CEDAR SPRINGS GAS UNIT #6

Operated by ENCANA OIL & GAS(USA) INC. (P-5 251691) in the CEDAR SPRINGS (COTTON VALLEY SD) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 123861District 06Field 16613150CondensateGasSaveExport
Value, all time
$94 k
Jan 1993 – Jan 2006
Value, last 12 filed months
$0
at the published price for each month
Months reported
157
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 10 wells, and the rule below applies to all of them.

Discovered
1978-01-02
as the register files it
Field class
Gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 320 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 09/01/96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,057 bbl$20,642
GasProduction51,310 Mcf$73,121
Total$93,762

32,194 Mcf of this lease's gas, across 46 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.8308, -94.7561. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.83081, -94.75610 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
11,700 ft
1 wells filed one
Completion to plug
10.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,700 ft.

Completions filed
Aug 2004
1 of 1 wells
Plug dates filed
Dec 2014
1 of 1 wells

Last completion to plug: a median of 10.3 years across the 1 well that filed both dates, with the middle half between 10.3 years and 10.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-45930082111,700 ftAug 2004Dec 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (157)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

157 months

Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 200557043.166.32$2,460
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 2002010827.443.64$393
Aug 2002062825.963.16$1,987
Jul 2002069924.583.06$2,140
Jun 2002055223.733.34$1,843
May 200217853724.663.58$6,314
Apr 2002043123.653.51$1,514
Mar 2002047322.003.10$1,468
Feb 2002041118.222.38$976
Jan 2002046017.172.38$1,093
Dec 2001041216.932.36$974
Nov 2001038618.072.41$929
Oct 2001042619.782.53$1,077
Sep 2001038724.262.25$871
Aug 2001046524.873.05$1,420
Jul 2001053923.933.20$1,723
Jun 2001058424.563.82$2,233
May 2001055725.524.31$2,399
Apr 2001042024.685.34$2,241
Mar 2001043124.545.38$2,317
Feb 2001031227.755.77$1,799
Jan 2001047227.478.40$3,964
Dec 2000048426.889.12$4,415
Nov 2000047732.215.66$2,699
Oct 2000057931.235.15$2,979
Sep 2000070731.875.19$3,667
Aug 2000088329.644.54$4,009
Jul 2000088428.534.09$3,615
Jun 2000060929.304.40$2,678
May 200001,00327.263.68$3,691
Apr 200001,30724.513.12$4,073
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19970017.582.25$0
Jun 199710925417.242.26$2,452
May 1997042118.972.31$972
Apr 1997050217.882.08$1,046
Mar 1997042218.951.94$818
Feb 1997042420.492.21$935
Jan 1997047023.483.54$1,664
Dec 1996039923.32$0
Nov 199616841621.97$3,691
Oct 1996050123.31$0
Sep 1996035922.22$0
Aug 1996032220.26$0
Jul 1996043719.55$0
Jun 1996112618.73$19
May 1996049419.43$0
Apr 1996031321.51$0
Mar 1996056719.38$0
Feb 1996059916.98$0
Jan 1996066017.07$0
Dec 1995064917.19$0
Nov 1995054516.00$0
Oct 1995065915.43$0
Sep 1995057416.18$0
Aug 199517551015.92$2,786
Jul 1995058215.24$0
Jun 1995087516.41$0
May 1995096917.56$0
Apr 1995140017.73$18
Mar 1995084016.44$0
Feb 1995080816.58$0
Jan 1995083715.92$0
Dec 19940015.03$0
Nov 19940015.90$0
Oct 1994019515.58$0
Sep 1994078715.29$0
Aug 1994073716.13$0
Jul 1994169417.56$18
Jun 1994086817.09$0
May 199401,06615.88$0
Apr 1994088614.14$0
Mar 199418586312.46$2,305
Feb 1994075212.50$0
Jan 1994179912.66$13
Dec 1993081712.33$0
Nov 1993083414.49$0
Oct 1993098615.85$0
Sep 1993090215.03$0
Aug 1993095615.66$0
Jul 199301,21715.46$0
Jun 199301,02516.79$0
May 1993057217.68$0
Apr 199301,09218.05$0
Mar 199301,38618.14$0
Feb 1993055917.90$0
Jan 199318176016.93$3,064

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2005 — as filed, then multipliedworked
Condensate            57 bbl  × $ 43.16 =     $2,460
Gas                    0 Mcf  × $  6.32 =         $0

────────────────────────────────────────────────────
Month total                                   $2,460

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/123861 is the state's own key, not one this site invented.