NEWELL "A"

Operated by XTO ENERGY INC. (P-5 945936) in the BRANTON (RODESSA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 178678District 05Field 11470800CondensateGasSaveExport
Value, all time
$8.5 M
Jul 2000 – Feb 2010
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
116
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 12 leases and 12 wells, and the rule below applies to all of them.

Discovered
1985-04-25
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 11/01/2003.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition24,350 bbl$692,311
GasProduction1,525,987 Mcf$7,840,768
Total$8,533,079

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.3590, -96.2607. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.35896, -96.26074 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,709 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,709 ft.

Completions filed
Jun 2009
1 of 1 wells

1 well

42-289313214 C9,709 ftJun 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (116)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

116 months

Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 200972071.445.48$5,144
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 2009010154.743.93$397
Apr 2009011546.773.59$413
Mar 2009011242.144.06$455
Feb 2009011832.814.63$547
Jan 2009012335.865.37$661
Dec 2008012037.105.98$717
Nov 2008010855.496.86$741
Oct 2008010375.246.92$713
Sep 20080117101.767.88$922
Aug 20080138114.228.48$1,171
Jul 20080127131.0811.39$1,446
Jun 20080113131.3313.03$1,473
May 20080127123.1711.57$1,470
Apr 20080108110.3110.45$1,129
Mar 20080125101.909.66$1,208
Feb 2008011192.538.77$974
Jan 2008012390.388.21$1,009
Dec 2007020288.337.30$1,475
Nov 2007069091.677.29$5,031
Oct 2007147382.856.92$3,357
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070262.007.55$15
May 200704358.747.85$337
Apr 200703759.617.81$289
Mar 200707656.927.30$555
Feb 200702555.108.22$205
Jan 200706950.306.73$464
Dec 200608156.656.92$560
Nov 200601954.207.62$145
Oct 200601554.906.01$90
Sep 200609760.085.04$489
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 200601266.286.38$77
May 2006036866.016.42$2,364
Apr 2006074164.397.36$5,454
Mar 200601,37556.707.08$9,739
Feb 200601,21757.597.75$9,433
Jan 200601,95960.598.93$17,500
Dec 20051972,38754.9413.42$42,846
Nov 200502,23754.6910.59$23,686
Oct 200502,76258.3413.80$38,104
Sep 200503,73261.4512.08$45,079
Aug 20051895,45361.519.80$65,048
Jul 200506,50255.697.84$50,999
Jun 200506,18052.337.38$45,615
May 20051846,40945.226.65$50,948
Apr 200507,15249.207.36$52,642
Mar 200502,94950.377.15$21,100
Feb 200502,00145.226.31$12,630
Jan 2005017843.166.32$1,125
Dec 2004092839.866.75$6,265
Nov 200417,74345.286.33$49,062
Oct 200406,92449.706.52$45,111
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 200401,24836.106.43$8,028
May 20041837,87337.486.49$57,991
Apr 2004115,65134.475.86$91,725
Mar 200418420,97434.365.53$122,311
Feb 200418612,98732.455.51$77,589
Jan 200418923,56732.036.30$154,517
Dec 200337432,47930.266.30$215,988
Nov 200337333,20328.804.60$163,316
Oct 200336324,74828.174.76$128,017
Sep 200318522,25726.314.75$110,574
Aug 200301,16129.765.13$5,956
Jul 200302,22029.415.17$11,479
Jun 2003115,39728.565.98$92,148
May 200337315,16926.595.97$100,518
Apr 2003115,13326.675.41$81,855
Mar 2003013,91731.146.10$84,839
Feb 20031919,17333.487.93$79,099
Jan 2003010,73530.315.58$59,923
Dec 20021808,65726.914.85$46,863
Nov 200219116,54524.664.14$73,156
Oct 200218916,04926.464.23$72,874
Sep 2002013,62627.443.64$49,533
Aug 20021966,26325.963.16$24,905
Jul 200239426,02824.583.06$89,376
Jun 200219822,93123.733.34$81,248
May 200238717,44324.663.58$72,059
Apr 200219115,70423.653.51$59,675
Mar 2002011,90822.003.10$36,947
Feb 200206,82918.222.38$16,224
Jan 20021865,20917.172.38$15,569
Dec 200118320,60916.932.36$51,826
Nov 200137428,30018.072.41$74,834
Oct 200156642,56019.782.53$118,825
Sep 200175646,96024.262.25$124,063
Aug 200175245,67524.873.05$158,155
Jul 200137525,86123.933.20$91,653
Jun 200154538,21824.563.82$159,537
May 200193562,57125.524.31$293,375
Apr 20011,12465,76224.685.34$378,602
Mar 200194248,35624.545.38$283,100
Feb 20011,08465,47127.755.77$407,657
Jan 20011,34074,64527.478.40$663,735
Dec 20001,16868,06226.889.12$652,291
Nov 20001,49971,59432.215.66$453,362
Oct 20001,64589,23431.235.15$510,527
Sep 20002,19394,85031.875.19$561,830
Aug 20002,745103,18029.644.54$549,876
Jul 200076415,96828.534.09$87,102

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2009 — as filed, then multipliedworked
Condensate            72 bbl  × $ 71.44 =     $5,144
Gas                    0 Mcf  × $  5.48 =         $0

────────────────────────────────────────────────────
Month total                                   $5,144

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/G/178678 is the state's own key, not one this site invented.