CLUTE-DIEHL GAS UNIT NO. 1

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the JEWETT (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 234838District 05Field 463356002 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.4 M
Jan 2008 – May 2026
Value, last 12 filed months
$13 k
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 71 leases and 71 wells, and the rule below applies to all of them.

Discovered
1973-09-10
as the register files it
Field class
Gas
the register's own label
Between wells
600 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2008-08-12.

The Commission's schedule remark for this field reads: INTERVAL 9824'-12390',ALLOCATION FORMULA SHALL REMAIN SUSP.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112009-03-30182060
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition225 bbl$19,213
GasProduction533,022 Mcf$3,358,176
Total$3,377,389

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.3803, -96.1204. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.38032, -96.12042 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,152 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,152 ft.

Completions filed
Jan 2008
1 of 1 wells

1 well

42-28931703711,152 ftJan 2008

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

May 20260258106.413.05$786
Apr 2026025298.932.87$723
Mar 2026027289.753.15$857
Feb 2026025363.503.75$949
Jan 2026027959.138.00$2,231
Dec 2025026656.664.41$1,174
Nov 2025031158.593.93$1,221
Oct 2025025559.383.30$843
Sep 2025028962.743.08$889
Aug 2025028263.933.01$850
Jul 2025031066.743.32$1,028
Jun 2025030466.483.13$951
May 2025029860.553.23$963
Apr 2025030662.363.54$1,084
Mar 2025032767.704.27$1,396
Feb 2025126370.884.34$1,213
Jan 2025030374.324.28$1,296
Dec 2024030568.993.12$952
Nov 2024130169.052.20$731
Oct 2024030471.372.28$694
Sep 2024432469.612.36$1,044
Aug 2024033375.632.06$687
Jul 2024031779.932.15$680
Jun 2024033378.082.63$877
May 2024031978.812.20$701
Apr 2024030884.451.66$511
Mar 2024032280.301.55$498
Feb 2024024976.091.78$444
Jan 2024021573.023.30$709
Dec 2023021371.262.61$556
Nov 2023020377.892.81$570
Oct 2023022885.443.09$704
Sep 2023021789.042.74$594
Aug 2023021780.522.67$580
Jul 2023020274.852.64$534
Jun 2023023368.962.26$526
May 2023017370.622.23$385
Apr 2023022678.122.24$506
Mar 2023020372.852.39$486
Feb 2023014375.112.47$353
Jan 2023026676.533.39$901
Dec 2022042676.415.73$2,441
Nov 2022016685.005.65$937
Oct 2022027487.185.86$1,607
Sep 2022016784.888.16$1,363
Aug 202207794.529.13$703
Jul 20220291101.587.54$2,195
Jun 2022082115.097.98$654
May 20220194109.378.43$1,636
Apr 20220213104.226.84$1,456
Mar 20220213108.885.08$1,081
Feb 2022021691.054.86$1,050
Jan 2022047781.844.54$2,164
Dec 2021048671.323.90$1,895
Nov 2021053877.435.24$2,817
Oct 2021036079.795.71$2,057
Sep 2021020069.865.35$1,070
Aug 2021051766.024.22$2,182
Jul 2021059570.783.98$2,369
Jun 202105,50469.493.38$18,607
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 2020025238.371.83$460
Jun 2020041434.901.69$700
May 2020043716.921.81$793
Apr 2020038614.751.80$696
Mar 2020017330.341.86$321
Feb 2020030849.881.98$610
Jan 2020035957.252.09$752
Dec 2019030959.012.30$712
Nov 2019033855.302.75$930
Oct 2019054553.472.42$1,318
Sep 2019043255.052.66$1,148
Aug 2019039153.112.30$901
Jul 2019066756.272.46$1,641
Jun 2019045052.782.49$1,121
May 2019044258.482.74$1,211
Apr 2019053262.632.75$1,463
Mar 2019054656.803.06$1,672
Feb 2019053450.852.79$1,491
Jan 2019054046.033.23$1,743
Dec 2018038846.594.19$1,624
Nov 2018090252.934.24$3,822
Oct 2018037761.443.40$1,281
Sep 2018039759.543.11$1,234
Aug 2018057259.403.07$1,754
Jul 2018060365.142.93$1,768
Jun 2018060960.183.08$1,874
May 2018065665.382.90$1,903
Apr 2018059163.842.90$1,714
Mar 2018061861.222.79$1,722
Feb 2018061761.782.77$1,707
Jan 2018060362.874.01$2,418
Dec 2017067557.272.92$1,972
Nov 2017084355.423.12$2,629
