ROWFU (CADENHEAD "A")

Operated by XTO ENERGY INC. (P-5 945936) in the RED OAK (DEXTER) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 3806District 05Field 75363080OilCasinghead gasSaveExport
Value, all time
$16.4 M
Apr 2005 – Aug 2012
Value, last 12 filed months
$0
at the published price for each month
Months reported
89
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 55 leases and 95 wells, and the rule below applies to all of them.

Discovered
2003-07-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-04-18.

The Commission's schedule remark for this field reads: DKT. ALSO CANCELS GAS WELL OVERAGE EFF. SAME DATE.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition210,441 bbl$13,686,973
Casinghead gasProduction357,794 Mcf$2,695,804
Total$16,382,778

Wells on this lease (2)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.4799, -96.0288. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.2 miles.

31.47989, -96.02877 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 2 wells
With a plug date
0.0%
0 of 2 wells
Median depth
6,750 ft
2 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
2100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

Between 6,750 and 6,750 ft, median 6,750 ft, over the 2 wells that filed a depth.

Completions filed
Jun 2005 – Aug 2011
2 of 2 wells

2 wells

42-2893146416,750 ftAug 2011
42-2893148126,750 ftJun 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (89)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

89 months

Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20118731,50283.404.15$79,040
Jul 20118831,10394.144.52$88,108
Jun 20117031,23392.904.64$71,030
May 20117171,30798.134.40$76,116
Apr 20117271,242105.964.33$82,415
Mar 20117171,35196.364.06$74,572
Feb 20117111,22785.644.18$66,019
Jan 20116981,40586.504.59$66,824
Dec 20107341,32385.734.35$68,678
Nov 20107321,52080.843.80$64,944
Oct 20107081,64778.103.51$61,074
Sep 20109071,60672.633.98$72,266
Aug 20107211,72173.684.42$60,729
Jul 20108901,65472.554.74$72,404
Jun 20107121,61970.364.91$58,046
May 20109111,58171.124.24$71,486
Apr 20107201,54381.694.12$65,178
Mar 20108871,42678.394.39$75,790
Feb 20109171,31473.585.44$74,624
Jan 20101,0841,55974.365.96$89,904
Dec 20099081,56871.445.48$73,466
Nov 20091,0831,50774.593.75$86,434
Oct 20091,1021,48572.544.11$86,043
Sep 20091,0651,43165.543.06$74,186
Aug 20091,1111,64767.423.22$80,204
Jul 20091,2631,66261.133.46$82,965
Jun 20091,2141,61666.163.90$86,613
May 20091,0921,47154.743.93$65,551
Apr 20091,2181,62146.773.59$62,781
Mar 20091,2491,74442.144.06$59,712
Feb 20099201,50432.814.63$37,153
Jan 20091,1341,74535.865.37$50,038
Dec 20081,5041,83537.105.98$66,766
Nov 20081,1111,51255.496.86$72,022
Oct 20081,2941,63175.246.92$108,650
Sep 20081,3511,274101.767.88$147,513
Aug 20081,3712,298114.228.48$176,090
Jul 20081,6302,777131.0811.39$245,289
Jun 20081,5672,832131.3313.03$242,703
May 20081,6933,012123.1711.57$243,389
Apr 20081,5733,108110.3110.45$206,011
Mar 20082,0273,224101.909.66$237,708
Feb 20081,7243,23992.538.77$187,930
Jan 20081,8223,56590.388.21$193,926
Dec 20071,8504,37288.337.30$195,335
Nov 20072,1634,01891.677.29$227,580
Oct 20071,7334,85782.856.92$177,199
Sep 20072,2785,10375.846.24$204,627
Aug 20072,0535,40869.066.39$176,326
Jul 20072,5425,02270.906.39$212,308
Jun 20072,3075,58862.007.55$185,215
May 20072,2344,88058.747.85$169,515
Apr 20071,5464,09259.617.81$124,096
Mar 20071,2322,80556.927.30$90,607
Feb 20071,3773,37255.108.22$103,577
Jan 20072,3497,38550.306.73$167,832
Dec 20062,4989,00956.656.92$203,840
Nov 20063,13410,50554.207.62$249,884
Oct 20062,97010,57554.906.01$226,649
Sep 20063,23211,47160.085.04$251,960
Aug 20064,15814,55168.717.34$392,499
Jul 20065,00616,56769.376.34$452,347
Jun 20065,34915,65866.286.38$454,491
May 20066,14316,68766.016.42$512,713
Apr 20066,65517,66664.397.36$558,546
Mar 20067,11020,06656.707.08$545,263
Feb 20066,91717,00757.597.75$530,173
Jan 20068,42218,76960.598.93$677,958
Dec 20059,16917,69654.9413.42$741,144
Nov 20059,09917,71454.6910.59$685,187
Oct 200510,5828,76058.3413.80$738,205
Sep 200510,318061.4512.08$634,041
Aug 200510,415061.519.80$640,627
Jul 200511,675055.697.84$650,181
Jun 20058,656052.337.38$452,968
May 20055,333045.226.65$241,158
Apr 20051,958049.207.36$96,334

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2011 — as filed, then multipliedworked
Oil                  873 bbl  × $ 83.40 =    $72,808
Casinghead gas     1,502 Mcf  × $  4.15 =     $6,232

────────────────────────────────────────────────────
Month total                                  $79,040

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/O/3806 is the state's own key, not one this site invented.