PYLE, HB GU1

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the NAN-SU-GAIL (CV CONSOLIDATED) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 218172District 05Field 644092102 tax incentive programmesGasSaveExport
Value, all time
$701 k
Jan 2006 – May 2026
Value, last 12 filed months
$8 k
at the published price for each month
Months reported
245
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 300 leases and 300 wells, and the rule below applies to all of them.

Discovered
2002-10-08
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2016-10-11.

The Commission's schedule remark for this field reads: BETWEEN WELL SPACING.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-09-25168364
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction110,698 Mcf$701,352
Total$701,352

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7079, -96.0771. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.70787, -96.07712 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,902 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,902 ft.

Completions filed
Jan 2006
1 of 1 wells

1 well

42-16133402512,902 ftJan 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (245)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

245 months

May 20260106.413.05$0
Apr 2026098.932.87$0
Mar 2026089.753.15$0
Feb 20263963.503.75$146
Jan 202647259.138.00$3,775
Dec 202560456.664.41$2,666
Nov 202518358.593.93$719
Oct 20251759.383.30$56
Sep 2025062.743.08$0
Aug 2025063.933.01$0
Jul 2025066.743.32$0
Jun 202518466.483.13$576
May 202519560.553.23$630
Apr 202519462.363.54$687
Mar 20255067.704.27$213
Feb 2025070.884.34$0
Jan 20251674.324.28$68
Dec 20243068.993.12$94
Nov 20243969.052.20$86
Oct 20244571.372.28$103
Sep 20246069.612.36$142
Aug 20247475.632.06$153
Jul 20246579.932.15$140
Jun 2024078.082.63$0
May 20242178.812.20$46
Apr 20242084.451.66$33
Mar 20242380.301.55$36
Feb 20242776.091.78$48
Jan 20245373.023.30$175
Dec 20234971.262.61$128
Nov 20233577.892.81$98
Oct 20233585.443.09$108
Sep 20236489.042.74$175
Aug 20231480.522.67$37
Jul 20233874.852.64$100
Jun 20232868.962.26$63
May 20234770.622.23$105
Apr 20235578.122.24$123
Mar 202313772.852.39$328
Feb 202324875.112.47$611
Jan 2023076.533.39$0
Dec 2022076.415.73$0
Nov 20221585.005.65$85
Oct 2022087.185.86$0
Sep 2022084.888.16$0
Aug 2022094.529.13$0
Jul 20220101.587.54$0
Jun 202233115.097.98$263
May 202232109.378.43$270
Apr 2022177104.226.84$1,210
Mar 20220108.885.08$0
Feb 2022591.054.86$24
Jan 20221881.844.54$82
Dec 20211971.323.90$74
Nov 20211977.435.24$100
Oct 20211879.795.71$103
Sep 20211569.865.35$80
Aug 20213266.024.22$135
Jul 2021370.783.98$12
Jun 20211169.493.38$37
May 20212163.483.02$63
Apr 20214860.362.76$132
Mar 20212761.302.72$73
Feb 20213257.805.55$178
Jan 20216350.412.81$177
Dec 20206644.642.68$177
Nov 20206638.772.71$179
Oct 20205736.972.48$141
Sep 20205637.091.99$112
Aug 20206939.982.39$165
Jul 20207238.371.83$131
Jun 20208534.901.69$144
May 20208516.921.81$154
Apr 20207814.751.80$141
Mar 20209230.341.86$171
Feb 20206549.881.98$129
Jan 20208057.252.09$168
Dec 20195659.012.30$129
Nov 20195155.302.75$140
Oct 20196053.472.42$145
Sep 20192455.052.66$64
Aug 20193953.112.30$90
Jul 20195556.272.46$135
Jun 20194152.782.49$102
May 20195758.482.74$156
Apr 20196962.632.75$190
Mar 201913256.803.06$404
Feb 20196350.852.79$176
Jan 20194246.033.23$136
Dec 20186246.594.19$260
Nov 20183852.934.24$161
Oct 20183761.443.40$126
Sep 20186159.543.11$190
Aug 20186959.403.07$212
Jul 20184265.142.93$123
Jun 20183860.183.08$117
May 20185765.382.90$165
Apr 20185863.842.90$168
Mar 20187361.222.79$203
Feb 20188261.782.77$227
Jan 201810462.874.01$417
Dec 201710157.272.92$295
Nov 201710955.423.12$340
Oct 201713049.292.98$388
Sep 201713347.523.09$411
Aug 20179445.373.00$282
Jul 201710643.873.09$327
Jun 201710942.493.09$337
May 201715645.373.26$509
Apr 201711247.933.21$360
Mar 201712746.772.98$379
