Operated by R. LACY SERVICES, LTD. (P-5 687208) in the CARTHAGE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 132442District 06Field 160321742 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.8 M
Jan 1993 – Aug 2022
Value, last 12 filed months
$0
at the published price for each month
Months reported
356
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,104 leases and 4,104 wells, and the rule below applies to all of them.

Discovered
1968-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-02-08.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111990-01-04121498
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition6,174 bbl$104,301
GasProduction1,767,262 Mcf$4,707,392
Total$4,811,694

660,602 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2540, -94.3515. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.25404, -94.35148 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,830 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,830 ft.

Completions filed
Aug 2022
1 of 1 wells

1 well

42-365321934R9,830 ftAug 2022Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (356)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

356 months

Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 202007138.371.83$130
Jun 20200034.901.69$0
May 2020014316.921.81$260
Apr 2020051914.751.80$936
Mar 2020054330.341.86$1,008
Feb 2020051749.881.98$1,024
Jan 2020055457.252.09$1,160
Dec 2019056059.012.30$1,290
Nov 2019050555.302.75$1,389
Oct 2019055553.472.42$1,342
Sep 2019052755.052.66$1,400
Aug 2019055153.112.30$1,270
Jul 2019056756.272.46$1,395
Jun 2019055452.782.49$1,380
May 2019058958.482.74$1,614
Apr 2019058262.632.75$1,601
Mar 2019060756.803.06$1,859
Feb 2019055450.852.79$1,547
Jan 2019062146.033.23$2,005
Dec 2018061546.594.19$2,574
Nov 2018058952.934.24$2,496
Oct 2018062761.443.40$2,131
Sep 2018062859.543.11$1,952
Aug 2018063559.403.07$1,947
Jul 2018062665.142.93$1,835
Jun 2018062160.183.08$1,911
May 2018074965.382.90$2,173
Apr 2018080263.842.90$2,326
Mar 2018067061.222.79$1,867
Feb 2018059061.782.77$1,632
Jan 2018064662.874.01$2,590
Dec 2017057057.272.92$1,665
Nov 2017062155.423.12$1,937
Oct 2017065449.292.98$1,951
Sep 2017068347.523.09$2,109
Aug 2017081745.373.00$2,455
Jul 2017084343.873.09$2,603
Jun 2017099842.493.09$3,081
May 201701,12745.373.26$3,678
Apr 2017090547.933.21$2,907
Mar 201701,02046.772.98$3,043
Feb 2017378550.452.95$2,469
Jan 2017151,39449.413.42$5,507
Dec 2016151,43148.763.72$6,059
Nov 201601,16042.492.64$3,067
Oct 201601,23546.193.09$3,816
Sep 201601,09041.553.10$3,380
Aug 201601,54941.442.92$4,530
Jul 201601,46541.622.92$4,284
Jun 201601,05845.352.69$2,842
May 201601,22842.521.99$2,445
Apr 201601,08836.561.99$2,166
Mar 2016099633.011.79$1,787
Feb 201601,05426.472.06$2,175
Jan 201601,62527.352.36$3,842
Dec 201501,65832.362.00$3,318
Nov 201501,16438.792.17$2,523
