HARRIMAN B

Operated by WILDFIRE ENERGY OPERATING LLC (P-5 923444) in the AGUILA VADO (EAGLEFORD) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Oil lease lease 4430District 05Field 00870500OilCasinghead gasSaveExport
Value, all time
$15.8 M
Feb 2020 – May 2026
Value, last 12 filed months
$1.8 M
at the published price for each month
Months reported
76
no gaps in the span
Streams
2
oil, casinghead gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 199 leases and 351 wells, and the rule below applies to all of them.

Discovered
2009-12-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 2019-01-07.

The Commission's schedule remark for this field reads: 1/7/19 FIELD CHANGED TO 49B PER ENGINEERING DEPARTMENT.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
OilDisposition190,195 bbl$15,484,706
Casinghead gasProduction71,311 Mcf$282,317
Total$15,767,022

Every month this lease reported (76)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

76 months

May 20262,147526106.413.05$230,064
Apr 20262,27746598.932.87$226,598
Mar 20262,36345789.753.15$213,519
Feb 20261,70340363.503.75$109,652
Jan 20262,16338759.138.00$130,993
Dec 20251,41245256.664.41$81,999
Nov 20252,06891158.593.93$124,741
Oct 20251,98578259.383.30$120,454
Sep 20252,08685962.743.08$133,519
Aug 20252,34082163.933.01$152,071
Jul 20252,29983666.743.32$156,207
Jun 20252,15576366.483.13$145,652
May 20252,13369760.553.23$131,406
Apr 20252,51469762.363.54$159,243
Mar 20252,34871267.704.27$161,999
Feb 20252,17065470.884.34$156,649
Jan 20252,5001,50274.324.28$192,227
Dec 20242,5201,52068.993.12$178,599
Nov 20242,3501,45969.052.20$165,475
Oct 20242,6501,40471.372.28$192,334
Sep 20242,5061,28669.612.36$177,483
Aug 20242,8521,39575.632.06$218,576
Jul 20242,4931,39779.932.15$202,264
Jun 20242,4811,35178.082.63$197,275
May 20242,6181,14978.812.20$208,851
Apr 20242,9051,01684.451.66$247,013
Mar 20242,88397980.301.55$233,018
Feb 20242,7201,24576.091.78$209,185
Jan 20243,10474473.023.30$229,108
Dec 20232,8761,74171.262.61$209,489
Nov 20233,0601,69477.892.81$243,099
Oct 20233,2201,87885.443.09$280,915
Sep 20233,0261,62689.042.74$273,882
Aug 20233,2161,63580.522.67$263,322
Jul 20233,4021,85174.852.64$259,530
Jun 20233,2331,97668.962.26$227,410
May 20233,4252,11470.622.23$246,582
Apr 20233,4231,54578.122.24$270,862
Mar 20233,9961,65472.852.39$295,067
Feb 20233,0791,42475.112.47$234,775
Jan 20234,1161,99576.533.39$321,756
Dec 20223,9741,77076.415.73$313,794
Nov 20224,1091,42285.005.65$357,294
Oct 20224,4321,41887.185.86$394,697
Sep 20224,2721,37184.888.16$373,800
Aug 20225,1422,20894.529.13$506,175
Jul 20224,6541,812101.587.54$486,420
Jun 20225,5592,060115.097.98$656,218
May 20224,9671,327109.378.43$554,431
Apr 20225,576885104.226.84$587,182
Mar 20226,8761,067108.885.08$754,075
Feb 20226,4971,27991.054.86$597,766
Jan 20228,5121,92081.844.54$705,334
Dec 20219,3511,72971.323.90$673,655
Nov 20217,4573,04177.435.24$593,321
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Oil                2,147 bbl  × $106.41 =   $228,462
Casinghead gas       526 Mcf  × $  3.05 =     $1,602

────────────────────────────────────────────────────
Month total                                 $230,064

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 05/O/4430 is the state's own key, not one this site invented.