Feb 201711350.452.95$334
Jan 201715049.413.42$513
Dec 201612348.763.72$458
Nov 201613642.492.64$360
Oct 201614046.193.09$433
Sep 201613341.553.10$412
Aug 201622041.442.92$643
Jul 201630441.622.92$889
Jun 20167645.352.69$204
May 201611942.521.99$237
Apr 2016036.561.99$0
Mar 20169933.011.79$178
Feb 2016026.472.06$0
Jan 20167727.352.36$182
Dec 201510632.362.00$212
Nov 201512938.792.17$280
Oct 201512043.552.43$291
Sep 201511442.992.76$314
Aug 201510840.162.87$310
Jul 201510848.152.95$318
Jun 20159656.152.88$277
May 201510555.212.96$310
Apr 20159649.822.71$260
Mar 20159642.892.93$282
Feb 20159144.662.98$271
Jan 20159943.433.10$307
Dec 20147254.693.59$259
Nov 20149870.464.25$417
Oct 201412378.303.90$480
Sep 20146086.164.05$243
Aug 20143889.394.04$153
Jul 20148596.564.18$355
Jun 20145498.164.74$256
May 20141594.734.73$71
Apr 20142195.944.81$101
Mar 20142395.895.06$116
Feb 20144097.406.19$248
Jan 20145990.404.86$287
Dec 20138091.824.35$348
Nov 20138588.853.74$318
Oct 20137697.423.78$287
Sep 201348104.113.72$178
Aug 201337104.253.52$130
Jul 201350102.523.72$186
Jun 20135394.403.93$208
May 20139294.834.15$382
Apr 201312593.964.28$535
Mar 201310993.623.91$427
Feb 20139791.233.42$332
Jan 201317591.603.42$598
Dec 20122586.773.42$86
Nov 20124086.953.62$145
Oct 201219289.383.40$653
Sep 201217494.672.92$508
Aug 201213392.662.91$387
Jul 201214585.133.02$438
Jun 201218079.822.52$453
May 201218791.612.49$465
Apr 2012318101.652.00$635
Mar 2012300105.052.22$667
Feb 2012869101.102.57$2,234
Jan 201220798.092.73$566
Dec 201126396.873.24$852
Nov 201121795.723.31$719
Oct 201112284.983.65$445
Sep 201116683.623.99$662
Aug 201143183.404.15$1,788
Jul 201120694.144.52$931
Jun 201115992.904.64$738
May 201120398.134.40$894
Apr 2011217105.964.33$940
Mar 201136296.364.06$1,469
Feb 201148885.644.18$2,040
Jan 201154086.504.59$2,478
Dec 201039585.734.35$1,717
Nov 201048380.843.80$1,833
Oct 201068778.103.51$2,411
Sep 20101,05972.633.98$4,214
Aug 201034473.684.42$1,520
Jul 201053972.554.74$2,553
Jun 201050470.364.91$2,475
May 201037871.124.24$1,601
Apr 201052181.694.12$2,148
Mar 201062178.394.39$2,725
Feb 201053273.585.44$2,895
Jan 201063974.365.96$3,811
Dec 200954471.445.48$2,983
Nov 200965174.593.75$2,442
Oct 20091,13672.544.11$4,669
Sep 200973165.543.06$2,240
Aug 200975467.423.22$2,427
Jul 200970661.133.46$2,446
Jun 20091,10966.163.90$4,320
May 200948654.743.93$1,908
Apr 200958246.773.59$2,088
Mar 20091,38242.144.06$5,610
Feb 200985932.814.63$3,980
Jan 200989135.865.37$4,786
Dec 200836137.105.98$2,158
Nov 200842355.496.86$2,902
Oct 200852575.246.92$3,634
Sep 2008536101.767.88$4,222
Aug 2008300114.228.48$2,545
Jul 20081,053131.0811.39$11,993
Jun 2008514131.3313.03$6,699
May 2008806123.1711.57$9,329
Apr 2008979110.3110.45$10,235
Mar 20081,337101.909.66$12,921
Feb 200895392.538.77$8,358
Jan 20081,16890.388.21$9,584
Dec 20071,12388.337.30$8,200
Nov 20071,26891.677.29$9,246
Oct 20071,02882.856.92$7,116
Sep 20071,06075.846.24$6,619
Aug 20071,75069.066.39$11,179
Jul 20071,91470.906.39$12,227
Jun 20071,57862.007.55$11,911
May 20071,72958.747.85$13,566
Apr 20071,93559.617.81$15,103
Mar 20072,11356.927.30$15,429
Feb 20071,97155.108.22$16,194
Jan 20072,01950.306.73$13,582
Dec 20062,47756.656.92$17,137
Nov 20062,60854.207.62$19,866
Oct 20062,84754.906.01$17,121
Sep 20062,72160.085.04$13,706
Aug 20063,29868.717.34$24,207
Jul 20063,42169.376.34$21,699
Jun 20063,37266.286.38$21,526
May 20063,85066.016.42$24,736
Apr 20063,72964.397.36$27,447
Mar 20064,81456.707.08$34,097
Feb 20065,61957.597.75$43,554
Jan 20068,94260.598.93$79,882

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2026 — as filed, then multipliedworked
Gas                   39 Mcf  × $  3.75 =       $146

────────────────────────────────────────────────────
Month total                                     $146

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/G/218172 is the state's own key, not one this site invented.