DEVAULT, C. S. GU 1

Operated by SAMSON LONE STAR, LLC (P-5 744737) in the DOUGLASS, W. (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 105313District 06Field 25864471NGPA filingCondensateGasSaveExport
Value, all time
$575 k
Jan 1993 – Oct 2009
Value, last 12 filed months
$0
at the published price for each month
Months reported
202
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 423 leases and 423 wells, and the rule below applies to all of them.

Discovered
1973-06-01
as the register files it
Field class
Gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: AND NACOGDOCHES, E. (JAMES LIME).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition186 bbl$4,810
GasProduction252,343 Mcf$569,930
Total$574,741

99,162 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6399, -94.8160. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.63987, -94.81598 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,678 ft
1 wells filed one
Completion to plug
27.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,678 ft.

Completions filed
Aug 1982
1 of 1 wells
Plug dates filed
Oct 2009
1 of 1 wells

Last completion to plug: a median of 27.2 years across the 1 well that filed both dates, with the middle half between 27.2 years and 27.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-34730727110,678 ftAug 1982Oct 2009Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (202)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

202 months

Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050254.6910.59$21
Oct 20050358.3413.80$41
Sep 200503561.4512.08$423
Aug 20050061.519.80$0
Jul 20050155.697.84$8
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20051049.207.36$49
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 200401,87343.245.28$9,897
Aug 200403,35642.375.55$18,628
Jul 2004103,30638.286.08$20,497
Jun 200402,19336.106.43$14,108
May 200401,53337.486.49$9,956
Apr 200402,83534.475.86$16,609
Mar 200403,38434.365.53$18,714
Feb 200403,21432.455.51$17,708
Jan 20047179832.036.30$7,301
Dec 200301,32130.266.30$8,324
Nov 200304,58528.804.60$21,069
Oct 2003403,56428.174.76$18,090
Sep 2003035826.314.75$1,700
Aug 2003046629.765.13$2,390
Jul 2003045129.415.17$2,332
Jun 2003038128.565.98$2,280
May 2003088826.595.97$5,304
Apr 2003057326.675.41$3,098
Mar 2003094131.146.10$5,736
Feb 2003057933.487.93$4,589
Jan 2003064930.315.58$3,623
Dec 2002097026.914.85$4,708
Nov 2002049724.664.14$2,056
Oct 2002079126.464.23$3,345
Sep 2002079127.443.64$2,875
Aug 2002092225.963.16$2,917
Jul 2002037224.583.06$1,139
Jun 2002074723.733.34$2,494
May 2002053424.663.58$1,914
Apr 2002065123.653.51$2,287
Mar 200202,58922.003.10$8,033
Feb 200201,81618.222.38$4,314
Jan 200201,90617.172.38$4,528
Dec 2001084616.932.36$2,000
Nov 200101,18018.072.41$2,839
Oct 200101,57719.782.53$3,988
Sep 2001077024.262.25$1,734
Aug 2001079524.873.05$2,427
Jul 2001054723.933.20$1,749
Jun 2001077224.563.82$2,952
May 200101,17625.524.31$5,065
Apr 200101,25324.685.34$6,685
Mar 200101,51024.545.38$8,118
Feb 200101,23927.755.77$7,145
Jan 200101,10127.478.40$9,247
Dec 200001,94826.889.12$17,771
Nov 200001,03832.215.66$5,873
Oct 200001,36631.235.15$7,029
Sep 200003,03831.875.19$15,757
Aug 200003,68729.644.54$16,742
Jul 200003,66428.534.09$14,985
Jun 200001,61729.304.40$7,110
May 200001,45527.263.68$5,354
Apr 200001,40824.513.12$4,387
Mar 200001,66928.422.86$4,773
Feb 200001,82927.622.73$4,987
Jan 200001,91625.272.48$4,753
Dec 199901,81924.282.42$4,409
Nov 1999101,77323.192.43$4,547
Oct 199901,74920.982.80$4,904
Sep 199901,52821.752.62$4,002
Aug 199902,18219.262.88$6,275
Jul 199904,39517.892.37$10,427
Jun 199901,93415.942.36$4,568
May 199901,71615.792.32$3,983
Apr 1999201,73015.102.21$4,122
Mar 199901,39412.471.84$2,563
Feb 199901,4539.981.82$2,641
Jan 199901,52910.381.90$2,905
Dec 199801,6439.201.77$2,914
Nov 199801,64310.892.19$3,591
Oct 199801,59512.421.97$3,141
Sep 199802,15212.592.08$4,482
Aug 199802,28311.301.91$4,354
Jul 199801,10711.742.24$2,477
Jun 199801,20611.242.24$2,698
May 199801,33612.622.21$2,948
Apr 1998341,74613.042.51$4,818
Mar 199801,96112.802.31$4,529
Feb 199801,48113.952.30$3,405
Jan 199803,55814.702.15$7,667
Dec 199701,53816.322.41$3,708
Nov 199702,07418.193.09$6,405
Oct 199703,72919.253.15$11,746
Sep 199701,38217.742.95$4,084
Aug 199701,74017.862.55$4,445
Jul 199702,91817.582.25$6,557
Jun 199701,35817.242.26$3,065
May 199701,71818.972.31$3,966
Apr 1997020317.882.08$423
Mar 199701,38718.951.94$2,690
Feb 199701,28620.492.21$2,837
Jan 199701,65923.483.54$5,872
Dec 199602,15823.32$0
Nov 199601,87021.97$0
Oct 199601,50423.31$0
Sep 199601,42922.22$0
Aug 199603,50320.26$0
Jul 199601,25119.55$0
Jun 199601,06718.73$0
May 199601,52219.43$0
Apr 199601,47721.51$0
Mar 199602,43119.38$0
Feb 199603,54616.98$0
Jan 199601,41817.07$0
Dec 199501,52617.19$0
Nov 199502,20816.00$0
Oct 199502,57615.43$0
Sep 199501,81316.18$0
Aug 199502,90815.92$0
Jul 199501,29815.24$0
Jun 199502,47716.41$0
May 199502,48517.56$0
Apr 199501,43117.73$0
Mar 199501,47316.44$0
Feb 199502,51816.58$0
Jan 199501,99515.92$0
Dec 199402,61915.03$0
Nov 199402,95915.90$0
Oct 199401,14415.58$0
Sep 199402,81515.29$0
Aug 199401,17516.13$0
Jul 199402,51017.56$0
Jun 199402,44117.09$0
May 199402,77915.88$0
Apr 199403,19714.14$0
Mar 199402,97712.46$0
Feb 199403,67112.50$0
Jan 199402,34912.66$0
Dec 199302,34412.33$0
Nov 199301,32614.49$0
Oct 199301,79415.85$0
Sep 199302,58515.03$0
Aug 199303,79115.66$0
Jul 1993084615.46$0
Jun 199301,12916.79$0
May 199301,41017.68$0
Apr 199301,46518.05$0
Mar 199301,24318.14$0
Feb 199301,20917.90$0
Jan 199301,50016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2005 — as filed, then multipliedworked
Condensate             0 bbl  × $ 54.69 =         $0
Gas                    2 Mcf  × $ 10.59 =        $21

────────────────────────────────────────────────────
Month total                                      $21

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/105313 is the state's own key, not one this site invented.