MORTON NO. 1 GAS UNIT

Operated by XTO ENERGY INC. (P-5 945936) in the FREESTONE (CV-BOSSIER CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 139187District 05Field 32950285Hydrogen sulphide field2 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.6 M
Jan 1993 – Jul 2009
Value, last 12 filed months
$0
at the published price for each month
Months reported
199
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 960 leases and 960 wells, and the rule below applies to all of them.

Discovered
2006-02-28
as the register files it
Field class
Gas
the register's own label
Between wells
600 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-11-15.

The register flags this field for hydrogen sulphide. That is a poisonous gas that occurs naturally in some formations. The flag is a property of the field as the Commission records it. It is not a measurement taken at this lease, and it is not a statement that gas is escaping anywhere.

The Commission's schedule remark for this field reads: PLATS FOR INDIVIDUAL WELLS IN THE FIELD IF THEY CHOOSE.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111992-01-29124299
NGPA2none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6 bbl$146
GasProduction843,089 Mcf$1,589,538
Total$1,589,684

401,890 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4833, -96.3089. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.48329, -96.30894 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,640 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,640 ft.

Completions filed
Oct 2005
1 of 1 wells

1 well

42-29330946212,640 ftOct 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (199)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

199 months

Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20061157.597.75$65
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 2005052661.519.80$5,153
Jul 200502,62055.697.84$20,550
Jun 200503,04852.337.38$22,497
May 200503,73545.226.65$24,842
Apr 200502,38449.207.36$17,547
Mar 200503,06150.377.15$21,901
Feb 200501,52645.226.31$9,632
Jan 200502,31643.166.32$14,642
Dec 200402,85839.866.75$19,295
Nov 200402,73745.286.33$17,326
Oct 200402,76949.706.52$18,040
Sep 200403,00443.245.28$15,873
Aug 200402,53942.375.55$14,093
Jul 200402,72738.286.08$16,592
Jun 200402,88236.106.43$18,540
May 200401,90837.486.49$12,392
Apr 200401,11534.475.86$6,532
Mar 200401,03534.365.53$5,724
Feb 200401,58532.455.51$8,733
Jan 200402,52232.036.30$15,888
Dec 200302,26530.266.30$14,273
Nov 200304,60128.804.60$21,142
Oct 2003071628.174.76$3,408
Sep 200304,21026.314.75$19,995
Aug 200304,97229.765.13$25,505
Jul 200305,05129.415.17$26,118
Jun 200306828.565.98$407
May 200303,01626.595.97$18,014
Apr 200303,68126.675.41$19,904
Mar 200303,05931.146.10$18,648
Feb 200302,91533.487.93$23,104
Jan 200303,48730.315.58$19,465
Dec 200202,97526.914.85$14,440
Nov 200202,73224.664.14$11,302
Oct 200202,99926.464.23$12,683
Sep 200203,80927.443.64$13,846
Aug 200204,13425.963.16$13,081
Jul 200204,90924.583.06$15,030
Jun 200202,89323.733.34$9,658
May 200204,35524.663.58$15,608
Apr 200204,44623.653.51$15,616
Mar 200203,55322.003.10$11,024
Feb 200202,94218.222.38$6,989
Jan 200202,66417.172.38$6,329
Dec 200102,96416.932.36$7,008
Nov 200102,74418.072.41$6,601