Oct 2017067249.292.98$2,005
Sep 2017064747.523.09$1,997
Aug 2017053745.373.00$1,613
Jul 2017090043.873.09$2,779
Jun 2017055042.493.09$1,698
May 201701,00245.373.26$3,270
Apr 2017070347.933.21$2,258
Mar 2017068246.772.98$2,035
Feb 2017075450.452.95$2,226
Jan 201701,00949.413.42$3,450
Dec 2016080948.763.72$3,012
Nov 2016080042.492.64$2,115
Oct 201601,10546.193.09$3,415
Sep 2016098041.553.10$3,039
Aug 201601,01441.442.92$2,965
Jul 201601,74941.622.92$5,115
Jun 201603,29445.352.69$8,847
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 2016021527.352.36$508
Dec 201501,74932.362.00$3,500
Nov 201501,63138.792.17$3,535
Oct 201501,62643.552.43$3,946
Sep 201501,72342.992.76$4,753
Aug 201501,89540.162.87$5,443
Jul 201501,92548.152.95$5,669
Jun 201501,80756.152.88$5,209
May 201501,78655.212.96$5,278
Apr 201581,86149.822.71$5,435
Mar 201501,75342.892.93$5,145
Feb 201531,68044.662.98$5,134
Jan 201501,87743.433.10$5,820
Dec 201431,90354.693.59$6,998
Nov 201401,90970.464.25$8,117
Oct 201402,14678.303.90$8,371
Sep 201421,99486.164.05$8,239
Aug 201432,13389.394.04$8,875
Jul 201412,14696.564.18$9,066
Jun 201402,18698.164.74$10,355
May 201412,31494.734.73$11,032
Apr 201412,18795.944.81$10,613
Mar 201402,22195.895.06$11,231
Feb 201411,88797.406.19$11,782
Jan 201402,29690.404.86$11,160
Dec 201302,10791.824.35$9,175
Nov 201301,92888.853.74$7,207
Oct 201302,12897.423.78$8,042
Sep 201301,962104.113.72$7,294
Aug 201307,973104.253.52$28,086
Jul 201302,270102.523.72$8,439
Jun 201302,26194.403.93$8,893
May 201302,25094.834.15$9,335
Apr 201302,17993.964.28$9,332
Mar 201301,55293.623.91$6,073
Feb 201301,50091.233.42$5,130
Jan 201301,89291.603.42$6,470
Dec 201202,01486.773.42$6,888
Nov 201202,06786.953.62$7,493
Oct 201212,12089.383.40$7,297
Sep 201201,99994.672.92$5,834
Aug 201202,07992.662.91$6,046
Jul 201203,08285.133.02$9,310
Jun 201202,84479.822.52$7,164
May 201222,17691.612.49$5,598
Apr 201202,428101.652.00$4,848
Mar 201202,708105.052.22$6,017
Feb 201202,699101.102.57$6,937
Jan 201203,30898.092.73$9,044
Dec 201103,34696.873.24$10,840
Nov 201103,22795.723.31$10,686
Oct 201103,39384.983.65$12,380
Sep 201103,42283.623.99$13,639
Aug 201103,59583.404.15$14,917
Jul 201103,57194.144.52$16,131
Jun 201103,61692.904.64$16,778
May 201103,86698.134.40$17,029
Apr 201104,148105.964.33$17,974
Mar 2011704,29696.364.06$24,176
Feb 201102,27585.644.18$9,509
Jan 201102,16686.504.59$9,939
Dec 201012,23485.734.35$9,799
Nov 201042,04580.843.80$8,085
Oct 201002,25878.103.51$7,923
Sep 201022,44872.633.98$9,887
Aug 201021,81573.684.42$8,169
Jul 201012,51472.554.74$11,980
Jun 201052,30170.364.91$11,651
May 201002,83571.124.24$12,007
Apr 201032,93181.694.12$12,329
Mar 201033,09978.394.39$13,836
Feb 201002,57873.585.44$14,030
Jan 2010193,16074.365.96$20,259
Dec 200923,14371.445.48$17,378
Nov 2009103,48674.593.75$13,824
Oct 200903,77572.544.11$15,516
Sep 200913,99165.543.06$12,297
Aug 200914,36767.423.22$14,123
Jul 200924,64761.133.46$16,222
Jun 200924,99366.163.90$19,580
May 200915,31754.743.93$20,928
Apr 200925,19046.773.59$18,713
Mar 200916,19642.144.06$25,192
Feb 200917,22932.814.63$33,525
Jan 2009010,85635.865.37$58,308
Dec 200838,97437.105.98$53,750
Nov 200808,87755.496.86$60,899
Oct 200809,81075.246.92$67,905
Sep 2008010,041101.767.88$79,094
Aug 2008112,522114.228.48$106,339
Jul 2008014,508131.0811.39$165,238
Jun 2008217,836131.3313.03$232,713
May 2008025,667123.1711.57$297,077
Apr 20081022,885110.3110.45$240,363
Mar 20081236,113101.909.66$350,221
Feb 20081435,08292.538.77$308,985
Jan 20081834,31190.388.21$283,174

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  258 Mcf  × $  3.05 =       $786

────────────────────────────────────────────────────
Month total                                     $786

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/G/234838 is the state's own key, not one this site invented.