Oct 201501,34243.552.43$3,256
Sep 201501,22342.992.76$3,374
Aug 201501,42640.162.87$4,096
Jul 201501,75248.152.95$5,160
Jun 201501,87856.152.88$5,414
May 201501,34855.212.96$3,984
Apr 201501,53149.822.71$4,144
Mar 201501,55842.892.93$4,572
Feb 201501,21344.662.98$3,610
Jan 201501,29143.433.10$4,003
Dec 201401,24854.693.59$4,482
Nov 201401,50470.464.25$6,395
Oct 201401,21478.303.90$4,736
Sep 201401,26686.164.05$5,122
Aug 201401,41389.394.04$5,702
Jul 201401,58696.564.18$6,629
Jun 201401,81398.164.74$8,588
May 201402,07194.734.73$9,789
Apr 201402,14395.944.81$10,306
Mar 201402,25495.895.06$11,398
Feb 201401,76397.406.19$10,917
Jan 201401,93490.404.86$9,401
Dec 201302,15691.824.35$9,388
Nov 201302,12088.853.74$7,925
Oct 201302,53997.423.78$9,596
Sep 201302,810104.113.72$10,447
Aug 201302,576104.253.52$9,074
Jul 201302,496102.523.72$9,279
Jun 201302,35394.403.93$9,255
May 201302,02094.834.15$8,381
Apr 201302,23593.964.28$9,572
Mar 201301,72393.623.91$6,742
Feb 201301,67391.233.42$5,722
Jan 201301,87291.603.42$6,402
Dec 201201,80986.773.42$6,187
Nov 201202,14586.953.62$7,776
Oct 201201,85089.383.40$6,289
Sep 201201,74094.672.92$5,078
Aug 201202,41492.662.91$7,020
Jul 201201,97385.133.02$5,960
Jun 201202,32879.822.52$5,864
May 201202,11791.612.49$5,268
Apr 201202,515101.652.00$5,022
Mar 201201,884105.052.22$4,186
Feb 201202,000101.102.57$5,140
Jan 201202,14198.092.73$5,854
Dec 201102,16996.873.24$7,027
Nov 201102,13595.723.31$7,070
Oct 201102,53184.983.65$9,234
Sep 201101,50783.623.99$6,007
Aug 201102,22483.404.15$9,228
Jul 201102,12194.144.52$9,581
Jun 201102,39992.904.64$11,131
May 201102,36798.134.40$10,426
Apr 201102,646105.964.33$11,466
Mar 201102,38996.364.06$9,693
Feb 201102,44785.644.18$10,228
Jan 201103,06586.504.59$14,065
Dec 201002,99485.734.35$13,017
Nov 201002,29680.843.80$8,714
Oct 201002,48878.103.51$8,730
Sep 201002,53372.633.98$10,080
Aug 201002,82573.684.42$12,485
Jul 201002,70972.554.74$12,831
Jun 201002,30770.364.91$11,328
May 201002,95971.124.24$12,532
Apr 201002,75081.694.12$11,337
Mar 201002,84178.394.39$12,468
Feb 201002,79373.585.44$15,201
Jan 201002,64074.365.96$15,745
Dec 200902,65871.445.48$14,576
Nov 200902,76674.593.75$10,377
Oct 200902,75472.544.11$11,320
Sep 200903,03165.543.06$9,289
Aug 200902,89067.423.22$9,301
Jul 200903,13761.133.46$10,868
Jun 200902,99666.163.90$11,669
May 200903,18854.743.93$12,515
Apr 200903,28846.773.59$11,796
Mar 200903,60142.144.06$14,616
Feb 200901,06532.814.63$4,934
Jan 200903,27035.865.37$17,563
Dec 200803,18537.105.98$19,037
Nov 200802,84555.496.86$19,518
Oct 200803,09375.246.92$21,410
Sep 200802,949101.767.88$23,230
Aug 200803,224114.228.48$27,349
Jul 200803,386131.0811.39$38,565
Jun 200803,306131.3313.03$43,086
May 200803,524123.1711.57$40,788
Apr 200803,386110.3110.45$35,400
Mar 200803,669101.909.66$35,457
Feb 200803,46192.538.77$30,355
Jan 200804,08290.388.21$33,496
