SHARTLE, THOMAS H.

Operated by KAISER-FRANCIS OIL COMPANY (P-5 450175) in the WHITE OAK CREEK (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 145475District 06Field 969706002 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.1 M
Feb 1993 – Jun 2018
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
305
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 148 leases and 148 wells, and the rule below applies to all of them.

Discovered
1978-05-08
as the register files it
Field class
Gas
the register's own label
Between wells
1,867 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 160 acres. The field rule took effect on 1990-05-07.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED ADMINISTRATIVELY EFF. 9-1-95.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111993-12-22127115
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,522 bbl$67,868
GasProduction383,758 Mcf$1,053,358
Total$1,121,226

126,615 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6545, -95.1367. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.65450, -95.13669 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,800 ft
1 wells filed one
Completion to plug
12.9 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,800 ft.

Completions filed
Jan 2005
1 of 1 wells
Plug dates filed
Dec 2017
1 of 1 wells

Last completion to plug: a median of 12.9 years across the 1 well that filed both dates, with the middle half between 12.9 years and 12.9 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-073308022-L10,800 ftJan 2005Dec 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (305)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

305 months

Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 2018556163.842.90$3,688
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 201506538.792.17$141
Oct 20150043.552.43$0
Sep 201507442.992.76$204
Aug 20150040.162.87$0
Jul 2015021648.152.95$636
Jun 2015026656.152.88$767
May 2015021855.212.96$644
Apr 2015011549.822.71$311
Mar 2015021342.892.93$625
Feb 2015045344.662.98$1,348
Jan 2015048643.433.10$1,507
Dec 2014044354.693.59$1,591
Nov 2014044770.464.25$1,901
Oct 2014045278.303.90$1,763
Sep 2014043186.164.05$1,744
Aug 2014045389.394.04$1,828
Jul 2014048296.564.18$2,015
Jun 2014048098.164.74$2,274
May 2014052294.734.73$2,467
Apr 2014013195.944.81$630
Mar 2014034295.895.06$1,729
Feb 2014043097.406.19$2,663
Jan 2014023090.404.86$1,118
Dec 201309491.824.35$409
Nov 2013033388.853.74$1,245
Oct 2013046997.423.78$1,773
Sep 20130455104.113.72$1,692
Aug 20130474104.253.52$1,670
Jul 20130476102.523.72$1,770
Jun 2013047094.403.93$1,849
May 2013048394.834.15$2,004
Apr 2013047093.964.28$2,013
Mar 2013049393.623.91$1,929
Feb 2013044891.233.42$1,532
Jan 2013051191.603.42$1,748
Dec 2012029086.773.42$992
Nov 2012047686.953.62$1,725
Oct 2012049989.383.40$1,696
Sep 2012049694.672.92$1,448
Aug 2012051992.662.91$1,509
Jul 2012046085.133.02$1,390
Jun 2012047679.822.52$1,199
May 2012049791.612.49$1,237
Apr 20120402101.652.00$803
Mar 20120508105.052.22$1,129
Feb 2012182480101.102.57$19,634
Jan 2012051698.092.73$1,411
Dec 2011051396.873.24$1,662
Nov 2011050695.723.31$1,676
Oct 2011051684.983.65$1,883
Sep 2011038083.623.99$1,515
Aug 2011047683.404.15$1,975
Jul 2011048594.144.52$2,191
Jun 2011045992.904.64$2,130
