CGU 24

Operated by ANADARKO E&P COMPANY LP (P-5 20542) in the CARTHAGE (TRAVIS PEAK-SMITH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 146802District 06Field 16032905GasSaveExport
Value, all time
$330 k
Aug 1993 – Jul 2004
Value, last 12 filed months
$23 k
at the published price for each month
Months reported
132
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 18 leases and 18 wells, and the rule below applies to all of them.

Discovered
1990-04-15
as the register files it
Field class
Oil and gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AND AOF2 EFFECTIVE 1-1-96.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction297,291 Mcf$330,361
Total$330,361

199,045 Mcf of this lease's gas, across 41 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2126, -94.4315. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.21258, -94.43153 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,775 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,775 ft.

Completions filed
Jul 2004
1 of 1 wells

1 well

42-365328097-C9,775 ftJul 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (132)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

132 months

Jul 2004038.286.08$0
Jun 2004036.106.43$0
May 2004037.486.49$0
Apr 2004034.475.86$0
Mar 2004034.365.53$0
Feb 20048332.455.51$457
Jan 200459032.036.30$3,717
Dec 200368330.266.30$4,304
Nov 200372828.804.60$3,345
Oct 200374428.174.76$3,541
Sep 200374326.314.75$3,529
Aug 200385929.765.13$4,406
Jul 200359329.415.17$3,066
Jun 200342128.565.98$2,519
May 200364226.595.97$3,834
Apr 200378826.675.41$4,261
Mar 200387131.146.10$5,310
Feb 200388233.487.93$6,991
Jan 200386830.315.58$4,845
Dec 200285826.914.85$4,165
Nov 200293324.664.14$3,860
Oct 200294026.464.23$3,975
Sep 20021,07127.443.64$3,893
Aug 20021,22025.963.16$3,860
Jul 200256624.583.06$1,733
Jun 200259323.733.34$1,980
May 20021,02424.663.58$3,670
Apr 200273623.653.51$2,585
Mar 20021,07122.003.10$3,323
Feb 200298418.222.38$2,338
Jan 20021,16217.172.38$2,761
Dec 20011,54516.932.36$3,653
Nov 200189818.072.41$2,160
Oct 2001019.782.53$0
Sep 200156924.262.25$1,281
Aug 20011,26624.873.05$3,865
Jul 20011,28223.933.20$4,099
Jun 20011,38024.563.82$5,277
May 20011,51625.524.31$6,530
Apr 20011,46224.685.34$7,800
Mar 20011,53624.545.38$8,258
Feb 20011,65327.755.77$9,533
Jan 20012,11927.478.40$17,797
Dec 200047626.889.12$4,342
Nov 20001,02332.215.66$5,788
Oct 20001,13231.235.15$5,825
Sep 200084231.875.19$4,367
Aug 200073029.644.54$3,315
Jul 200084028.534.09$3,435
Jun 200084029.304.40$3,694
May 200086027.263.68$3,165
Apr 200083524.513.12$2,602
Mar 200077028.422.86$2,202
Feb 2000027.622.73$0
Jan 200091225.272.48$2,262
Dec 199979224.282.42$1,920
Nov 199999323.192.43$2,417
Oct 199987420.982.80$2,450
Sep 199984421.752.62$2,210
Aug 19991,08219.262.88$3,111
Jul 199991617.892.37$2,173
Jun 199993215.942.36$2,201
May 199992115.792.32$2,138
Apr 19991,01415.102.21$2,239
Mar 199992512.471.84$1,700
Feb 19991,1539.981.82$2,096
Jan 19991,03910.381.90$1,974
Dec 19981,5519.201.77$2,750
Nov 19981,33410.892.19$2,916
Oct 19981,91112.421.97$3,763
Sep 199878612.592.08$1,637
Aug 19981,56311.301.91$2,981
Jul 199861211.742.24$1,369
Jun 199878611.242.24$1,758
May 19981,45912.622.21$3,219
Apr 19981,32513.042.51$3,320
Mar 19981,55412.802.31$3,589
Feb 19981,36413.952.30$3,136
Jan 19981,88814.702.15$4,068
Dec 19972,16116.322.41$5,210
Nov 19971,54418.193.09$4,768
Oct 19971,63019.253.15$5,134
Sep 19971,61317.742.95$4,766
Aug 19971,33317.862.55$3,405
Jul 19971,89317.582.25$4,253
Jun 19972,00217.242.26$4,519
May 19971,91118.972.31$4,412
Apr 19972,20417.882.08$4,590
Mar 19972,07318.951.94$4,020
Feb 19973,44420.492.21$7,597
Jan 19973,68123.483.54$13,030
Dec 19963,52623.32$0
Nov 19963,61521.97$0
Oct 19963,20623.31$0
Sep 19961,86322.22$0
Aug 19961,12820.26$0
Jul 19961,78219.55$0
Jun 19961,92818.73$0
May 19961,75219.43$0
Apr 19962,58821.51$0
Mar 19962,61519.38$0
Feb 19962,86116.98$0
Jan 19963,51417.07$0
Dec 19952,96017.19$0
Nov 19952,95216.00$0
Oct 19953,20915.43$0
Sep 19951,63616.18$0
Aug 19952,63315.92$0
Jul 19952,22115.24$0
Jun 19952,34316.41$0
May 19953,44917.56$0
Apr 19953,97217.73$0
Mar 19954,41216.44$0
Feb 19954,11616.58$0
Jan 19954,33415.92$0
Dec 19943,96415.03$0
Nov 19944,53515.90$0
Oct 19945,05715.58$0
Sep 19946,14415.29$0
Aug 19945,77416.13$0
Jul 19947,22317.56$0
Jun 19947,76817.09$0
May 19945,41215.88$0
Apr 19948,62414.14$0
Mar 19949,69712.46$0
Feb 19946,81412.50$0
Jan 19949,97612.66$0
Dec 199311,31612.33$0
Nov 199313,40914.49$0
Oct 199318,29215.85$0
Sep 19936,03315.03$0
Aug 199339215.66$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2004 — as filed, then multipliedworked
Gas                   83 Mcf  × $  5.51 =       $457

────────────────────────────────────────────────────
Month total                                     $457

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/146802 is the state's own key, not one this site invented.