Dec 200703,45088.337.30$25,192
Nov 200702,73591.677.29$19,943
Oct 200703,44082.856.92$23,812
Sep 200703,78775.846.24$23,647
Aug 200703,78069.066.39$24,146
Jul 200703,84570.906.39$24,562
Jun 200703,89862.007.55$29,424
May 200703,78258.747.85$29,675
Apr 200702,72659.617.81$21,277
Mar 200703,88656.927.30$28,375
Feb 200703,41055.108.22$28,017
Jan 200703,73650.306.73$25,132
Dec 200604,01056.656.92$27,743
Nov 200603,19154.207.62$24,307
Oct 200602,47154.906.01$14,860
Sep 200602,95360.085.04$14,875
Aug 200603,16968.717.34$23,260
Jul 200603,26669.376.34$20,715
Jun 200602,78566.286.38$17,779
May 200604,07666.016.42$26,188
Apr 200603,67764.397.36$27,064
Mar 200604,63556.707.08$32,829
Feb 200602,83457.597.75$21,967
Jan 200602,98760.598.93$26,684
Dec 200503,74854.9413.42$50,281
Nov 200504,15154.6910.59$43,952
Oct 200504,89658.3413.80$67,544
Sep 200502,55461.4512.08$30,850
Aug 200502,62361.519.80$25,697
Jul 200502,93455.697.84$23,013
Jun 200503,41652.337.38$25,214
May 200504,09045.226.65$27,203
Apr 200504,05149.207.36$29,817
Mar 200504,65750.377.15$33,320
Feb 200504,01645.226.31$25,349
Jan 200503,77943.166.32$23,892
Dec 200404,57839.866.75$30,906
Nov 200405,04345.286.33$31,924
Oct 200402,35049.706.52$15,310
Sep 200404,07943.245.28$21,553
Aug 200404,88842.375.55$27,132
Jul 200405,13738.286.08$31,254
Jun 200404,91336.106.43$31,605
May 200404,99037.486.49$32,408
Apr 200404,53834.475.86$26,586
Mar 200404,81034.365.53$26,600
Feb 200405,01532.455.51$27,631
Jan 200405,53632.036.30$34,875
Dec 200305,64030.266.30$35,541
Nov 200305,50528.804.60$25,296
Oct 200305,49228.174.76$26,140
Sep 200305,75426.314.75$27,328
Aug 200305,89429.765.13$30,235
Jul 200306,03029.415.17$31,180
Jun 200306,13428.565.98$36,699
May 200306,30326.595.97$37,646
Apr 200305,78126.675.41$31,259
Mar 200306,38131.146.10$38,899
Feb 200305,94933.487.93$47,151
Jan 200306,66530.315.58$37,204
Dec 200206,82426.914.85$33,122
Nov 200206,86324.664.14$28,392
Oct 200206,97526.464.23$29,498
Sep 200206,94527.443.64$25,246
Aug 200208,50825.963.16$26,921
Jul 200205,85624.583.06$17,930
Jun 200205,69623.733.34$19,015
May 200206,25024.663.58$22,400
Apr 200204,95823.653.51$17,414
Mar 200206,36822.003.10$19,758
Feb 200206,31218.222.38$14,995
Jan 200207,35217.172.38$17,466
Dec 200107,80016.932.36$18,442
Nov 200105,93818.072.41$14,284
Oct 200106,14319.782.53$15,535
Sep 200106,89124.262.25$15,514
Aug 200106,84524.873.05$20,899
Jul 200105,27123.933.20$16,852
Jun 200106,62424.563.82$25,331
May 200106,72925.524.31$28,984
Apr 200105,77724.685.34$30,822
Mar 200106,83624.545.38$36,753
Feb 200106,31427.755.77$36,413
Jan 200106,77727.478.40$56,918
Dec 200006,93126.889.12$63,228
Nov 200006,83032.215.66$38,644
Oct 200006,96431.235.15$35,833
Sep 200007,16031.875.19$37,135
Aug 200007,54629.644.54$34,265
Jul 200007,56728.534.09$30,947
Jun 200007,16729.304.40$31,515
May 200007,61327.263.68$28,014
Apr 200007,65024.513.12$23,837