May 2011048298.134.40$2,123
Apr 20110472105.964.33$2,045
Mar 2011048896.364.06$1,980
Feb 2011041285.644.18$1,722
Jan 2011046886.504.59$2,148
Dec 2010049385.734.35$2,143
Nov 2010048280.843.80$1,829
Oct 2010050678.103.51$1,776
Sep 2010049972.633.98$1,986
Aug 2010050873.684.42$2,245
Jul 2010051372.554.74$2,430
Jun 2010050570.364.91$2,480
May 2010052371.124.24$2,215
Apr 2010050481.694.12$2,078
Mar 2010051378.394.39$2,251
Feb 2010045173.585.44$2,455
Jan 2010049874.365.96$2,970
Dec 2009050471.445.48$2,764
Nov 2009049774.593.75$1,865
Oct 2009054872.544.11$2,252
Sep 2009052865.543.06$1,618
Aug 2009055467.423.22$1,783
Jul 2009055461.133.46$1,919
Jun 2009053966.163.90$2,099
May 2009056354.743.93$2,210
Apr 2009055146.773.59$1,977
Mar 2009056142.144.06$2,277
Feb 2009050932.814.63$2,358
Jan 2009056935.865.37$3,056
Dec 2008053337.105.98$3,186
Nov 2008058355.496.86$4,000
Oct 2008059275.246.92$4,098
Sep 20080592101.767.88$4,663
Aug 20080576114.228.48$4,886
Jul 20080529131.0811.39$6,025
Jun 20080217131.3313.03$2,828
May 20080364123.1711.57$4,213
Apr 20080600110.3110.45$6,273
Mar 20080594101.909.66$5,740
Feb 2008043292.538.77$3,789
Jan 2008093990.388.21$7,705
Dec 200701,00688.337.30$7,346
Nov 2007096991.677.29$7,066
Oct 200701,07182.856.92$7,413
Sep 200701,04575.846.24$6,525
Aug 200701,09069.066.39$6,963
Jul 200701,01970.906.39$6,509
Jun 2007078262.007.55$5,903
May 2007099558.747.85$7,807
Apr 2007070959.617.81$5,534
Mar 2007065156.927.30$4,754
Feb 200701,07855.108.22$8,857
Jan 200701,07050.306.73$7,198
Dec 200601,29956.656.92$8,987
Nov 200601,22754.207.62$9,347
Oct 2006066654.906.01$4,005
Sep 2006065560.085.04$3,299
Aug 2006057668.717.34$4,228
Jul 2006097369.376.34$6,172
Jun 2006094366.286.38$6,020
May 200601,17366.016.42$7,537
Apr 200601,03364.397.36$7,603
Mar 200601,15056.707.08$8,145
Feb 2006085957.597.75$6,658
Jan 2006057460.598.93$5,128
Dec 2005055554.9413.42$7,446
Nov 2005041554.6910.59$4,394
Oct 2005048658.3413.80$6,705
Sep 2005038161.4512.08$4,602
Aug 2005040661.519.80$3,978
Jul 2005054655.697.84$4,283
Jun 2005040752.337.38$3,004
May 2005035245.226.65$2,341
Apr 2005040949.207.36$3,010
Mar 2005069850.377.15$4,994
Feb 2005088145.226.31$5,561
Jan 2005084243.166.32$5,323
Dec 2004034239.866.75$2,309
Nov 2004099745.286.33$6,311
Oct 2004054349.706.52$3,538
Sep 200401,50643.245.28$7,958
Aug 200401,10142.375.55$6,111
Jul 200401,33538.286.08$8,122
Jun 200401,57136.106.43$10,106
May 200401,52037.486.49$9,872
Apr 200401,02434.475.86$5,999
Mar 200401,73634.365.53$9,600
Feb 200401,53232.455.51$8,441
Jan 200401,06032.036.30$6,678
Dec 200301,11330.266.30$7,014
Nov 2003078828.804.60$3,621
Oct 2003093528.174.76$4,450
Sep 2003073626.314.75$3,496
Aug 2003059629.765.13$3,057
Jul 200301,10829.415.17$5,729
Jun 200301,01828.565.98$6,091
May 200302,45526.595.97$14,663
Apr 20031851,86026.675.41$14,991
Mar 200302,27531.146.10$13,868
Feb 200302,03733.487.93$16,145
Jan 200302,04130.315.58$11,393
Dec 20021842,43226.914.85$16,756
Nov 200202,44024.664.14$10,094
Oct 200202,69426.464.23$11,393
Sep 200202,35627.443.64$8,565
Aug 200202,70625.963.16$8,562
Jul 200202,11524.583.06$6,476
Jun 200202,46523.733.34$8,229
May 200202,32524.663.58$8,333
Apr 20021832,54523.653.51$13,267
Mar 200202,72222.003.10$8,446
Feb 200202,32118.222.38$5,514
