Operated by HOWITZER OPERATING, LLC (P-5 406661) in the BREMOND (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 174592District 05Field 11776385CondensateGasSaveExport
Value, all time
$1.4 M
Feb 1999 – May 2019
Value, last 12 filed months
$0
at the published price for each month
Months reported
244
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1999-02-11
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 07/01/2000.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition156 bbl$6,646
GasProduction300,079 Mcf$1,429,906
Total$1,436,551

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.2047, -96.6232. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.20470, -96.62321 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,337 ft
1 wells filed one
Completion to plug
3.1 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,337 ft.

Completions filed
May 2019
1 of 1 wells
Plug dates filed
Jun 2022
1 of 1 wells

Last completion to plug: a median of 3.1 years across the 1 well that filed both dates, with the middle half between 3.1 years and 3.1 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3953058017,337 ftMay 2019Jun 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (244)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

244 months

May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 201240094.672.92$3,787
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110592.904.64$23
May 20110798.134.40$31
Apr 201107105.964.33$30
Mar 20110896.364.06$32
Feb 20110685.644.18$25
Jan 20110686.504.59$28
Dec 20100885.734.35$35
Nov 20100780.843.80$27
Oct 20100778.103.51$25
Sep 20100772.633.98$28
Aug 20100673.684.42$27
Jul 20100772.554.74$33
Jun 20100770.364.91$34
May 20100671.124.24$25
Apr 20100681.694.12$25
Mar 20100678.394.39$26
Feb 20100773.585.44$38
Jan 20100874.365.96$48
Dec 20090871.445.48$44
Nov 20090774.593.75$26
Oct 20090872.544.11$33
Sep 20090665.543.06$18
Aug 20090667.423.22$19
Jul 20090961.133.46$31
Jun 20090766.163.90$27
May 200901054.743.93$39
Apr 20090646.773.59$22
Mar 200901242.144.06$49
Feb 20090732.814.63$32
Jan 200901035.865.37$54
Dec 20080837.105.98$48
Nov 200801055.496.86$69
Oct 200801575.246.92$104
Sep 2008010101.767.88$79
Aug 2008012114.228.48$102
Jul 200809131.0811.39$103
Jun 2008048131.3313.03$626
May 2008049123.1711.57$567
Apr 200800110.3110.45$0
Mar 2008080101.909.66$773
Feb 2008013792.538.77$1,202
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 200703350.306.73$222
Dec 200601056.656.92$69
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 200601960.085.04$96
Aug 200601368.717.34$95
Jul 200601469.376.34$89
Jun 200601766.286.38$109
May 200601766.016.42$109
Apr 200602564.397.36$184
Mar 200605456.707.08$382
Feb 200601657.597.75$124
Jan 20060060.598.93$0
Dec 200502454.9413.42$322
Nov 200505054.6910.59$529
Oct 200509658.3413.80$1,324
Sep 2005010261.4512.08$1,232
Aug 2005013261.519.80$1,293
Jul 2005011055.697.84$863
Jun 2005015052.337.38$1,107
May 2005015545.226.65$1,031
Apr 2005019749.207.36$1,450
Mar 2005029950.377.15$2,139
Feb 200501045.226.31$63
Jan 2005010743.166.32$676
Dec 2004026339.866.75$1,776
Nov 2004029445.286.33$1,861
Oct 2004027849.706.52$1,811
Sep 2004029843.245.28$1,575
Aug 2004030142.375.55$1,671
Jul 2004034638.286.08$2,105
Jun 2004026436.106.43$1,698
May 200401,84537.486.49$11,983
Apr 200403134.475.86$182
Mar 200403134.365.53$171
Feb 200402932.455.51$160
Jan 200403132.036.30$195
Dec 200303130.266.30$195
Nov 200303028.804.60$138
Oct 200303128.174.76$148
Sep 200309226.314.75$437
Aug 2003022329.765.13$1,144
Jul 200303229.415.17$165
Jun 200305928.565.98$353
May 200305026.595.97$299
Apr 2003019226.675.41$1,038
Mar 2003027431.146.10$1,670
Feb 2003044633.487.93$3,535
Jan 2003166430.315.58$3,737
Dec 200203,19126.914.85$15,488
Nov 200201,42924.664.14$5,912
Oct 200222,20326.464.23$9,370
Sep 200201,04927.443.64$3,813
Aug 2002120325.963.16$668
Jul 200201,13624.583.06$3,478
Jun 200202,10223.733.34$7,017
May 200211,00824.663.58$3,637
Apr 200203,76523.653.51$13,224
Mar 200209522.003.10$295
Feb 200206018.222.38$143
Jan 200201,00017.172.38$2,376
Dec 200101,01416.932.36$2,398
Nov 200101,25918.072.41$3,029
Oct 200101,56319.782.53$3,953
Sep 2001033124.262.25$745
Aug 200102,31524.873.05$7,068
Jul 200103,12023.933.20$9,975
Jun 200103,41524.563.82$13,060
May 200114,71525.524.31$20,335
Apr 200104,74024.685.34$25,289
Mar 20011105,42424.545.38$31,861
Feb 200101,39627.755.77$8,051
Jan 200108,89127.478.40$74,673
Dec 2000026,36526.889.12$240,515
Nov 2000013,35432.215.66$75,557
Oct 2000024,93231.235.15$128,288
Sep 2000025,35631.875.19$131,509
Aug 2000017,77629.644.54$80,716
Jul 2000024,29828.534.09$99,373
Jun 2000028,53329.304.40$125,467
May 2000019,16627.263.68$70,526
Apr 2000016,17424.513.12$50,398
Mar 2000014,02028.422.86$40,094
Feb 2000014,02827.622.73$38,247
Jan 2000011,69125.272.48$29,000
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 199905829.981.82$1,058

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2012 — as filed, then multipliedworked
Condensate            40 bbl  × $ 94.67 =     $3,787
Gas                    0 Mcf  × $  2.92 =         $0

────────────────────────────────────────────────────
Month total                                   $3,787

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/G/174592 is the state's own key, not one this site invented.