RUSHING, G. W. "B"

Operated by CHANZE OIL CO., INC. (P-5 144419) in the VAN (SHALLOW) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 2910District 05Field 93042498OilCasinghead gasSaveExport
Value, all time
$3.9 M
Jan 1993 – May 2026
Value, last 12 filed months
$148 k
at the published price for each month
Months reported
401
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 50 leases and 231 wells, and the rule below applies to all of them.

Discovered
1932-12-31
as the register files it
Field class
Oil and gas
the register's own label
Between wells
300 ft
minimum
From a lease line
150 ft
minimum

A drilling unit in this field needs at least 2 acres. The field rule took effect on 1984-07-01.

The Commission's schedule remark for this field reads: FIELD RULES EFFECTIVE 5-7-84 PER DOCKET #5-82104.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition88,935 bbl$3,850,819
Casinghead gasProduction21 Mcf$0
Total$3,850,819

21 Mcf of this lease's gas, across 21 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (8)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5531, -95.6614. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.5 miles.

32.55132, -95.66140 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 8 wells
With a plug date
0.0%
0 of 8 wells
Median depth
1,375 ft
8 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
8100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Total depth in feet, 8 of 8 wells. Median 1,375 ft, with the middle half between 1,359 and 1,390 ft; the shallowest is 1,350 ft and the deepest 1,425 ft. The median is published rather than the mean, because a single mis-keyed depth moves a mean and cannot move a median.

When they were last completed

Last completion by decade, 8 of 8 wells, Dec 1985 – Jul 1992. This is the LAST completion filed on each wellbore, not the first — a well recompleted in 2019 counts once, in the 2010s.

Completions filed
Dec 1985 – Jul 1992
8 of 8 wells

8 wells

42-4673086991,354 ftJul 1992
42-4673086881,361 ftJul 1992
42-4673084171,387 ftOct 1991
42-4673081561,370 ftDec 1990
42-4673075851,350 ftOct 1989
42-4673072141,380 ftDec 1988
42-4673069631,425 ftJun 1988
42-4673061021,400 ftDec 1985

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (401)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

