JASPAR GAS UNIT

Operated by DUAL PRODUCTION PARTNERS, LLC (P-5 229385) in the NACONICHE CREEK (ROD.-TP CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 116044District 06Field 64300287NGPA filingCondensateGasSaveExport
Value, all time
$1.7 M
Jan 1993 – Sep 2019
Value, last 12 filed months
$14
at the published price for each month
Months reported
321
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 373 leases and 373 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-09-27.

The Commission's schedule remark for this field reads: BY HEARING.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,616 bbl$56,628
GasProduction301,027 Mcf$1,648,994
Total$1,705,622

23,508 Mcf of this lease's gas, across 38 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7744, -94.6147. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.77444, -94.61469 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,300 ft.

Plug dates filed
Mar 2019
1 of 1 wells

1 well

42-34731324110,300 ftMar 2019Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (321)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

321 months

Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180152.934.24$4
Oct 20180361.443.40$10
Sep 201801559.543.11$47
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 2017011057.272.92$321
Nov 2017014055.423.12$437
Oct 2017011549.292.98$343
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 2017021443.873.09$661
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 200913611171.445.48$10,325
Nov 2009011574.593.75$431
Oct 20090072.544.11$0
Sep 2009012065.543.06$368
Aug 2009010267.423.22$328
Jul 2009016661.133.46$575
Jun 2009014266.163.90$553
May 2009017654.743.93$691
Apr 2009014646.773.59$524
Mar 2009029942.144.06$1,214
Feb 2009014932.814.63$690
Jan 2009013135.865.37$704
Dec 2008010937.105.98$652
Nov 2008018355.496.86$1,255
Oct 2008013075.246.92$900
Sep 20080207101.767.88$1,631
Aug 20080198114.228.48$1,680
Jul 20080297131.0811.39$3,383
Jun 20080260131.3313.03$3,388
May 20080269123.1711.57$3,113
Apr 20080293110.3110.45$3,063
Mar 20081641101.909.66$6,297
Feb 200801,29192.538.77$11,323
Jan 200801,46890.388.21$12,046
Dec 200701,51088.337.30$11,026
Nov 200701,51891.677.29$11,069
Oct 200711,61282.856.92$11,241
Sep 200711,52975.846.24$9,623
Aug 200701,63969.066.39$10,470
Jul 20071751,82070.906.39$24,034
Jun 200711,80962.007.55$13,717
May 200701,91458.747.85$15,018
Apr 200701,92059.617.81$14,986
Mar 200702,00556.927.30$14,640
Feb 200701,70355.108.22$13,992
Jan 200711,78250.306.73$12,038
Dec 200601,44556.656.92$9,997
Nov 200601,15454.207.62$8,791
Oct 200601,01754.906.01$6,116
Sep 200602,64260.085.04$13,308
Aug 200602,95768.717.34$21,704
Jul 200601,67069.376.34$10,592
Jun 200601,00866.286.38$6,435
May 200601,48366.016.42$9,528
Apr 200602,70064.397.36$19,873
Mar 200602,87356.707.08$20,349
Feb 200602,72657.597.75$21,130
Jan 200602,09360.598.93$18,697
Dec 200503,65554.9413.42$49,033
Nov 200503,08554.6910.59$32,665
Oct 200505,64058.3413.80$77,808
Sep 200503,09961.4512.08$37,433
Aug 200503,28461.519.80$32,173
Jul 200503,00355.697.84$23,554
Jun 200503,42652.337.38$25,287
May 200503,02145.226.65$20,093
Apr 200503,84649.207.36$28,308
Mar 200502,94550.377.15$21,071
Feb 200501,55845.226.31$9,834
Jan 200502,04943.166.32$12,954
