedworked
Oil                   92 bbl  × $ 19.78 =     $1,820
Casinghead gas         0 Mcf  × $  2.53 =         $0

────────────────────────────────────────────────────
Month total                                   $1,820

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/O/12070 is the state's own key, not one this site invented.