Operated by ROOSTH PRODUCTION CO. (P-5 727091) in the TRAWICK, EAST (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 141604District 06Field 910005002 tax incentive programmesCondensateGasSaveExport
Value, all time
$197 k
Jan 1993 – Oct 2004
Value, last 12 filed months
$10 k
at the published price for each month
Months reported
142
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2 leases and 2 wells, and the rule below applies to all of them.

Discovered
1987-01-09
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111993-11-20128606
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition510 bbl$11,717
GasProduction161,072 Mcf$185,289
Total$197,006

101,812 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8305, -94.6903. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.83053, -94.69032 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,700 ft
1 wells filed one
Completion to plug
16.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,700 ft.

Completions filed
Feb 1988
1 of 1 wells
Plug dates filed
Jun 2004
1 of 1 wells

Last completion to plug: a median of 16.3 years across the 1 well that filed both dates, with the middle half between 16.3 years and 16.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3473152828,700 ftFeb 1988Jun 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (142)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

142 months

Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 200417822236.106.43$7,854
May 2004013937.486.49$903
Apr 200404734.475.86$275
Mar 200404034.365.53$221
Feb 20040032.455.51$0
Jan 200408832.036.30$554
Dec 20030130.266.30$6
Nov 200303228.804.60$147
Oct 2003127228.174.76$1,323
Sep 2003018426.314.75$874
Aug 2003015829.765.13$811
Jul 2003017129.415.17$884
Jun 2003010128.565.98$604
May 2003011726.595.97$699
Apr 2003027626.675.41$1,492
Mar 2003035031.146.10$2,134
Feb 2003018933.487.93$1,498
Jan 2003029630.315.58$1,652
Dec 2002010926.914.85$529
Nov 2002016824.664.14$695
Oct 2002026426.464.23$1,116
Sep 2002020627.443.64$749
Aug 2002021525.963.16$680
Jul 2002028324.583.06$866
Jun 200201,34523.733.34$4,490
May 2002044324.663.58$1,588
Apr 200201,56123.653.51$5,483
Mar 200201,46922.003.10$4,558
Feb 2002036218.222.38$860
Jan 200201,32317.172.38$3,143
Dec 200101,31016.932.36$3,097
Nov 200101,48418.072.41$3,570
Oct 200101,63919.782.53$4,145
Sep 200101,59624.262.25$3,593
Aug 2001074824.873.05$2,284
Jul 2001097223.933.20$3,108
Jun 2001085224.563.82$3,258
May 2001095525.524.31$4,113
Apr 2001152524.685.34$2,826
Mar 2001056724.545.38$3,048
Feb 2001081627.755.77$4,706
Jan 2001049127.478.40$4,124
Dec 2000036626.889.12$3,339
Nov 2000072632.215.66$4,108
Oct 2000087431.235.15$4,497
Sep 2000059331.875.19$3,076
Aug 2000063829.644.54$2,897
Jul 2000059228.534.09$2,421
Jun 2000074329.304.40$3,267
May 2000078027.263.68$2,870
Apr 2000068024.513.12$2,119
Mar 2000062828.422.86$1,796
Feb 2000070727.622.73$1,928
Jan 2000042925.272.48$1,064
Dec 1999039624.282.42$960
Nov 1999066123.192.43$1,609
Oct 1999074620.982.80$2,092
Sep 1999074621.752.62$1,954
Aug 199901,00519.262.88$2,890
Jul 1999064717.892.37$1,535
Jun 1999199315.942.36$2,362
May 1999090215.792.32$2,094
Apr 1999083315.102.21$1,839
Mar 19990012.471.84$0
Feb 199903029.981.82$549
Jan 1999029310.381.90$557
Dec 199804009.201.77$709
Nov 1998072410.892.19$1,582
Oct 1998076012.421.97$1,497
Sep 1998054812.592.08$1,141
Aug 1998098511.301.91$1,879
Jul 1998059911.742.24$1,340
Jun 1998067111.242.24$1,501
May 1998084612.622.21$1,867
Apr 1998088513.042.51$2,217
Mar 1998095312.802.31$2,201
Feb 1998088613.952.30$2,037
Jan 1998086514.702.15$1,864
Dec 199701,12916.322.41$2,722
Nov 199701,19918.193.09$3,703
Oct 199701,13419.253.15$3,572
Sep 1997052117.742.95$1,539
Aug 1997091217.862.55$2,330
Jul 199701,15817.582.25$2,602
Jun 199701,07517.242.26$2,426
May 1997089818.972.31$2,073
Apr 199701,36217.882.08$2,837
Mar 199701,22418.951.94$2,374
Feb 1997089620.492.21$1,976
Jan 1997096423.483.54$3,412
Dec 1996091023.32$0
Nov 199601,34721.97$0
Oct 199601,43923.31$0
Sep 199601,06622.22$0
Aug 199611,29420.26$20
Jul 199601,70819.55$0
Jun 199602,09218.73$0
May 199612,72919.43$19
Apr 199622,71021.51$43
Mar 199612,26619.38$19
Feb 1996025616.98$0
Jan 1996022817.07$0
Dec 1995047617.19$0
Nov 199501,69216.00$0
Oct 1995048615.43$0
Sep 199502,24116.18$0
Aug 19950015.92$0
Jul 19950015.24$0
Jun 199511,06316.41$16
May 199501,16317.56$0
Apr 19950017.73$0
Mar 1995050116.44$0
Feb 1995053316.58$0
Jan 199501,35715.92$0
Dec 1994081415.03$0
Nov 1994171,39115.90$270
Oct 199401,83215.58$0
Sep 1994262,07815.29$398
Aug 199422,95916.13$32
Jul 1994373,28317.56$650
Jun 199413,32417.09$17
May 199414,17315.88$16
Apr 199404,31114.14$0
Mar 199423,80212.46$25
Feb 199401,79912.50$0
Jan 1994362,71412.66$456
Dec 199313,80112.33$12
Nov 199301,72614.49$0
Oct 199302,25215.85$0
Sep 199323,22415.03$30
Aug 19931465,45515.66$2,286
Jul 199346,89515.46$62
Jun 199315,76116.79$17
May 1993418,22917.68$725
Apr 199321,15018.05$36
Mar 1993461618.14$73
Feb 199301,24617.90$0
Jan 199301,42016.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2004 — as filed, then multipliedworked
Condensate           178 bbl  × $ 36.10 =     $6,426
Gas                  222 Mcf  × $  6.43 =     $1,428

────────────────────────────────────────────────────
Month total                                   $7,854

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/141604 is the state's own key, not one this site invented.