401 months

May 202600106.413.05$0
Apr 2026316098.932.87$31,262
Mar 2026158089.753.15$14,181
Feb 20260063.503.75$0
Jan 2026192059.138.00$11,353
Dec 2025340056.664.41$19,264
Nov 2025159058.593.93$9,316
Oct 2025165059.383.30$9,798
Sep 2025288062.743.08$18,069
Aug 2025195063.933.01$12,466
Jul 2025168066.743.32$11,212
Jun 2025169066.483.13$11,235
May 2025156060.553.23$9,446
Apr 2025287062.363.54$17,897
Mar 2025156067.704.27$10,561
Feb 2025165070.884.34$11,695
Jan 2025164074.324.28$12,188
Dec 2024194068.993.12$13,384
Nov 2024182069.052.20$12,567
Oct 2024152071.372.28$10,848
Sep 2024154069.612.36$10,720
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 2024103078.812.20$8,117
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 202466076.091.78$5,022
Jan 20240073.023.30$0
Dec 2023118071.262.61$8,409
Nov 2023118077.892.81$9,191
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 2023159080.522.67$12,803
Jul 20230074.852.64$0
Jun 2023294068.962.26$20,274
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 2022158085.005.65$13,430
Oct 2022162087.185.86$14,123
Sep 20220084.888.16$0
Aug 2022164094.529.13$15,501
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 20221580104.226.84$16,467
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 2020164038.772.71$6,358
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 2020144038.371.83$5,525
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 2020141057.252.09$8,072
Dec 20190059.012.30$0
Nov 2019146055.302.75$8,074
Oct 2019162053.472.42$8,662
Sep 20190055.052.66$0
Aug 2019150053.112.30$7,967
Jul 20190056.272.46$0
Jun 2019151052.782.49$7,970
May 2019161058.482.74$9,415
Apr 20190062.632.75$0
Mar 2019174056.803.06$9,883
Feb 2019158050.852.79$8,034
Jan 20190046.033.23$0
Dec 2018166046.594.19$7,734
Nov 2018155052.934.24$8,204
Oct 20180061.443.40$0
Sep 2018173059.543.11$10,300
Aug 2018175059.403.07$10,395
Jul 2018178065.142.93$11,595
Jun 20180060.183.08$0
May 2018167065.382.90$10,918
Apr 20180063.842.90$0
Mar 2018153061.222.79$9,367
Feb 20180061.782.77$0
Jan 2018162062.874.01$10,185
Dec 20170057.272.92$0
Nov 2017162055.423.12$8,978
Oct 20170049.292.98$0
Sep 2017161047.523.09$7,651
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 2017156042.493.09$6,628
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 2017165046.772.98$7,717
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 2016163046.193.09$7,529
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 2016141036.561.99$5,155
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 2015138038.792.17$5,353
Oct 2015149043.552.43$6,489
Sep 20150042.992.76$0
Aug 2015147040.162.87$5,904
Jul 2015160048.152.95$7,704
Jun 20150056.152.88$0
May 2015185055.212.96$10,214
Apr 2015159049.822.71$7,921
Mar 2015155042.892.93$6,648
Feb 20150044.662.98$0
Jan 2015138043.433.10$5,993
Dec 2014133054.693.59$7,274
Nov 2014167070.464.25$11,767
Oct 2014148078.303.90$11,588
Sep 2014161086.164.05$13,872
Aug 2014160089.394.04$14,302
Jul 2014162096.564.18$15,643
Jun 2014156098.164.74$15,313
May 2014163094.734.73$15,441
Apr 2014161095.944.81$15,446
Mar 2014322095.895.06$30,877
Feb 2014156097.406.19$15,194
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 2013160088.853.74$14,216
Oct 2013344097.423.78$33,512
Sep 201300104.113.72$0
Aug 20133350104.253.52$34,924
Jul 20131780102.523.72$18,249
Jun 2013182094.403.93$17,181
May 2013148094.834.15$14,035
Apr 20130093.964.28$0
Mar 2013170093.623.91$15,915
Feb 2013152091.233.42$13,867
Jan 2013159091.603.42$14,564
