KYLE, J.R. "A"

Operated by RME PETROLEUM COMPANY (P-5 714229) in the CARTHAGE (TRAVIS PEAK-SMITH, S.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 144021District 06Field 16032911CondensateGasSaveExport
Value, all time
$270 k
Jan 1993 – Jun 2002
Value, last 12 filed months
$6 k
at the published price for each month
Months reported
114
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 10 leases and 10 wells, and the rule below applies to all of them.

Discovered
1992-05-12
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 02/01/93.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,273 bbl$53,788
GasProduction713,779 Mcf$215,964
Total$269,752

627,314 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0840, -94.2902. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.08404, -94.29017 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,450 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,450 ft.

Completions filed
Jun 2002
1 of 1 wells

1 well

42-365326926-C9,450 ftJun 2002Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (114)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

114 months

Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 20020023.653.51$0
Mar 200209722.003.10$301
Feb 2002019318.222.38$459
Jan 2002029717.172.38$706
Dec 20010016.932.36$0
Nov 2001031118.072.41$748
Oct 2001030319.782.53$766
Sep 2001075924.262.25$1,709
Aug 2001030724.873.05$937
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 2001013025.524.31$560
Apr 2001048024.685.34$2,561
Mar 200109524.545.38$511
Feb 2001011527.755.77$663
Jan 2001030827.478.40$2,587
Dec 2000073226.889.12$6,678
Nov 2000035732.215.66$2,020
Oct 2000012331.235.15$633
Sep 2000031931.875.19$1,654
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000127.263.68$4
Apr 2000085424.513.12$2,661
Mar 200001,14528.422.86$3,274
Feb 20000027.622.73$0
Jan 200001,83925.272.48$4,562
Dec 199902,53824.282.42$6,151
Nov 199902,81923.192.43$6,861
Oct 199903,40520.982.80$9,547
Sep 199902,61321.752.62$6,843
Aug 199903,47619.262.88$9,996
Jul 199903,56417.892.37$8,455
Jun 199902,82015.942.36$6,661
May 199904,45915.792.32$10,349
Apr 199907,35215.102.21$16,234
Mar 199902,74312.471.84$5,043
Feb 199907089.981.82$1,287
Jan 1999075910.381.90$1,442
Dec 199804,1999.201.77$7,446
Nov 19980010.892.19$0
Oct 1998062212.421.97$1,225
Sep 1998026112.592.08$544
Aug 1998035011.301.91$668
Jul 199801,42411.742.24$3,186
Jun 199802,21011.242.24$4,944
May 199809,88512.622.21$21,810
Apr 1998072013.042.51$1,804
Mar 19980012.802.31$0
Feb 19980013.952.30$0
Jan 19980014.702.15$0
Dec 19970016.322.41$0
Nov 19970018.193.09$0
Oct 19970019.253.15$0
Sep 19970017.742.95$0
Aug 19970017.862.55$0
Jul 19971017.582.25$18
Jun 19976017.242.26$103
May 199719118.972.31$363
Apr 1997193,60017.882.08$7,838
Mar 1997245,71118.951.94$11,529
Feb 1997215,74820.492.21$13,110
Jan 1997175,71323.483.54$20,621
Dec 1996136,45623.32$303
Nov 1996126,39621.97$264
Oct 1996147,18123.31$326
Sep 1996136,96422.22$289
Aug 1996126,29220.26$243
Jul 1996167,43819.55$313
Jun 1996327,30618.73$599
May 1996418,62719.43$797
Apr 1996408,62321.51$860
Mar 1996356,58019.38$678
Feb 1996356,64516.98$594
Jan 1996568,64017.07$956
Dec 1995599,74117.19$1,014
Nov 1995433,81116.00$688
Oct 1995539,66915.43$818
Sep 19955710,15116.18$922
Aug 1995459,66915.92$716
Jul 1995182,74915.24$274
Jun 1995434,19016.41$706
May 1995608,43017.56$1,054
Apr 1995499,98417.73$869
Mar 19954910,91816.44$806
Feb 19954511,10816.58$746
Jan 19954312,53015.92$685
Dec 19944514,47215.03$676
Nov 1994327,58515.90$509
Oct 1994182,04715.58$280
Sep 19944311,67815.29$657
Aug 19945215,53616.13$839
Jul 19949311,20617.56$1,633
Jun 19941097,58717.09$1,863
May 19949915,47315.88$1,572
Apr 1994747,56414.14$1,046
Mar 19948710,21112.46$1,084
Feb 19949514,80112.50$1,188
Jan 199411219,87512.66$1,418
Dec 199310919,49012.33$1,344
Nov 199310222,14614.49$1,478
Oct 19939327,47615.85$1,474
Sep 19939433,43815.03$1,413
Aug 19938424,34715.66$1,315
Jul 199312920,38315.46$1,994
Jun 199311221,75416.79$1,880
May 199314624,77417.68$2,581
Apr 199314630,19818.05$2,635
Mar 199318828,74918.14$3,410
Feb 199313331,78417.90$2,381
Jan 19938814,64216.93$1,490

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2002 — as filed, then multipliedworked
Condensate             0 bbl  × $ 22.00 =         $0
Gas                   97 Mcf  × $  3.10 =       $301

────────────────────────────────────────────────────
Month total                                     $301

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/144021 is the state's own key, not one this site invented.