ABNEY, R.K.

Operated by WINCHESTER PRODUCTION COMPANY (P-5 931352) in the WASKOM (TRAVIS PEAK 5) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 125164District 06Field 95369864NGPA filingCondensateGasSaveExport
Value, all time
$265 k
Jan 1993 – Feb 2004
Value, last 12 filed months
$14 k
at the published price for each month
Months reported
134
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 53 leases and 53 wells, and the rule below applies to all of them.

Discovered
1952-09-09
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: EFFECTIVE AUGUST.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,892 bbl$34,298
GasProduction666,049 Mcf$230,644
Total$264,942

584,910 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4316, -94.1095. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.43155, -94.10946 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,300 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,300 ft.

Completions filed
Nov 2003
1 of 1 wells

1 well

42-2033158286,300 ftNov 2003Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (134)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

134 months

Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 200315030.266.30$454
Nov 20030028.804.60$0
Oct 2003034028.174.76$1,618
Sep 2003029226.314.75$1,387
Aug 2003036129.765.13$1,852
Jul 2003032129.415.17$1,660
Jun 2003030928.565.98$1,849
May 2003034126.595.97$2,037
Apr 2003028226.675.41$1,525
Mar 2003028231.146.10$1,719
Feb 2003032433.487.93$2,568
Jan 2003029630.315.58$1,652
Dec 2002033226.914.85$1,611
Nov 2002030824.664.14$1,274
Oct 2002036326.464.23$1,535
Sep 2002032427.443.64$1,178
Aug 2002032025.963.16$1,013
Jul 2002032124.583.06$983
Jun 2002030123.733.34$1,005
May 2002034124.663.58$1,222
Apr 2002027723.653.51$973
Mar 2002033322.003.10$1,033
Feb 2002030718.222.38$729
Jan 2002027817.172.38$660
Dec 2001020816.932.36$492
Nov 2001037318.072.41$897
Oct 2001039519.782.53$999
Sep 2001051524.262.25$1,159
Aug 2001046824.873.05$1,429
Jul 2001048523.933.20$1,551
Jun 2001038124.563.82$1,457
May 2001047025.524.31$2,024
Apr 2001058324.685.34$3,110
Mar 2001049224.545.38$2,645
Feb 2001049927.755.77$2,878
Jan 2001051827.478.40$4,351
Dec 2000051126.889.12$4,662
Nov 2000045132.215.66$2,552
Oct 2000052031.235.15$2,676
Sep 2000049131.875.19$2,547
Aug 2000050129.644.54$2,275
Jul 2000046328.534.09$1,894
Jun 20006844029.304.40$3,927
May 2000042027.263.68$1,546
Apr 2000033324.513.12$1,038
Mar 2000033628.422.86$961
Feb 2000033427.622.73$911
Jan 2000029325.272.48$727
Dec 1999021024.282.42$509
Nov 1999076923.192.43$1,872
Oct 1999044820.982.80$1,256
Sep 1999040221.752.62$1,053
Aug 1999040719.262.88$1,170
Jul 1999035917.892.37$852
Jun 1999042415.942.36$1,002
May 1999043015.792.32$998
Apr 1999044315.102.21$978
Mar 1999051112.471.84$939
Feb 199906369.981.82$1,156
Jan 1999055010.381.90$1,045
Dec 199804469.201.77$791
Nov 1998046210.892.19$1,010
Oct 1998053312.421.97$1,050
Sep 199802,52312.592.08$5,254
Aug 199802,63211.301.91$5,020
Jul 199802,64311.742.24$5,913
Jun 199802,50711.242.24$5,609
May 199802,60712.622.21$5,752
Apr 199802,50213.042.51$6,268
Mar 199802,45412.802.31$5,667
Feb 199802,49913.952.30$5,746
Jan 199802,57714.702.15$5,553
Dec 199702,59416.322.41$6,254
Nov 199702,60518.193.09$8,045
Oct 199702,68219.253.15$8,448
Sep 199702,66217.742.95$7,866
Aug 199702,81517.862.55$7,192
Jul 199702,78017.582.25$6,246
Jun 199702,84717.242.26$6,426
May 199702,97418.972.31$6,865
Apr 199702,81917.882.08$5,871
Mar 199702,90218.951.94$5,627
Feb 199702,90820.492.21$6,415
Jan 19971323,14423.483.54$14,228
Dec 199602,63823.32$0
Nov 1996011,18321.97$0
Oct 1996013,65623.31$0
Sep 199614912,88522.22$3,311
Aug 1996013,11020.26$0
Jul 1996013,98019.55$0
Jun 1996013,46018.73$0
May 199614413,86519.43$2,798
Apr 1996013,17421.51$0
Mar 1996013,99319.38$0
Feb 1996011,85916.98$0
Jan 199614614,71117.07$2,492
Dec 1995014,92517.19$0
Nov 1995014,54616.00$0
Oct 1995012,70115.43$0
Sep 199506,67716.18$0
Aug 1995014,04115.92$0
Jul 199515014,94915.24$2,286
Jun 1995015,60816.41$0
May 1995014,45617.56$0
Apr 1995014,91017.73$0
Mar 199514414,70316.44$2,367
Feb 1995014,14016.58$0
Jan 1995015,82815.92$0
Dec 199413313,29715.03$1,999
Nov 1994013,60815.90$0
Oct 1994015,17415.58$0
Sep 199413915,18615.29$2,125
Aug 1994015,57016.13$0
Jul 1994016,35317.56$0
Jun 199414118,41417.09$2,410
May 1994019,90815.88$0
Apr 1994020,60814.14$0
Mar 1994013,60012.46$0
Feb 1994011,08712.50$0
Jan 199402,72812.66$0
Dec 1993937,38812.33$1,147
Nov 199305,31614.49$0
Oct 199303,01515.85$0
Sep 1993074615.03$0
Aug 1993040715.66$0
Jul 199301,35015.46$0
Jun 199302,52716.79$0
May 199305,01717.68$0
Apr 19931574,84718.05$2,834
Mar 199311121,09318.14$2,014
Feb 19939519,33817.90$1,701
Jan 19937522,33516.93$1,270

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2003 — as filed, then multipliedworked
Condensate            15 bbl  × $ 30.26 =       $454
Gas                    0 Mcf  × $  6.30 =         $0

────────────────────────────────────────────────────
Month total                                     $454

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/125164 is the state's own key, not one this site invented.