Dec 2012143086.773.42$12,408
Nov 2012176086.953.62$15,303
Oct 2012327089.383.40$29,227
Sep 2012176094.672.92$16,662
Aug 2012343092.662.91$31,782
Jul 2012175085.133.02$14,898
Jun 2012351079.822.52$28,017
May 2012324091.612.49$29,682
Apr 20123220101.652.00$32,731
Mar 20121640105.052.22$17,228
Feb 20121580101.102.57$15,974
Jan 2012315098.092.73$30,898
Dec 2011328096.873.24$31,773
Nov 2011164095.723.31$15,698
Oct 2011190084.983.65$16,146
Sep 2011177083.623.99$14,801
Aug 2011159083.404.15$13,261
Jul 2011353094.144.52$33,231
Jun 2011342092.904.64$31,772
May 2011179098.134.40$17,565
Apr 20111790105.964.33$18,967
Mar 2011160096.364.06$15,418
Feb 2011160085.644.18$13,702
Jan 2011357086.504.59$30,881
Dec 20100085.734.35$0
Nov 2010198080.843.80$16,006
Oct 2010326078.103.51$25,461
Sep 2010341072.633.98$24,767
Aug 2010191073.684.42$14,073
Jul 2010374072.554.74$27,134
Jun 2010377070.364.91$26,526
May 2010383071.124.24$27,239
Apr 20100081.694.12$0
Mar 2010397078.394.39$31,121
Feb 2010196073.585.44$14,422
Jan 2010379074.365.96$28,182
Dec 2009363071.445.48$25,933
Nov 2009200074.593.75$14,918
Oct 2009182072.544.11$13,202
Sep 2009386065.543.06$25,298
Aug 2009375067.423.22$25,283
Jul 2009177061.133.46$10,820
Jun 2009386066.163.90$25,538
May 2009378054.743.93$20,692
Apr 2009169046.773.59$7,904
Mar 2009395042.144.06$16,645
Feb 2009173032.814.63$5,676
Jan 2009179035.865.37$6,419
Dec 2008377037.105.98$13,987
Nov 2008176055.496.86$9,766
Oct 2008184075.246.92$13,844
Sep 20081950101.767.88$19,843
Aug 20081760114.228.48$20,103
Jul 20083730131.0811.39$48,893
Jun 20083590131.3313.03$47,147
May 20081810123.1711.57$22,294
Apr 20083640110.3110.45$40,153
Mar 20081860101.909.66$18,953
Feb 2008358092.538.77$33,126
Jan 2008354090.388.21$31,995
Dec 2007182088.337.30$16,076
Nov 2007354091.677.29$32,451
Oct 2007176082.856.92$14,582
Sep 2007365075.846.24$27,682
Aug 2007344069.066.39$23,757
Jul 2007180070.906.39$12,762
Jun 2007356062.007.55$22,072
May 2007361058.747.85$21,205
Apr 2007351059.617.81$20,923
Mar 2007180056.927.30$10,246
Feb 2007178055.108.22$9,808
Jan 2007362050.306.73$18,209
Dec 2006365056.656.92$20,677
Nov 2006186054.207.62$10,081
Oct 2006181054.906.01$9,937
Sep 2006359060.085.04$21,569
Aug 2006175068.717.34$12,024
Jul 2006357069.376.34$24,765
Jun 2006179066.286.38$11,864
May 2006356066.016.42$23,500
Apr 2006179064.397.36$11,526
Mar 2006359056.707.08$20,355
Feb 2006184057.597.75$10,597
Jan 2006185060.598.93$11,209
Dec 2005535054.9413.42$29,393
Nov 20050054.6910.59$0
Oct 2005362058.3413.80$21,119
Sep 2005180061.4512.08$11,061
Aug 2005359061.519.80$22,082
Jul 2005195055.697.84$10,860
Jun 2005358052.337.38$18,734
May 2005179045.226.65$8,094
Apr 2005180049.207.36$8,856
Mar 2005356050.377.15$17,932
Feb 2005178045.226.31$8,049
Jan 2005359043.166.32$15,494
Dec 2004181039.866.75$7,215
Nov 2004181045.286.33$8,196
Oct 2004181049.706.52$8,996
Sep 2004357043.245.28$15,437
Aug 2004178042.375.55$7,542
Jul 2004349038.286.08$13,360
Jun 2004179036.106.43$6,462
May 2004354037.486.49$13,268
Apr 2004180034.475.86$6,205
Mar 2004359034.365.53$12,335
Feb 2004179032.455.51$5,809
Jan 2004361032.036.30$11,563
Dec 2003363030.266.30$10,984
Nov 20030028.804.60$0
Oct 2003359028.174.76$10,113
Sep 2003179026.314.75$4,709
Aug 2003179029.765.13$5,327
Jul 2003180029.415.17$5,294
Jun 2003179028.565.98$5,112
May 2003180026.595.97$4,786
Apr 2003359026.675.41$9,575
Mar 2003183031.146.10$5,699
Feb 2003183033.487.93$6,127
Jan 2003178030.315.58$5,395
Dec 2002182026.914.85$4,898