Mar 200007,32628.422.86$20,951
Feb 200007,45827.622.73$20,334
Jan 200008,19825.272.48$20,335
Dec 199907,54724.282.42$18,292
Nov 199907,50623.192.43$18,270
Oct 19991018,38120.982.80$25,617
Sep 199908,16921.752.62$21,393
Aug 19991777,93219.262.88$26,218
Jul 199908,56017.892.37$20,307
Jun 199907,77915.942.36$18,375
May 199907,89315.792.32$18,320
Apr 19991768,11015.102.21$20,565
Mar 199906,52512.471.84$11,995
Feb 199907,2019.981.82$13,090
Jan 19991828,92510.381.90$18,846
Dec 199807,6309.201.77$13,530
Nov 199818,53610.892.19$18,668
Oct 199807,38212.421.97$14,537
Sep 199808,95912.592.08$18,658
Aug 1998010,42611.301.91$19,886
Jul 1998011,02011.742.24$24,655
Jun 19981809,94611.242.24$24,275
May 1998111,39012.622.21$25,143
Apr 199807,97013.042.51$19,967
Mar 1998110,14412.802.31$23,440
Feb 19981868,50213.952.30$22,142
Jan 1998210,25214.702.15$22,120
Dec 1997110,84216.322.41$26,157
Nov 199718411,22218.193.09$38,003
Oct 199719,33819.253.15$29,432
Sep 1997110,23517.742.95$30,261
Aug 1997211,24617.862.55$28,766
Jul 199717511,53117.582.25$28,986
Jun 1997010,88917.242.26$24,579
May 1997011,92518.972.31$27,529
Apr 199718011,13217.882.08$26,404
Mar 1997012,09318.951.94$23,450
Feb 199718010,85120.492.21$27,624
Jan 1997012,27623.483.54$43,453
Dec 1996011,14023.32$0
Nov 199618011,34121.97$3,955
Oct 1996111,63023.31$23
Sep 199618111,36822.22$4,022
Aug 1996111,75220.26$20
Jul 1996111,57919.55$20
Jun 199618111,74318.73$3,390
May 1996112,66919.43$19
Apr 199618112,16421.51$3,893
Mar 1996112,95919.38$19
Feb 1996111,94316.98$17
Jan 199618413,34017.07$3,141
Dec 1995113,34117.19$17
Nov 199518213,17416.00$2,912
Oct 1995113,49015.43$15
Sep 199518214,12916.18$2,945
Aug 1995014,52515.92$0
Jul 199518013,50215.24$2,743
Jun 1995114,37716.41$16
May 199518114,29617.56$3,178
Apr 1995112,99917.73$18
Mar 199518011,90716.44$2,959
Feb 1995111,24516.58$17
Jan 19951739,71915.92$2,754
Dec 1994013,55315.03$0
Nov 199418514,01015.90$2,942
Oct 1994013,85215.58$0
Sep 199418013,81615.29$2,752
Aug 1994014,38216.13$0
Jul 199418216,42117.56$3,196
Jun 1994015,41317.09$0
May 199418117,51315.88$2,874
Apr 199418212,59714.14$2,573
Mar 1994014,11112.46$0
Feb 19945214,80112.50$650
Jan 199418317,34512.66$2,317
Dec 1993114,33112.33$12
Nov 199318212,22114.49$2,637
Oct 199318115,20915.85$2,869
Sep 1993015,87715.03$0
Aug 199318015,94515.66$2,819
Jul 1993116,43815.46$15
Jun 199317815,51316.79$2,989
May 199318114,42817.68$3,200
Apr 199318115,46318.05$3,267
Mar 1993016,74518.14$0
Feb 199318314,46517.90$3,276
Jan 1993115,82116.93$17

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2020 — as filed, then multipliedworked
Condensate             0 bbl  × $ 38.37 =         $0
Gas                   71 Mcf  × $  1.83 =       $130

────────────────────────────────────────────────────
Month total                                     $130

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well