MIDDLETON, RUBY GAS UNIT O/A

Operated by XTO ENERGY INC. (P-5 945936) in the REED (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 158196District 05Field 755094982 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.0 M
Mar 1996 – Nov 2018
Value, last 12 filed months
$824
at the published price for each month
Months reported
273
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 30 leases and 30 wells, and the rule below applies to all of them.

Discovered
1955-02-24
as the register files it
Field class
Gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1996-01-09.

The Commission's schedule remark for this field reads: BUT REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111996-08-12135243
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,082 bbl$36,510
GasProduction1,047,454 Mcf$3,963,969
Total$4,000,479

134,677 Mcf of this lease's gas, across 10 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6874, -96.2083. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.68740, -96.20835 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,900 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,900 ft.

Completions filed
Nov 2018
1 of 1 wells

1 well

42-1613129339,900 ftNov 2018Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (273)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

273 months

Nov 20180052.934.24$0
Oct 201801461.443.40$48
Sep 201802959.543.11$90
Aug 201802359.403.07$71
Jul 201802265.142.93$65
Jun 201802560.183.08$77
May 201802665.382.90$75
Apr 201802663.842.90$75
Mar 201802461.222.79$67
Feb 201802461.782.77$66
Jan 201803062.874.01$120
Dec 201702457.272.92$70
Nov 201703155.423.12$97
Oct 201703249.292.98$95
Sep 201702347.523.09$71
Aug 201703045.373.00$90
Jul 201703643.873.09$111
Jun 201702442.493.09$74
May 201703645.373.26$117
Apr 201703247.933.21$103
Mar 201703446.772.98$101
Feb 201703150.452.95$92
Jan 201702449.413.42$82
Dec 201603148.763.72$115
Nov 201603242.492.64$85
Oct 201603146.193.09$96
Sep 201602741.553.10$84
Aug 201601841.442.92$53
Jul 201602341.622.92$67
Jun 201602345.352.69$62
May 201602742.521.99$54
Apr 20160036.561.99$0
Mar 201603733.011.79$66
Feb 20160026.472.06$0
Jan 201602227.352.36$52
Dec 20150032.362.00$0
Nov 20150138.792.17$2
Oct 20150143.552.43$2
Sep 201502342.992.76$63
Aug 20150140.162.87$3
Jul 201502448.152.95$71
Jun 20150056.152.88$0
May 201502455.212.96$71
Apr 201503549.822.71$95
Mar 20150642.892.93$18
Feb 201503444.662.98$101
Jan 201502243.433.10$68
Dec 201404654.693.59$165
Nov 201402470.464.25$102
Oct 201402578.303.90$98
Sep 201402386.164.05$93
Aug 20140089.394.04$0
Jul 20140196.564.18$4
Jun 20140098.164.74$0
May 20140494.734.73$19
Apr 20140095.944.81$0
Mar 201404495.895.06$223
Feb 201402297.406.19$136
Jan 201404090.404.86$194
Dec 201301291.824.35$52
Nov 201306188.853.74$228
Oct 201302097.423.78$76
Sep 2013020104.113.72$74
Aug 2013040104.253.52$141
Jul 2013024102.523.72$89
Jun 2013029594.403.93$1,160
May 201301,14494.834.15$4,747
Apr 201301,25593.964.28$5,375
Mar 2013084793.623.91$3,314
Feb 201301,50991.233.42$5,161
Jan 201301,07291.603.42$3,666
Dec 201202,02186.773.42$6,912
Nov 201202486.953.62$87
Oct 20120089.383.40$0
Sep 201202194.672.92$61