Nov 2002182024.664.14$4,488
Oct 2002181026.464.23$4,789
Sep 20020027.443.64$0
Aug 2002178025.963.16$4,621
Jul 2002179024.583.06$4,400
Jun 2002179023.733.34$4,248
May 2002541024.663.58$13,341
Apr 2002347023.653.51$8,207
Mar 2002362022.003.10$7,964
Feb 2002362018.222.38$6,596
Jan 2002180017.172.38$3,091
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 2001357019.782.53$7,061
Sep 2001179024.262.25$4,343
Aug 2001179024.873.05$4,452
Jul 2001182023.933.20$4,355
Jun 2001179024.563.82$4,396
May 2001180025.524.31$4,594
Apr 2001180024.685.34$4,442
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 2000180032.215.66$5,798
Oct 2000181031.235.15$5,653
Sep 2000359031.875.19$11,441
Aug 2000354029.644.54$10,493
Jul 2000355028.534.09$10,128
Jun 2000359029.304.40$10,519
May 2000180027.263.68$4,907
Apr 2000354024.513.12$8,677
Mar 2000542028.422.86$15,404
Feb 2000362027.622.73$9,998
Jan 2000537025.272.48$13,570
Dec 1999360024.282.42$8,741
Nov 1999182023.192.43$4,221
Oct 1999366020.982.80$7,679
Sep 1999181021.752.62$3,937
Aug 1999359019.262.88$6,914
Jul 1999181017.892.37$3,238
Jun 1999177015.942.36$2,821
May 1999182015.792.32$2,874
Apr 1999363015.102.21$5,481
Mar 1999356012.471.84$4,439
Feb 199936409.981.82$3,633
Jan 1999364010.381.90$3,778
Dec 199836309.201.77$3,340
Nov 1998178010.892.19$1,938
Oct 1998357012.421.97$4,434
Sep 1998359012.592.08$4,520
Aug 1998362011.301.91$4,091
Jul 1998357011.742.24$4,191
Jun 19980011.242.24$0
May 1998357012.622.21$4,505
Apr 1998356013.042.51$4,642
Mar 1998362012.802.31$4,634
Feb 1998364013.952.30$5,078
Jan 1998365014.702.15$5,366
Dec 1997540016.322.41$8,813
Nov 19970018.193.09$0
Oct 1997372019.253.15$7,161
Sep 1997510017.742.95$9,047
Aug 1997372017.862.55$6,644
Jul 1997541017.582.25$9,511
Jun 1997367017.242.26$6,327
May 1997533018.972.31$10,111
Apr 1997549017.882.08$9,816
Mar 1997363018.951.94$6,879
Feb 1997369020.492.21$7,561
Jan 1997380023.483.54$8,922
Dec 1996934023.32$21,781
Nov 19960021.97$0
Oct 1996364023.31$8,485
Sep 1996553022.22$12,288
Aug 1996375020.26$7,598
Jul 1996550019.55$10,753
Jun 1996359018.73$6,724
May 1996368019.43$7,150
Apr 1996528021.51$11,357
Mar 1996538019.38$10,426
Feb 1996523016.98$8,881
Jan 1996547017.07$9,337
Dec 1995530017.19$9,111
Nov 1995473016.00$7,568
Oct 1995547015.43$8,440
Sep 1995547016.18$8,850
Aug 1995543015.92$8,645
Jul 1995533015.24$8,123
Jun 1995537016.41$8,812
May 1995549017.56$9,640
Apr 1995536017.73$9,503
Mar 1995360016.44$5,918
Feb 1995358016.58$5,936
Jan 1995365015.92$5,811
Dec 1994353015.03$5,306
Nov 1994361015.90$5,740
Oct 1994534015.58$8,320
Sep 1994535115.29$8,180
Aug 1994352116.13$5,678
Jul 1994545117.56$9,570
Jun 1994529117.09$9,041
May 1994534115.88$8,480
Apr 1994542114.14$7,664
Mar 1994545112.46$6,791
Feb 1994359112.50$4,488
Jan 1994547112.66$6,925
Dec 1993533112.33$6,572
Nov 1993551114.49$7,984
Oct 1993549115.85$8,702
Sep 1993545115.03$8,191
Aug 1993538115.66$8,425
Jul 1993545115.46$8,426
Jun 1993539116.79$9,050
May 1993687117.68$12,146
Apr 1993552118.05$9,964
Mar 1993536118.14$9,723
Feb 1993553117.90$9,899
Jan 1993549116.93$9,295

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2026 — as filed, then multipliedworked
Oil                  316 bbl  × $ 98.93 =    $31,262
Casinghead gas         0 Mcf  × $  2.87 =         $0

────────────────────────────────────────────────────
Month total                                  $31,262

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/O/2910 is the state's own key, not one this site invented.