Oct 200103,15619.782.53$7,981
Sep 200105,21824.262.25$11,747
Aug 200101,88524.873.05$5,755
Jul 200103,93623.933.20$12,584
Jun 200106,33324.563.82$24,218
May 2001086725.524.31$3,734
Apr 200103,66224.685.34$19,538
Mar 200104,12324.545.38$22,167
Feb 200102,65427.755.77$15,306
Jan 200104,45327.478.40$37,400
Dec 200005,24526.889.12$47,848
Nov 200004,34832.215.66$24,601
Oct 200004,30931.235.15$22,172
Sep 200004,38931.875.19$22,764
Aug 200004,36529.644.54$19,820
Jul 200004,41328.534.09$18,048
Jun 200004,16329.304.40$18,306
May 200003,50327.263.68$12,890
Apr 200004,76124.513.12$14,835
Mar 200004,58928.422.86$13,123
Feb 200004,66527.622.73$12,719
Jan 200004,14425.272.48$10,279
Dec 199903,85324.282.42$9,339
Nov 199904,89323.192.43$11,910
Oct 199904,42020.982.80$12,392
Sep 199904,46921.752.62$11,704
Aug 199905,13719.262.88$14,772
Jul 199905,94917.892.37$14,113
Jun 199904,72615.942.36$11,163
May 199906,62815.792.32$15,384
Apr 199904,80115.102.21$10,601
Mar 199905,88112.471.84$10,811
Feb 199905,7939.981.82$10,530
Jan 199905,61210.381.90$10,663
Dec 199805,9149.201.77$10,487
Nov 199806,08710.892.19$13,304
Oct 199806,15812.421.97$12,126
Sep 199806,45312.592.08$13,439
Aug 199806,04711.301.91$11,534
Jul 199806,39311.742.24$14,303
Jun 199806,06311.242.24$13,565
May 199806,51912.622.21$14,383
Apr 199806,43713.042.51$16,127
Mar 199807,14812.802.31$16,508
Feb 199806,13313.952.30$14,101
Jan 199806,89514.702.15$14,857
Dec 199706,66816.322.41$16,077
Nov 199706,99018.193.09$21,587
Oct 199707,40919.253.15$23,337
Sep 199707,01517.742.95$20,728
Aug 199707,42017.862.55$18,956
Jul 199701,32017.582.25$2,966
Jun 199707,06417.242.26$15,945
May 199707,23218.972.31$16,695
Apr 199707,15417.882.08$14,900
Mar 199707,69518.951.94$14,922
Feb 199706,85820.492.21$15,128
Jan 199707,72623.483.54$27,348
Dec 199607,94123.32$0
Nov 199607,92521.97$0
Oct 199608,16423.31$0
Sep 199607,64822.22$0
Aug 199619,24920.26$20
Jul 199609,27719.55$0
Jun 199608,49718.73$0
May 199609,76219.43$0
Apr 199619,95721.51$22
Mar 1996110,50819.38$19
Feb 199609,76616.98$0
Jan 1996011,39917.07$0
Dec 199508,71317.19$0
Nov 199509,23616.00$0
Oct 1995011,33715.43$0
Sep 199503,34016.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 19950016.41$0
May 199504,42317.56$0
Apr 199509,70817.73$0
Mar 199509,41716.44$0
Feb 199507,86416.58$0
Jan 199508,74015.92$0
Dec 199408,85415.03$0
Nov 199408,24815.90$0
Oct 199408,94415.58$0
Sep 199407,21215.29$0
Aug 199408,32616.13$0
Jul 199408,29417.56$0
Jun 199408,78317.09$0
May 1994010,15615.88$0
Apr 199409,25014.14$0
Mar 1994110,23712.46$12
Feb 199409,31412.50$0
Jan 1994044612.66$0
Dec 199309,91312.33$0
Nov 1993110,25614.49$14
Oct 1993010,05915.85$0
Sep 1993011,24315.03$0
Aug 1993012,14115.66$0
Jul 1993012,76615.46$0
Jun 199306,99016.79$0
May 199309,80017.68$0
Apr 199309,19018.05$0
Mar 199309,71018.14$0
Feb 199308,46417.90$0
Jan 1993010,42316.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2006 — as filed, then multipliedworked
Condensate             1 bbl  × $ 57.59 =        $58
Gas                    1 Mcf  × $  7.75 =         $8

────────────────────────────────────────────────────
Month total                                      $65

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/G/139187 is the state's own key, not one this site invented.