Aug 201203892.662.91$111
Jul 2012034985.133.02$1,054
Jun 201203,09079.822.52$7,784
May 201201,27791.612.49$3,178
Apr 2012026101.652.00$52
Mar 201201,035105.052.22$2,300
Feb 201201,253101.102.57$3,221
Jan 201201,17498.092.73$3,210
Dec 201102,06696.873.24$6,693
Nov 2011033695.723.31$1,113
Oct 201104984.983.65$179
Sep 201101683.623.99$64
Aug 2011026783.404.15$1,108
Jul 2011016694.144.52$750
Jun 2011014892.904.64$687
May 2011023598.134.40$1,035
Apr 201101,406105.964.33$6,093
Mar 201109796.364.06$394
Feb 2011020685.644.18$861
Jan 201101,72586.504.59$7,916
Dec 201001,15585.734.35$5,022
Nov 201002,38180.843.80$9,037
Oct 201003,02978.103.51$10,628
Sep 201013,02472.633.98$12,107
Aug 201013,22573.684.42$14,326
Jul 201002,69172.554.74$12,746
Jun 2010083570.364.91$4,100
May 201002,67371.124.24$11,321
Apr 201012,79281.694.12$11,592
Mar 201043,06978.394.39$13,782
Feb 2010294573.585.44$5,290
Jan 201001,72774.365.96$10,300
Dec 200902,15071.445.48$11,790
Nov 200903,00374.593.75$11,266
Oct 200902,50472.544.11$10,292
Sep 200903,38465.543.06$10,371
Aug 200902,93267.423.22$9,437
Jul 2009057961.133.46$2,006
Jun 200911,84466.163.90$7,249
May 200901,53354.743.93$6,018
Apr 2009062546.773.59$2,242
Mar 2009061742.144.06$2,504
Feb 200901,21732.814.63$5,638
Jan 200993,43635.865.37$18,778
Dec 2008613,35237.105.98$22,298
Nov 200803,30555.496.86$22,673
Oct 200803,09175.246.92$21,396
Sep 200803,010101.767.88$23,710
Aug 200803,105114.228.48$26,340
Jul 200802,498131.0811.39$28,451
Jun 200801,332131.3313.03$17,359
May 200801,519123.1711.57$17,581
Apr 200861,868110.3110.45$20,192
Mar 200801,862101.909.66$17,995
Feb 200802,77392.538.77$24,321
Jan 200803,01490.388.21$24,732
Dec 200702,28988.337.30$16,714
Nov 200702,19191.677.29$15,976
Oct 200702,67482.856.92$18,509
Sep 200702,61275.846.24$16,310
Aug 200703,94469.066.39$25,194
Jul 200703,34470.906.39$21,361
Jun 200704,49262.007.55$33,908
May 200703,43658.747.85$26,960
Apr 200702,97659.617.81$23,228
Mar 200703,39456.927.30$24,783
Feb 200702,93755.108.22$24,130
Jan 200702,80450.306.73$18,862
Dec 200602,80656.656.92$19,413
Nov 200602,83854.207.62$21,618
Oct 200603,06354.906.01$18,420
Sep 200603,00460.085.04$15,132
Aug 200603,24968.717.34$23,847
Jul 20061683,29069.376.34$32,522
Jun 2006027466.286.38$1,749
May 200603,30866.016.42$21,254
Apr 2006103,55964.397.36$26,840
Mar 2006153,84256.707.08$28,063
Feb 200602,87957.597.75$22,315
Jan 200603,49660.598.93$31,231
Dec 200502,96654.9413.42$39,790
Nov 200503,51754.6910.59$37,239
Oct 200503,52358.3413.80$48,602
Sep 200503,50661.4512.08$42,349
Aug 200503,62061.519.80$35,465
Jul 200503,96255.697.84$31,077
Jun 200523,14552.337.38$23,318
May 200513,29645.226.65$21,967
Apr 200533,68149.207.36$27,242
Mar 200553,65750.377.15$26,417
Feb 200513,45645.226.31$21,859
Jan 200584,31243.166.32$27,607
Dec 200493,90039.866.75$26,688
Nov 200403,91445.286.33$24,777
Oct 200454,04649.706.52$26,609
Sep 200474,40443.245.28$23,573
Aug 200424,92042.375.55$27,394
Jul 200415,02238.286.08$30,593
Jun 200404,19036.106.43$26,954
May 200454,70437.486.49$30,738
Apr 200414,95434.475.86$29,057
Mar 200416,20334.365.53$34,338
Feb 200405,07932.455.51$27,983
Jan 200406,12432.036.30$38,579
