MCFADDIN "A"

Operated by APACHE CORPORATION (P-5 27200) in the APPLEBY, N (PETTIT) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 131175District 06Field 03311500CondensateGasSaveExport
Value, all time
$1.5 M
Jan 1993 – May 2002
Value, last 12 filed months
$43 k
at the published price for each month
Months reported
113
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 98 leases and 98 wells, and the rule below applies to all of them.

Discovered
1981-11-13
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: PEAK) WERE CONSOLIDATED INTO APPLEBY, N. (ROD-TP CONS) 4/14/09.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition17,985 bbl$302,819
GasProduction1,826,683 Mcf$1,212,041
Total$1,514,860

1,366,056 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8067, -94.5903. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.80674, -94.59028 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,258 ft
1 wells filed one
Completion to plug
20.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,258 ft.

Completions filed
Dec 2005
1 of 1 wells
Plug dates filed
Jun 2026
1 of 1 wells

Last completion to plug: a median of 20.5 years across the 1 well that filed both dates, with the middle half between 20.5 years and 20.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-34730934110,258 ftDec 2005Jun 2026Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (113)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

113 months

May 200215024.663.58$370
Apr 20021478523.653.51$3,088
Mar 200201,45522.003.10$4,514
Feb 20021798818.222.38$2,657
Jan 2002101,27017.172.38$3,189
Dec 200101,13916.932.36$2,693
Nov 2001211,13118.072.41$3,100
Oct 2001281,09219.782.53$3,315
Sep 200101,37724.262.25$3,100
Aug 2001301,23524.873.05$4,517
Jul 2001351,68223.933.20$6,215
Jun 2001241,41024.563.82$5,982
May 200101,70925.524.31$7,361
Apr 2001231,83924.685.34$10,379
Mar 200101,97724.545.38$10,629
Feb 2001362,37327.755.77$14,684
Jan 2001401,36127.478.40$12,530
Dec 2000311,76126.889.12$16,898
Nov 200092,83832.215.66$16,347
Oct 200003,26031.235.15$16,774
Sep 2000503,30131.875.19$18,714
Aug 2000464,11229.644.54$20,035
Jul 200004,07828.534.09$16,678
Jun 2000423,83029.304.40$18,072
May 200004,82827.263.68$17,766
Apr 2000605,41424.513.12$18,341
Mar 2000525,93928.422.86$18,462
Feb 200005,77927.622.73$15,756
Jan 2000766,00925.272.48$16,826
Dec 1999666,71024.282.42$17,866
Nov 1999506,37223.192.43$16,669
Oct 1999315,79820.982.80$16,906
Sep 199905,34821.752.62$14,006
Aug 1999416,56919.262.88$19,679
Jul 1999616,85117.892.37$17,344
Jun 1999666,47715.942.36$16,351
May 1999806,95815.792.32$17,413
Apr 199907,45515.102.21$16,461
Mar 1999787,31112.471.84$14,413
Feb 1999755,7209.981.82$11,146
Jan 1999848,05410.381.90$16,174
Dec 1998818,7819.201.77$16,317
Nov 1998839,01910.892.19$20,617
Oct 1998709,36712.421.97$19,315
Sep 1998549,38512.592.08$20,225
Aug 1998719,92611.301.91$19,735
Jul 19986610,21511.742.24$23,629
Jun 1998699,95011.242.24$23,036
May 19982215,16112.622.21$33,728
Apr 19982215,44213.042.51$38,974
Mar 19982112,68712.802.31$29,569
Feb 19984210,61013.952.30$24,980
Jan 199810812,58114.702.15$28,697
Dec 199713112,94516.322.41$33,350
Nov 19975412,94418.193.09$40,957
Oct 19977713,74819.253.15$44,786
Sep 19972714,23817.742.95$42,551
Aug 19979615,32717.862.55$40,871
Jul 199714715,29017.582.25$36,940
Jun 199716213,78417.242.26$33,906
May 199712014,41418.972.31$35,551
Apr 19979314,62417.882.08$32,121
Mar 19978115,42818.951.94$31,452
Feb 199714914,59320.492.21$35,244
Jan 199716316,57323.483.54$62,491
Dec 19969417,19523.32$2,192
Nov 199615417,99521.97$3,383
Oct 199614818,62323.31$3,450
Sep 199629818,75822.22$6,622
Aug 199615520,08120.26$3,140
Jul 199615120,37719.55$2,952
Jun 199615220,23218.73$2,847
May 199615921,29919.43$3,089
Apr 199615718,96321.51$3,377
Mar 199632522,05419.38$6,299
Feb 199613921,21616.98$2,360
Jan 199628321,27817.07$4,831
Dec 199514821,27417.19$2,544
Nov 199529022,22916.00$4,640
Oct 199514723,85015.43$2,268
Sep 199515223,47616.18$2,459
Aug 199527824,36015.92$4,426
Jul 199529124,80215.24$4,435
Jun 199516424,68116.41$2,691
May 199529126,13517.56$5,110
Apr 199514325,22617.73$2,535
Mar 199526326,78716.44$4,324
Feb 199527225,07716.58$4,510
Jan 199526528,24115.92$4,219
Dec 199428828,56015.03$4,329
Nov 199427728,67815.90$4,404
Oct 199429429,96715.58$4,581
Sep 199426228,39415.29$4,006
Aug 199426229,81016.13$4,226
Jul 199428130,47717.56$4,934
Jun 199430629,86017.09$5,230
May 199433831,00515.88$5,367
Apr 199432930,91314.14$4,652
Mar 199434332,16612.46$4,274
Feb 199465828,76412.50$8,225
Jan 199412832,02712.66$1,620
Dec 199345634,08312.33$5,622
Nov 199335234,36014.49$5,100
Oct 199350036,73315.85$7,925
Sep 199352437,02215.03$7,876
Aug 199333638,79415.66$5,262
Jul 199350739,66715.46$7,838
Jun 199351938,79716.79$8,714
May 199350741,42617.68$8,964
Apr 199353041,79718.05$9,567
Mar 199337743,71418.14$6,839
Feb 199359140,77117.90$10,579
Jan 199380144,06216.93$13,561

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2002 — as filed, then multipliedworked
Condensate            15 bbl  × $ 24.66 =       $370
Gas                    0 Mcf  × $  3.58 =         $0

────────────────────────────────────────────────────
Month total                                     $370

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/131175 is the state's own key, not one this site invented.