Jan 200202,71517.172.38$6,450
Dec 200102,34716.932.36$5,549
Nov 200102,89618.072.41$6,966
Oct 200102,45119.782.53$6,198
Sep 200101,60024.262.25$3,602
Aug 200102,39924.873.05$7,325
Jul 200102,14923.933.20$6,871
Jun 200101,86824.563.82$7,144
May 200101,56025.524.31$6,719
Apr 200101,30724.685.34$6,973
Mar 20011881,53724.545.38$12,877
Feb 200101,29427.755.77$7,463
Jan 200101,28227.478.40$10,767
Dec 200001,74526.889.12$15,919
Nov 200001,13732.215.66$6,433
Oct 200001,01831.235.15$5,238
Sep 200001,01431.875.19$5,259
Aug 200001,53629.644.54$6,975
Jul 200001,19828.534.09$4,900
Jun 200001,50229.304.40$6,605
May 200001,43127.263.68$5,266
Apr 200001,61724.513.12$5,039
Mar 200001,66228.422.86$4,753
Feb 200001,45527.622.73$3,967
Jan 20001891,67425.272.48$8,928
Dec 199901,75824.282.42$4,261
Nov 199901,94323.192.43$4,729
Oct 199901,91220.982.80$5,361
Sep 199902,06021.752.62$5,395
Aug 199902,46019.262.88$7,074
Jul 199901,77617.892.37$4,213
Jun 199902,15115.942.36$5,081
May 19991901,74715.792.32$7,055
Apr 199902,35115.102.21$5,191
Mar 199902,44612.471.84$4,497
Feb 199902,4399.981.82$4,434
Jan 199902,26410.381.90$4,301
Dec 199802,5899.201.77$4,591
Nov 199802,29510.892.19$5,016
Oct 19981922,29612.421.97$6,906
Sep 199802,62712.592.08$5,471
Aug 199802,87611.301.91$5,486
Jul 199802,92711.742.24$6,548
Jun 199803,00311.242.24$6,719
May 19981902,21112.622.21$7,276
Apr 199802,57813.042.51$6,459
Mar 199802,44212.802.31$5,640
Feb 199802,38413.952.30$5,481
Jan 199802,22314.702.15$4,790
Dec 199701,91716.322.41$4,622
Nov 199701,55518.193.09$4,802
Oct 19971941,60919.253.15$8,803
Sep 199701,07217.742.95$3,168
Aug 199703,11817.862.55$7,966
Jul 199703,51817.582.25$7,905
Jun 19971943,30417.242.26$10,802
May 199702,70918.972.31$6,254
Apr 19971923,22817.882.08$10,156
Mar 199702,73618.951.94$5,305
Feb 199702,30620.492.21$5,087
Jan 199702,09323.483.54$7,409
Dec 199602,08223.32$0
Nov 199601,88521.97$0
Oct 199602,28823.31$0
Sep 199602,40622.22$0
Aug 19961801,85420.26$3,647
Jul 199601,96119.55$0
Jun 199602,32918.73$0
May 199602,38919.43$0
Apr 199602,36921.51$0
Mar 199602,80019.38$0
Feb 1996087216.98$0
Jan 199601,09017.07$0
Dec 1995242,77617.19$413
Nov 199502,64916.00$0
Oct 199502,56915.43$0
Sep 199502,36016.18$0
Aug 199502,74015.92$0
Jul 199502,08015.24$0
Jun 199502,11916.41$0
May 199501,81817.56$0
Apr 1995081917.73$0
Mar 19950016.44$0
Feb 1995036216.58$0
Jan 1995037715.92$0
Dec 1994014915.03$0
Nov 199401,29315.90$0
Oct 199401,70715.58$0
Sep 199403,95615.29$0
Aug 199402,78216.13$0
Jul 199403,20517.56$0
Jun 199402,61817.09$0
May 199403,18215.88$0
Apr 199403,41814.14$0
Mar 199404,47912.46$0
Feb 199405,89612.50$0
Jan 199405,31112.66$0
Dec 199303,07612.33$0
Nov 199302,84114.49$0
Oct 199303,19915.85$0
Sep 199303,37815.03$0
Aug 199304,28515.66$0
Jul 199304,54415.46$0
Jun 199304,49616.79$0
May 199305,90117.68$0
Apr 199303,95218.05$0
Mar 199307,95318.14$0
Feb 19930017.90$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2018 — as filed, then multipliedworked
Condensate            55 bbl  × $ 63.84 =     $3,511
Gas                   61 Mcf  × $  2.90 =       $177

────────────────────────────────────────────────────
Month total                                   $3,688

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/145475 is the state's own key, not one this site invented.