SWIFT

Operated by ETOS OPERATING, INC. (P-5 255131) in the WASKOM (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 129288District 06Field 95369160CondensateGasSaveExport
Value, all time
$372 k
Jan 1993 – Aug 2021
Value, last 12 filed months
$0
at the published price for each month
Months reported
344
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 473 leases and 477 wells, and the rule below applies to all of them.

Discovered
1955-09-19
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2012-11-06.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,246 bbl$30,884
GasProduction284,930 Mcf$341,057
Total$371,941

220,680 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4741, -94.1863. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.47414, -94.18628 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,805 ft
1 wells filed one
Completion to plug
21.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,805 ft.

Completions filed
Nov 1999
1 of 1 wells
Plug dates filed
Aug 2021
1 of 1 wells

Last completion to plug: a median of 21.8 years across the 1 well that filed both dates, with the middle half between 21.8 years and 21.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2033173679,805 ftNov 1999Aug 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (344)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

344 months

Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190153.472.42$2
Sep 20190155.052.66$3
Aug 20190153.112.30$2
Jul 20190156.272.46$2
Jun 20190152.782.49$2
May 20190158.482.74$3
Apr 20190162.632.75$3
Mar 20190156.803.06$3
Feb 20190150.852.79$3
Jan 20190146.033.23$3
Dec 20180146.594.19$4
Nov 20180152.934.24$4
Oct 20180161.443.40$3
Sep 20180159.543.11$3
Aug 20180159.403.07$3
Jul 20180165.142.93$3
Jun 20180160.183.08$3
May 20180165.382.90$3
Apr 20180163.842.90$3
Mar 20180261.222.79$6
Feb 20180261.782.77$6
Jan 20180262.874.01$8
Dec 20170257.272.92$6
Nov 20170155.423.12$3
Oct 20170149.292.98$3
Sep 20170247.523.09$6
Aug 20170245.373.00$6
Jul 20170143.873.09$3
Jun 20170142.493.09$3
May 20170245.373.26$7
Apr 20170147.933.21$3
Mar 20170246.772.98$6
Feb 20170250.452.95$6
Jan 20170249.413.42$7
Dec 20160148.763.72$4
Nov 20160242.492.64$5
Oct 20160246.193.09$6
Sep 20160141.553.10$3
Aug 20160241.442.92$6
Jul 20160141.622.92$3
Jun 20160145.352.69$3
May 20160042.521.99$0
Apr 20160136.561.99$2
Mar 20160133.011.79$2
Feb 20160126.472.06$2
Jan 20160227.352.36$5
Dec 20150232.362.00$4
Nov 20150238.792.17$4
Oct 20150443.552.43$10
Sep 20150342.992.76$8
Aug 20150540.162.87$14
Jul 20150648.152.95$18
Jun 20150656.152.88$17
May 201501155.212.96$33
Apr 20150249.822.71$5
Mar 20150242.892.93$6
Feb 201501044.662.98$30
Jan 201501043.433.10$31
Dec 201401354.693.59$47
Nov 201401070.464.25$43
Oct 20140078.303.90$0
Sep 201401486.164.05$57
Aug 20140089.394.04$0
Jul 201401096.564.18$42
Jun 201401298.164.74$57
May 201401794.734.73$80
Apr 201401195.944.81$53
Mar 201401495.895.06$71
Feb 201401097.406.19$62
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201305104.253.52$18
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130693.964.28$26
Mar 201301093.623.91$39
Feb 20130891.233.42$27
Jan 201301491.603.42$48
Dec 201201386.773.42$44
Nov 201201386.953.62$47
Oct 20120689.383.40$20
Sep 20120794.672.92$20
Aug 20120292.662.91$6
Jul 20120285.133.02$6
Jun 201202479.822.52$60
May 201204891.612.49$119
Apr 2012035101.652.00$70
Mar 201204105.052.22$9
Feb 201202101.102.57$5
Jan 20120998.092.73$25
Dec 20110096.873.24$0
Nov 2011026395.723.31$871
Oct 2011041984.983.65$1,529
Sep 2011048983.623.99$1,949
Aug 2011037283.404.15$1,544
Jul 2011033094.144.52$1,491
Jun 20110592.904.64$23
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110686.504.59$28
Dec 201023785.734.35$332
Nov 201003080.843.80$114
Oct 201003978.103.51$137
Sep 201003972.633.98$155
Aug 201004873.684.42$212
Jul 201002972.554.74$137
Jun 20100070.364.91$0
May 20100771.124.24$30
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 201001773.585.44$93
Jan 20100774.365.96$42
Dec 200999071.445.48$7,073
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 200902467.423.22$77
