Operated by COMSTOCK OIL & GAS, LP (P-5 170040) in the BOX CHURCH (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 176373District 05Field 109741002 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.7 M
Feb 2000 – Apr 2007
Value, last 12 filed months
$275
at the published price for each month
Months reported
87
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 52 leases and 52 wells, and the rule below applies to all of them.

Discovered
1982-03-24
as the register files it
Field class
Gas
the register's own label
Between wells
600 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-05-29.

The Commission's schedule remark for this field reads: WILL REMAIN SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112000-04-14141600
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition887 bbl$27,646
GasProduction778,469 Mcf$3,691,105
Total$3,718,751

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.5207, -96.4604. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.52068, -96.46035 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,350 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,350 ft.

Completions filed
Aug 2013
1 of 1 wells

1 well

42-2933131359,350 ftAug 2013Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (87)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

87 months

Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20065054.906.01$275
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 200603664.397.36$265
Mar 20060056.707.08$0
Feb 200609557.597.75$736
Jan 2006010860.598.93$965
Dec 200501054.9413.42$134
Nov 200504254.6910.59$445
Oct 200503,14858.3413.80$43,429
Sep 200504,23261.4512.08$51,118
Aug 200503,35161.519.80$32,829
Jul 200503,53155.697.84$27,696
Jun 200514,90552.337.38$36,256
May 200503,93945.226.65$26,199
Apr 200505,78149.207.36$42,551
Mar 2005385,36250.377.15$40,279
Feb 20051055,56845.226.31$39,893
Jan 200504,98143.166.32$31,491
Dec 200405,81839.866.75$39,278
Nov 200404,86145.286.33$30,772
Oct 200404,50049.706.52$29,318
Sep 200406,12143.245.28$32,343
Aug 200405,65042.375.55$31,361
Jul 200405,97938.286.08$36,377
Jun 200406,67536.106.43$42,940
May 200407,43337.486.49$48,274
Apr 2004887,37934.475.86$46,263
Mar 200408,02834.365.53$44,396
Feb 200437,71132.455.51$42,582
Jan 200409,49332.036.30$59,802
Dec 200308,61330.266.30$54,276
Nov 2003011,33228.804.60$52,072
Oct 200308,23128.174.76$39,177
Sep 200307,99226.314.75$37,957
Aug 200308,40529.765.13$43,115
Jul 200308,71829.415.17$45,079
Jun 200305,52028.565.98$33,026
May 2003011,25726.595.97$67,234
Apr 2003011,87726.675.41$64,222
Mar 200305,77631.146.10$35,211
Feb 200316,00333.487.93$47,613
Jan 20038010,80930.315.58$62,761
Dec 2002012,76726.914.85$61,968
Nov 2002049024.664.14$2,027
Oct 2002011,76926.464.23$49,773
Sep 200208,75527.443.64$31,826
Aug 200229,67925.963.16$30,678
Jul 2002013,60824.583.06$41,664
Jun 2002152023.733.34$1,760
May 2002512,30924.663.58$44,239
Apr 200237,22823.653.51$25,458
Mar 2002713,09922.003.10$40,797
Feb 2002313,15118.222.38$31,297
Jan 20026816,66717.172.38$40,763
Dec 2001013,30016.932.36$31,447
Nov 2001017,30418.072.41$41,625
Oct 2001112,47019.782.53$31,555
Sep 2001211,30124.262.25$25,491
Aug 2001216,96124.873.05$51,834
Jul 2001116,64923.933.20$53,252
Jun 20017719,20424.563.82$75,330
May 2001321,55725.524.31$92,929
Apr 20011118,26524.685.34$97,721
Mar 2001215,74524.545.38$84,701
Feb 20019016,39727.755.77$97,060
Jan 2001218,97627.478.40$159,430
Dec 2000117,64826.889.12$161,021
Nov 20008318,48232.215.66$107,245
Oct 2000121,38331.235.15$110,057
Sep 2000712,15731.875.19$63,275
Aug 20006915,07429.644.54$70,492
Jul 2000016,11328.534.09$65,898
Jun 20006330,81229.304.40$137,334
May 2000032,85127.263.68$120,883
Apr 20004328,12124.513.12$88,679
Mar 20001930,22528.422.86$86,976
Feb 200008,16227.622.73$22,254

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2006 — as filed, then multipliedworked
Condensate             5 bbl  × $ 54.90 =       $275
Gas                    0 Mcf  × $  6.01 =         $0

────────────────────────────────────────────────────
Month total                                     $275

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/G/176373 is the state's own key, not one this site invented.