Operated by CORSICANA CRUDE COMPANY, LLC (P-5 179832) in the CORSICANA (SHALLOW) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 286District 05Field 20823500OilCasinghead gasSaveExport
Value, all time
$306 k
Jan 1993 – May 2026
Value, last 12 filed months
$9 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 594 leases and 5,880 wells, and the rule below applies to all of them.

Discovered
1896-01-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
150 ft
minimum

A drilling unit in this field needs at least 2 acres. The field rule took effect on 2007-03-29.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 08/01/88.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition4,672 bbl$306,398
Casinghead gasProduction6 Mcf$0
Total$306,398

6 Mcf of this lease's gas, across 6 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (16)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0936, -96.3836. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

32.09374, -96.38353 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
62.5%
10 of 16 wells
With a plug date
56.3%
9 of 16 wells
Median depth
867 ft
15 wells filed one
Completion to plug
19.8 years
median over 2 wells

What the state filed about each well

On the RRC proration schedule
1062.5%
A plug date is filed
956.3%
BothOn the schedule and plugged. Neither fact cancels the other.
956.3%
NeitherNo plug date, and not on the schedule.
637.5%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 15 of 16 wells. Median 867 ft, with the middle half between 843 and 894 ft; the shallowest is 785 ft and the deepest 925 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 8 of 16 wells, Sep 1962 – May 2008. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Sep 1962 – May 2008
8 of 16 wells; 8 filed none
Plug dates filed
Nov 1970 – Aug 2013
9 of 16 wells; 7 filed none

Last completion to plug: a median of 19.8 years across the 2 wells that filed both dates, with the middle half between 13.8 years and 26.0 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