Dec 20041646,00039.866.75$47,044
Nov 200403,86545.286.33$24,467
Oct 200402,37249.706.52$15,454
Sep 200402,67943.245.28$14,156
Aug 200403,26542.375.55$18,123
Jul 200403,17038.286.08$19,287
Jun 200403,41036.106.43$21,937
May 200402,47337.486.49$16,061
Apr 200402,37834.475.86$13,931
Mar 200402,06334.365.53$11,409
Feb 200401,84932.455.51$10,187
Jan 200401,43332.036.30$9,027
Dec 200301,26330.266.30$7,959
Nov 200301,27828.804.60$5,873
Oct 200301,41528.174.76$6,735
Sep 200301,41826.314.75$6,735
Aug 200301,66729.765.13$8,551
Jul 20031681,82229.415.17$14,362
Jun 200302,01228.565.98$12,038
May 200302,12126.595.97$12,668
Apr 200301,65726.675.41$8,960
Mar 200301,71631.146.10$10,461
Feb 200301,69033.487.93$13,395
Jan 200302,03630.315.58$11,365
Dec 200201,88926.914.85$9,169
Nov 200202,23124.664.14$9,230
Oct 200202,53726.464.23$10,729
Sep 200201,92627.443.64$7,001
Aug 200202,36625.963.16$7,486
Jul 200202,46524.583.06$7,547
Jun 20021682,44123.733.34$12,135
May 200202,53924.663.58$9,100
Apr 200202,87623.653.51$10,101
Mar 200203,13822.003.10$9,736
Feb 200203,00218.222.38$7,132
Jan 200203,66317.172.38$8,702
Dec 200103,73616.932.36$8,833
Nov 200103,52818.072.41$8,487
Oct 20011403,91119.782.53$12,660
Sep 200103,95424.262.25$8,902
Aug 200104,30524.873.05$13,144
Jul 200104,60023.933.20$14,707
Jun 200104,50024.563.82$17,209
May 20011844,94525.524.31$25,995
Apr 200105,27424.685.34$28,138
Mar 200105,31524.545.38$28,576
Feb 200105,01127.755.77$28,899
Jan 200106,00327.478.40$50,418
Dec 200005,98826.889.12$54,626
Nov 20001815,67532.215.66$37,939
Oct 200006,20931.235.15$31,948
Sep 200003,02831.875.19$15,705
Aug 200006,60029.644.54$29,969
Jul 2000010,76628.534.09$44,030
Jun 200003,74529.304.40$16,468
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 19970017.242.26$0
May 19970018.972.31$0
Apr 19970017.882.08$0
Mar 199718857318.951.94$4,674
Feb 199701,41220.492.21$3,115
Jan 199701,57523.483.54$5,575
Dec 199601,71123.32$0
Nov 199601,30921.97$0
Oct 199601,67623.31$0
Sep 199601,68122.22$0
Aug 199601,75020.26$0
Jul 199601,22519.55$0
Jun 199601,51018.73$0
May 199602,28319.43$0
Apr 199601,21421.51$0
Mar 199652,06419.38$97
Feb 199601,35016.98$0
Jan 199601,62617.07$0
Dec 1995022717.19$0
Nov 19950016.00$0
Oct 199501415.43$0
Sep 199501,09816.18$0
Aug 199501,35115.92$0
Jul 1995085815.24$0
Jun 199501816.41$0
May 199501117.56$0
Apr 19950617.73$0
Mar 19950016.44$0
Feb 19950016.58$0
Jan 19950015.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 1994016415.58$0
Sep 19940015.29$0
Aug 19940016.13$0
Jul 19940017.56$0
Jun 19940617.09$0
May 199401015.88$0
Apr 19940014.14$0
Mar 19940712.46$0
Feb 199401012.50$0
Jan 199401012.66$0
Dec 199301012.33$0
Nov 199302914.49$0
Oct 19930515.85$0
Sep 19930515.03$0
Aug 19930515.66$0
Jul 19930415.46$0
Jun 199310213516.79$1,713
May 199301417.68$0
Apr 199301718.05$0
Mar 199301918.14$0
Feb 19930817.90$0
Jan 199306816.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2018 — as filed, then multipliedworked
Condensate             0 bbl  × $ 52.93 =         $0
Gas                    1 Mcf  × $  4.24 =         $4

────────────────────────────────────────────────────
Month total                                       $4

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/116044 is the state's own key, not one this site invented.