Dec 200305,50930.266.30$34,716
Nov 2003957,05028.804.60$35,132
Oct 200307,31428.174.76$34,812
Sep 200368,28026.314.75$39,483
Aug 200314,04029.765.13$20,754
Jul 200316,71729.415.17$34,762
Jun 200338,23328.565.98$49,343
May 200335,32026.595.97$31,854
Apr 200304,81426.675.41$26,031
Mar 200315,09631.146.10$31,097
Feb 200304,70033.487.93$37,252
Jan 200314,69030.315.58$26,210
Dec 200205,62526.914.85$27,302
Nov 200202,91124.664.14$12,043
Oct 200201,16226.464.23$4,914
Sep 200202,13027.443.64$7,743
Aug 200202,28125.963.16$7,217
Jul 200202,04524.583.06$6,261
Jun 200202,52923.733.34$8,442
May 200201,50224.663.58$5,383
Apr 2002212,60223.653.51$9,636
Mar 200202,25122.003.10$6,984
Feb 20020018.222.38$0
Jan 200203,87317.172.38$9,201
Dec 200101,75016.932.36$4,138
Nov 200104,57818.072.41$11,012
Oct 200185,58219.782.53$14,274
Sep 200103,32624.262.25$7,488
Aug 200106,24324.873.05$19,061
Jul 200126,31523.933.20$20,237
Jun 200106,41024.563.82$24,513
May 200158,17425.524.31$35,336
Apr 200125,92724.685.34$31,672
Mar 2001010,15424.545.38$54,592
Feb 2001010,24427.755.77$59,078
Jan 2001413,34727.478.40$112,208
Dec 2000012,72326.889.12$116,066
Nov 2000139,99132.215.66$56,948
Oct 200007,88731.235.15$40,583
Sep 200004,46531.875.19$23,158
Aug 200004,51529.644.54$20,501
Jul 200004,49428.534.09$18,379
Jun 200006,91229.304.40$30,394
May 200006,13927.263.68$22,590
Apr 200004,20324.513.12$13,097
Mar 200005,52128.422.86$15,789
Feb 2000010,70927.622.73$29,198
Jan 200009,22525.272.48$22,883
Dec 199906,98124.282.42$16,920
Nov 1999011,68023.192.43$28,429
Oct 1999616,35520.982.80$45,981
Sep 1999022,95721.752.62$60,121
Aug 1999010,68819.262.88$30,734
Jul 199908,74617.892.37$20,749
Jun 1999018,69015.942.36$44,148
May 1999323,09015.792.32$53,640
Apr 1999042,50415.102.21$93,851
Mar 1999047,20712.471.84$86,782
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 199806359.201.77$1,126
Nov 199803,05510.892.19$6,677
Oct 199803,31012.421.97$6,518
Sep 199804,54712.592.08$9,470
Aug 199804,02711.301.91$7,681
Jul 199804,24911.742.24$9,506
Jun 199805,43711.242.24$12,164
May 199805,76812.622.21$12,726
Apr 199805,06113.042.51$12,679
Mar 199805,32412.802.31$12,295
Feb 199805,81313.952.30$13,365
Jan 199806,48014.702.15$13,963
Dec 199705,66816.322.41$13,666
Nov 199705,61118.193.09$17,328
Oct 199709,55919.253.15$30,109
Sep 199705,26117.742.95$15,546
Aug 19971926,87517.862.55$20,993
Jul 199707,56717.582.25$17,003
Jun 1997010,92017.242.26$24,649
May 199707,83018.972.31$18,076
Apr 199706,65817.882.08$13,867
Mar 1997013,77318.951.94$26,708
Feb 1997013,58520.492.21$29,967
Jan 199707,86223.483.54$27,829
Dec 199617518,69823.32$4,081
Nov 1996018,70621.97$0
Oct 199619430,93623.31$4,522
Sep 1996017,81022.22$0
Aug 199601,76620.26$0
Jul 199601,00719.55$0
Jun 199632,59218.73$56
May 199608,89519.43$0
Apr 19961311,58921.51$280
Mar 1996022,67819.38$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 61.44 =         $0
Gas                   14 Mcf  × $  3.40 =        $48

────────────────────────────────────────────────────
Month total                                      $48

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/G/158196 is the state's own key, not one this site invented.