Operated by CLEMONS, TONY W. (P-5 160442) in the WOODLAWN (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 145621District 06Field 985630832 tax incentive programmesCondensateGasSaveExport
Value, all time
$561 k
Mar 1993 – Nov 2013
Value, last 12 filed months
$0
at the published price for each month
Months reported
249
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 368 leases and 368 wells, and the rule below applies to all of them.

Discovered
1965-01-10
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2010-11-02.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111993-10-09128196
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,067 bbl$50,033
GasProduction445,853 Mcf$510,736
Total$560,769

277,645 Mcf of this lease's gas, across 45 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.6340, -94.3675. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.63401, -94.36750 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,010 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,010 ft.

Completions filed
May 2015
1 of 1 wells

1 well

42-20332191210,010 ftMay 2015Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (249)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

249 months

Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 20121620101.102.57$16,378
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 200501458.3413.80$193
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 2003016430.315.58$915
Dec 2002016326.914.85$791
Nov 2002065124.664.14$2,693
Oct 200201,37626.464.23$5,819
Sep 200201,56627.443.64$5,693
Aug 200201,64025.963.16$5,189
Jul 200201,54224.583.06$4,721
Jun 200202,15023.733.34$7,177
May 200202,40824.663.58$8,630
Apr 200202,26623.653.51$7,959
Mar 200211,91122.003.10$5,951
Feb 200211,71718.222.38$4,097
Jan 200202,00117.172.38$4,754
Dec 200102,30916.932.36$5,459
Nov 200102,36818.072.41$5,696
Oct 20011582,46919.782.53$9,369
Sep 200112,82624.262.25$6,386
Aug 200103,51624.873.05$10,735
Jul 200102,69923.933.20$8,629
Jun 200102,38424.563.82$9,117
May 200113,04925.524.31$13,159
Apr 20010124.685.34$5
Mar 200101,83824.545.38$9,882
Feb 200101,91527.755.77$11,044
Jan 200102,63727.478.40$22,148
Dec 200002,22226.889.12$20,270
Nov 200001,73432.215.66$9,811
Oct 200001,94431.235.15$10,003
Sep 200012,32031.875.19$12,065
Aug 200002,12529.644.54$9,649
Jul 20001502,36528.534.09$13,952
Jun 200002,21329.304.40$9,731
May 200002,21927.263.68$8,165
Apr 200012,58824.513.12$8,089
Mar 200032,49028.422.86$7,206
Feb 200012,53427.622.73$6,937
Jan 200012,31225.272.48$5,760
Dec 199902,36124.282.42$5,722
Nov 199912,24823.192.43$5,495
Oct 199922,96720.982.80$8,361
Sep 199912,66921.752.62$7,011
Aug 199943,31119.262.88$9,598
Jul 199933,25117.892.37$7,766
Jun 199902,03315.942.36$4,802
May 199901,52615.792.32$3,542
Apr 19991632,61315.102.21$8,231
Mar 199912,26012.471.84$4,167
Feb 199912,5329.981.82$4,613
Jan 199903,01410.381.90$5,726
Dec 199822,8769.201.77$5,118
Nov 199802,31010.892.19$5,049
Oct 199802,78712.421.97$5,488
Sep 199812,40512.592.08$5,021
Aug 199822,99411.301.91$5,733
Jul 199813,09711.742.24$6,941
Jun 199823,18111.242.24$7,139
May 199822,46112.622.21$5,455
Apr 199822,57213.042.51$6,470
Mar 199812,82512.802.31$6,537
Feb 199812,42713.952.30$5,594
Jan 199822,85514.702.15$6,181
Dec 19971792,74216.322.41$9,533
Nov 199702,61818.193.09$8,085
Oct 199712,84419.253.15$8,977
Sep 199712,65817.742.95$7,872
Aug 199702,26017.862.55$5,774
Jul 199712,92117.582.25$6,581
Jun 199702,05617.242.26$4,641
May 199711,36018.972.31$3,159
Apr 199722,16617.882.08$4,547
Mar 199712,76818.951.94$5,386
Feb 199712,69620.492.21$5,968
Jan 199712,89823.483.54$10,282
Dec 199603,16223.32$0
Nov 19961643,62621.97$3,603
Oct 199603,11723.31$0
Sep 199613,69022.22$22
Aug 199603,69520.26$0
Jul 199614,93919.55$20
Jun 199616,19718.73$19
May 1996112,74319.43$214
Apr 1996669621.51$129
Mar 199622,60219.38$39
Feb 199673,75716.98$119
Jan 19961283,57117.07$2,185
Dec 199524,37017.19$34
Nov 199533,08516.00$48
Oct 199533,44015.43$46
Sep 199523,50816.18$32
Aug 19951814,54715.92$2,882
Jul 199524,83115.24$30
Jun 199504,68816.41$0
May 199505,05317.56$0
Apr 199505,12217.73$0
Mar 199505,35716.44$0
Feb 199504,88816.58$0
Jan 19951775,36615.92$2,818
Dec 199415,72415.03$15
Nov 199435,81015.90$48
Oct 199445,95515.58$62
Sep 199446,00715.29$61
Aug 199425,83516.13$32
Jul 199436,35317.56$53
Jun 199436,19117.09$51
May 199417,17715.88$16
Apr 1994226,37914.14$311
Mar 199406,35512.46$0
Feb 199407,43712.50$0
Jan 199408,39712.66$0
Dec 19931489,82312.33$1,825
Nov 1993010,54314.49$0
Oct 1993011,23015.85$0
Sep 1993013,83715.03$0
Aug 199315811,48115.66$2,474
Jul 1993012,12215.46$0
Jun 199316613,88716.79$2,787
May 1993019,48117.68$0
Apr 199301,57118.05$0
Mar 19930018.14$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2012 — as filed, then multipliedworked
Condensate           162 bbl  × $101.10 =    $16,378
Gas                    0 Mcf  × $  2.57 =         $0

────────────────────────────────────────────────────
Month total                                  $16,378

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/145621 is the state's own key, not one this site invented.