16 wells

42-349809991867 ftNov 1970Yes
42-349810002I922 ftAug 2013Yes
42-349810013785 ftMay 1985Yes
42-349810023I887 ftOct 1994Yes
42-349831611I867 ftOct 1994Yes
42-349831622Yes
42-349831632R863 ftAug 1985Yes
42-349831644884 ftMay 2013Yes
42-34934829I207925 ftMay 2008
42-34934830I208912 ftMay 2008
42-34934839N204900 ftApr 2008
42-349340062RR870 ftOct 1985
42-349339306830 ftAug 1985
42-349339175800 ftMay 1985
42-349302722 R836 ftMar 1975Oct 1982Yes
42-349020944I849 ftSep 1962Oct 1994Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 202566056.664.41$3,740
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 202572066.743.32$4,805
Jun 20250066.483.13$0
May 202586060.553.23$5,207
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 2025126074.324.28$9,364
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 202437071.372.28$2,641
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20244073.023.30$292
Dec 20230071.262.61$0
Nov 20234077.892.81$312
Oct 20238085.443.09$684
Sep 20238089.042.74$712
Aug 20234080.522.67$322
Jul 20238074.852.64$599
Jun 202314068.962.26$965
May 20230070.622.23$0
Apr 202313078.122.24$1,016
Mar 20238072.852.39$583
Feb 202314075.112.47$1,052
Jan 202330076.533.39$2,296
Dec 202231076.415.73$2,369
Nov 202216085.005.65$1,360
Oct 202233087.185.86$2,877
Sep 202232084.888.16$2,716
Aug 202232094.529.13$3,025
Jul 2022340101.587.54$3,454
Jun 2022150115.097.98$1,726
May 2022300109.378.43$3,281
Apr 2022320104.226.84$3,335
Mar 2022160108.885.08$1,742
Feb 202216091.054.86$1,457
Jan 202214081.844.54$1,146
Dec 202116071.323.90$1,141
Nov 202142077.435.24$3,252
Oct 20210079.795.71$0
Sep 202116069.865.35$1,118
Aug 20210066.024.22$0
Jul 202112070.783.98$849
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 202111060.362.76$664
Mar 20210061.302.72$0
Feb 202113057.805.55$751
Jan 202110050.412.81$504
Dec 20200044.642.68$0
Nov 20208038.772.71$310
Oct 202018036.972.48$665
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 202022038.371.83$844
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20208049.881.98$399
Jan 20200057.252.09$0
Dec 20195059.012.30$295
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 201911055.052.66$606
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 201913056.803.06$738
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 201813046.594.19$606
Nov 20180052.934.24$0
Oct 201812061.443.40$737
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 201816065.142.93$1,042
Jun 20180060.183.08$0
May 201814065.382.90$915
Apr 20180063.842.90$0
Mar 201815061.222.79$918
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 201715057.272.92$859
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 201715047.523.09$713
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 201714042.493.09$595
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 201714046.772.98$655
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 201615041.553.10$623
Aug 201625041.442.92$1,036
Jul 201626041.622.92$1,082
Jun 201620045.352.69$907
May 201629042.521.99$1,233
Apr 201637036.561.99$1,353
Mar 201630033.011.79$990
Feb 201622026.472.06$582
Jan 201620027.352.36$547
Dec 201510032.362.00$324
Nov 201522038.792.17$853
Oct 201524043.552.43$1,045
Sep 201527042.992.76$1,161
Aug 201522040.162.87$884
Jul 201530048.152.95$1,445
Jun 201529056.152.88$1,628
May 201529055.212.96$1,601
Apr 201530049.822.71$1,495
Mar 201524042.892.93$1,029
Feb 201516044.662.98$715
Jan 201514043.433.10$608
Dec 201415054.693.59$820
Nov 201414070.464.25$986
Oct 201424078.303.90$1,879
Sep 201421086.164.05$1,809
Aug 201420089.394.04$1,788
Jul 201425096.564.18$2,414
Jun 201420098.164.74$1,963
May 201418094.734.73$1,705
Apr 201424095.944.81$2,303
Mar 201424095.895.06$2,301
Feb 201425097.406.19$2,435
Jan 201421090.404.86$1,898
Dec 201325091.824.35$2,296
Nov 201316088.853.74$1,422
Oct 201324097.423.78$2,338
Sep 2013290104.113.72$3,019
Aug 2013260104.253.52$2,711
Jul 2013280102.523.72$2,871
Jun 201324094.403.93$2,266
May 201329094.834.15$2,750
Apr 201326093.964.28$2,443
Mar 201328093.623.91$2,621
Feb 201326091.233.42$2,372
Jan 201325091.603.42$2,290
Dec 201224086.773.42$2,082
Nov 201227086.953.62$2,348
Oct 201227089.383.40$2,413
Sep 201229094.672.92$2,745
Aug 201224092.662.91$2,224
Jul 201221085.133.02$1,788
Jun 201222079.822.52$1,756
May 201229091.612.49$2,657
Apr 2012260101.652.00$2,643
Mar 2012230105.052.22$2,416
Feb 2012260101.102.57$2,629
Jan 201218098.092.73$1,766
Dec 201124096.873.24$2,325
Nov 201121095.723.31$2,010
Oct 201124084.983.65$2,040
Sep 201125083.623.99$2,091
Aug 201123083.404.15$1,918
Jul 201123094.144.52$2,165
Jun 201124092.904.64$2,230
May 201123098.134.40$2,257
Apr 2011270105.964.33$2,861
Mar 201118096.364.06$1,734
Feb 201126085.644.18$2,227
Jan 201118086.504.59$1,557
Dec 201025085.734.35$2,143
Nov 201027080.843.80$2,183
Oct 201027078.103.51$2,109
Sep 201027072.633.98$1,961
Aug 201023073.684.42$1,695
Jul 201017072.554.74$1,233
Jun 201019070.364.91$1,337
May 201019071.124.24$1,351
Apr 201021081.694.12$1,715
Mar 201019078.394.39$1,489
Feb 201019073.585.44$1,398
Jan 201019074.365.96$1,413