Jul 200903261.133.46$111
Jun 200902866.163.90$109
May 200901454.743.93$55
Apr 200903746.773.59$133
Mar 200905542.144.06$223
Feb 200901832.814.63$83
Jan 20090535.865.37$27
Dec 200801537.105.98$90
Nov 200801855.496.86$123
Oct 20080775.246.92$48
Sep 200809101.767.88$71
Aug 2008015114.228.48$127
Jul 2008042131.0811.39$478
Jun 2008091131.3313.03$1,186
May 20080236123.1711.57$2,732
Apr 20080179110.3110.45$1,871
Mar 2008076101.909.66$734
Feb 2008034492.538.77$3,017
Jan 2008038290.388.21$3,135
Dec 2007439688.337.30$3,245
Nov 2007068191.677.29$4,966
Oct 2007043582.856.92$3,011
Sep 2007043175.846.24$2,691
Aug 2007057669.066.39$3,679
Jul 2007040670.906.39$2,594
Jun 2007037962.007.55$2,861
May 2007046858.747.85$3,672
Apr 2007050759.617.81$3,957
Mar 2007042756.927.30$3,118
Feb 2007054355.108.22$4,461
Jan 2007065550.306.73$4,406
Dec 2006056356.656.92$3,895
Nov 2006067554.207.62$5,142
Oct 2006073554.906.01$4,420
Sep 2006083060.085.04$4,181
Aug 200601,00168.717.34$7,347
Jul 2006093769.376.34$5,943
Jun 2006086266.286.38$5,503
May 2006089266.016.42$5,731
Apr 2006055964.397.36$4,115
Mar 2006038756.707.08$2,741
Feb 2006010357.597.75$798
Jan 2006015260.598.93$1,358
Dec 2005071154.9413.42$9,538
Nov 2005061954.6910.59$6,554
Oct 2005078158.3413.80$10,774
Sep 2005096861.4512.08$11,692
Aug 2005081861.519.80$8,014
Jul 20051141,00655.697.84$14,239
Jun 200501,14352.337.38$8,437
May 200501,37545.226.65$9,145
Apr 200501,46849.207.36$10,805
Mar 200501,72950.377.15$12,371
Feb 200501,25445.226.31$7,915
Jan 200501,79943.166.32$11,374
Dec 200401,99039.866.75$13,435
Nov 200402,08345.286.33$13,186
Oct 200402,75549.706.52$17,949
Sep 20040043.245.28$0
Aug 2004021542.375.55$1,193
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 20020024.583.06$0
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 20020022.003.10$0
Feb 20020018.222.38$0
Jan 20020017.172.38$0
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 20010024.262.25$0
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 199905723.192.43$139
Oct 199905020.982.80$140
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 19990010.381.90$0
Dec 1998009.201.77$0
Nov 19980010.892.19$0
Oct 19980012.421.97$0
Sep 19980012.592.08$0
Aug 19980011.301.91$0
Jul 19980011.742.24$0
Jun 19980011.242.24$0
May 19980012.622.21$0
Apr 19980013.042.51$0
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 1997063717.742.95$1,882
Aug 199705,30317.862.55$13,548
Jul 19971934,03717.582.25$12,464
Jun 199701,53917.242.26$3,474
May 199702,21918.972.31$5,123
Apr 199702,79317.882.08$5,817
Mar 199702,96518.951.94$5,750
Feb 199702,80820.492.21$6,194
Jan 199703,32323.483.54$11,762
Dec 199603,29523.32$0
Nov 199603,37421.97$0
Oct 199603,58323.31$0
Sep 199613,91322.22$22
Aug 199614,55320.26$20
Jul 199614,72719.55$20
Jun 199624,10518.73$37
May 199603,67719.43$0
Apr 199603,42821.51$0
Mar 199604,33219.38$0
Feb 199614,42216.98$17
Jan 19961484,77917.07$2,526
Dec 199525,10917.19$34
Nov 199514,37716.00$16
Oct 199514,61315.43$15
Sep 199545,62816.18$65
Aug 199504,37515.92$0
Jul 199503,86915.24$0
Jun 199504,53416.41$0
May 199504,36517.56$0
Apr 199504,77417.73$0
Mar 19951924,22816.44$3,156
Feb 199504,79116.58$0
Jan 199505,14415.92$0
Dec 199405,60315.03$0
Nov 199413,93415.90$16
Oct 199404,85815.58$0
Sep 199414,93015.29$15
Aug 199415,79916.13$16
Jul 199415,05717.56$18
Jun 19941793,83717.09$3,059
May 199414,94015.88$16
Apr 199404,16814.14$0
Mar 199406,12112.46$0
Feb 19941467,08212.50$1,825
Jan 199403,80612.66$0
Dec 199303,63112.33$0
Nov 199303,62414.49$0
Oct 199303,95415.85$0
Sep 199303,91515.03$0
Aug 199304,31015.66$0
Jul 199314,83615.46$15
Jun 199305,68916.79$0
May 19931465,98817.68$2,581
Apr 199315,39918.05$18
Mar 199305,56918.14$0
Feb 199324,77617.90$36
Jan 199304,85916.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Oct 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 53.47 =         $0
Gas                    1 Mcf  × $  2.42 =         $2

────────────────────────────────────────────────────
Month total                                       $2

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/129288 is the state's own key, not one this site invented.