SHAEFFER RANCH

Operated by SLAWSON EXPLORATION COMPANY, INC (P-5 787180) in the AMARGOSA (6100 SD.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 12337District 04Field 02241800OilCasinghead gasSaveExport
Value, all time
$114 k
Apr 1994 – Oct 2010
Value, last 12 filed months
$15 k
at the published price for each month
Months reported
199
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1950-12-31
as the register files it
Field class
Oil
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition3,654 bbl$89,563
Casinghead gasProduction4,689 Mcf$24,883
Total$114,446

10 Mcf of this lease's gas, across 5 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 27.9758, -98.1420. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

27.97584, -98.14197 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
6,800 ft
1 wells filed one
Completion to plug
16.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,800 ft.

Completions filed
Apr 1994
1 of 1 wells
Plug dates filed
Aug 2010
1 of 1 wells

Last completion to plug: a median of 16.3 years across the 1 well that filed both dates, with the middle half between 16.3 years and 16.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2493219416,800 ftApr 1994Aug 2010Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (199)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

199 months

Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 201030073.684.42$2,210
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 201005071.124.24$212
Apr 201005281.694.12$214
Mar 201005178.394.39$224
Feb 201005373.585.44$288
Jan 201005274.365.96$310
Dec 20091485171.445.48$10,853
Nov 200905374.593.75$199
Oct 200905172.544.11$210
Sep 200905465.543.06$166
Aug 200915467.423.22$241
Jul 200905261.133.46$180
Jun 200905266.163.90$203
May 200905354.743.93$208
Apr 200905146.773.59$183
Mar 200915242.144.06$253
Feb 200905032.814.63$232
Jan 200915035.865.37$304
Dec 20081755037.105.98$6,791
Nov 200805055.496.86$343
Oct 200805075.246.92$346
Sep 2008050101.767.88$394
Aug 2008050114.228.48$424
Jul 2008050131.0811.39$569
Jun 2008050131.3313.03$652
May 2008050123.1711.57$579
Apr 2008050110.3110.45$523
Mar 2008050101.909.66$483
Feb 200805092.538.77$439
Jan 200805090.388.21$410
Dec 20071845088.337.30$16,618
Nov 200705091.677.29$365
Oct 200705082.856.92$346
Sep 200705075.846.24$312
Aug 200705069.066.39$319
Jul 200705070.906.39$319
Jun 200705062.007.55$377
May 200705058.747.85$392
Apr 200705059.617.81$390
Mar 200705056.927.30$365
Feb 200705055.108.22$411
Jan 200715050.306.73$387
Dec 200624956.656.92$452
Nov 200604954.207.62$373
Oct 200605054.906.01$301
Sep 200605060.085.04$252
Aug 2006755068.717.34$5,520
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20047049.706.52$348
Sep 20040043.245.28$0
Aug 200405042.375.55$278
Jul 200405038.286.08$304
Jun 200405036.106.43$322
May 200405037.486.49$325
Apr 200405034.475.86$293
Mar 200405034.365.53$277
Feb 200425032.455.51$340
Jan 200405032.036.30$315
Dec 2003105030.266.30$618
Nov 200305028.804.60$230
Oct 200305028.174.76$238
Sep 200305026.314.75$237
Aug 200305029.765.13$256
Jul 200305029.415.17$259
Jun 200305028.565.98$299
May 200305026.595.97$299
Apr 200305026.675.41$270
Mar 200305031.146.10$305
Feb 2003125033.487.93$798
Jan 200305030.315.58$279
Dec 200215026.914.85$270
Nov 200205024.664.14$207
Oct 200205026.464.23$211
Sep 200215027.443.64$209
Aug 200205025.963.16$158
Jul 200205024.583.06$153
Jun 200205023.733.34$167
May 200205024.663.58$179
Apr 200205023.653.51$176
Mar 200205022.003.10$155
Feb 200205018.222.38$119
Jan 200205017.172.38$119
Dec 20011815016.932.36$659
Nov 2001015018.072.41$361
Oct 2001015019.782.53$379
Sep 2001015024.262.25$338
Aug 2001015024.873.05$458
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 1997150017.582.25$2,637
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 19970018.951.94$0
Feb 19970020.492.21$0
Jan 19970023.483.54$0
Dec 19960023.32$0
Nov 19960021.97$0
Oct 19960023.31$0
Sep 19960022.22$0
Aug 19960020.26$0
Jul 19960019.55$0
Jun 19960018.73$0
May 19960019.43$0
Apr 19960021.51$0
Mar 19960019.38$0
Feb 19960016.98$0
Jan 19960017.07$0
Dec 19950017.19$0
Nov 19950016.00$0
Oct 1995180015.43$2,777
Sep 19950016.18$0
Aug 19950015.92$0
Jul 1995185015.24$2,819
Jun 19950016.41$0
May 19950017.56$0
Apr 19950017.73$0
Mar 19950016.44$0
Feb 1995183016.58$3,034
Jan 199551015.92$812
Dec 1994716015.03$10,761
Nov 1994895015.90$14,231
Oct 19940015.58$0
Sep 1994209015.29$3,196
Aug 19940216.13$0
Jul 19940217.56$0
Jun 1994184217.09$3,145
May 1994232215.88$3,684
Apr 19940214.14$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2010 — as filed, then multipliedworked
Oil                   30 bbl  × $ 73.68 =     $2,210
Casinghead gas         0 Mcf  × $  4.42 =         $0

────────────────────────────────────────────────────
Month total                                   $2,210

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 04/O/12337 is the state's own key, not one this site invented.