Dec 200920071.445.48$1,429
Nov 200927074.593.75$2,014
Oct 200926072.544.11$1,886
Sep 200934065.543.06$2,228
Aug 200921067.423.22$1,416
Jul 200930061.133.46$1,834
Jun 200932066.163.90$2,117
May 200927054.743.93$1,478
Apr 200923046.773.59$1,076
Mar 200931042.144.06$1,306
Feb 200930032.814.63$984
Jan 200927035.865.37$968
Dec 200823037.105.98$853
Nov 200823055.496.86$1,276
Oct 200818075.246.92$1,354
Sep 2008190101.767.88$1,933
Aug 2008220114.228.48$2,513
Jul 2008250131.0811.39$3,277
Jun 2008170131.3313.03$2,233
May 2008240123.1711.57$2,956
Apr 2008210110.3110.45$2,317
Mar 2008180101.909.66$1,834
Feb 200826092.538.77$2,406
Jan 200820090.388.21$1,808
Dec 20070088.337.30$0
Nov 200715091.677.29$1,375
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 200716069.066.39$1,105
Jul 20070070.906.39$0
Jun 200717062.007.55$1,054
May 20070058.747.85$0
Apr 200729059.617.81$1,729
Mar 20070056.927.30$0
Feb 200723055.108.22$1,267
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 200610054.207.62$542
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 200617068.717.34$1,168
Jul 20060069.376.34$0
Jun 200627066.286.38$1,790
May 200616066.016.42$1,056
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 200614057.597.75$806
Jan 20060060.598.93$0
Dec 200517054.9413.42$934
Nov 20050054.6910.59$0
Oct 200520058.3413.80$1,167
Sep 20050061.4512.08$0
Aug 200518061.519.80$1,107
Jul 200516055.697.84$891
Jun 200519052.337.38$994
May 200518045.226.65$814
Apr 200523049.207.36$1,132
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 200412045.286.33$543
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 200411042.375.55$466
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 200411034.475.86$379
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 200413032.036.30$416
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 200313028.174.76$366
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 200312029.415.17$353
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 200313026.675.41$347
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 200313030.315.58$394
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 200211026.464.23$291
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 200212024.583.06$295
Jun 20020023.733.34$0
May 200215024.663.58$370
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 200213017.172.38$223
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 200113019.782.53$257
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 200116023.933.20$383
Jun 200111024.563.82$270
May 200114025.524.31$357
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 200115027.755.77$416
Jan 20010027.478.40$0
Dec 200013026.889.12$349
Nov 20000032.215.66$0
Oct 200012031.235.15$375
Sep 200011031.875.19$351
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 200011029.304.40$322
May 20000027.263.68$0
Apr 200013024.513.12$319
Mar 20000028.422.86$0
Feb 200013027.622.73$359
Jan 20000025.272.48$0
Dec 199913024.282.42$316
Nov 199913023.192.43$301
Oct 19990020.982.80$0
Sep 199910021.752.62$218
Aug 19990019.262.88$0
Jul 199915017.892.37$268
Jun 19990015.942.36$0
May 199914015.792.32$221
Apr 199912015.102.21$181
Mar 19990012.471.84$0
Feb 19991109.981.82$110
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 199814012.592.08$176
Aug 199812011.301.91$136
Jul 19980011.742.24$0
Jun 199812011.242.24$135
May 19980012.622.21$0
Apr 199811013.042.51$143
Mar 199814012.802.31$179
Feb 19980013.952.30$0
Jan 199814014.702.15$206
Dec 19970016.322.41$0
Nov 199713018.193.09$236
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 199711017.862.55$196
Jul 19970017.582.25$0
Jun 199712017.242.26$207
May 19970018.972.31$0
Apr 199715017.882.08$268
Mar 19970018.951.94$0
Feb 199714020.492.21$287
Jan 19970023.483.54$0
Dec 199616023.32$373
Nov 19960021.97$0
Oct 199614023.31$326
Sep 19960022.22$0
Aug 199615020.26$304
Jul 19960019.55$0
Jun 199616018.73$300
May 19960019.43$0
Apr 19960021.51$0
Mar 19969019.38$174
Feb 19960016.98$0
Jan 199611017.07$188
Dec 19950017.19$0
Nov 199515016.00$240
Oct 19950015.43$0
Sep 19950016.18$0
Aug 199514015.92$223
Jul 19950015.24$0
Jun 199525016.41$410
May 19950017.56$0
Apr 199515017.73$266
Mar 19950116.44$0
Feb 199512116.58$199
Jan 199517115.92$271
Dec 19940115.03$0
Nov 199417115.90$270
Oct 199428115.58$436
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940017.09$0
May 19940015.88$0
Apr 19940014.14$0
Mar 19940012.46$0
Feb 19940012.50$0
Jan 19940012.66$0
Dec 19930012.33$0
Nov 19930014.49$0
Oct 19930015.85$0
Sep 19930015.03$0
Aug 19930015.66$0
Jul 19930015.46$0
Jun 19930016.79$0
May 19930017.68$0
Apr 19930018.05$0
Mar 19930018.14$0
Feb 19930017.90$0
Jan 19930016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2025 — as filed, then multipliedworked
Oil                   66 bbl  × $ 56.66 =     $3,740
Casinghead gas         0 Mcf  × $  4.41 =         $0

────────────────────────────────────────────────────
Month total                                   $3,740

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/O/286 is the state's own key, not one this site invented.