THOMPSON, PERRY GU

Operated by VERADO ENERGY, INC. (P-5 884563) in the OAK HILL (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 149618District 06Field 664612752 tax incentive programmesCondensateGasSaveExport
Value, all time
$3.1 M
Mar 1994 – Jun 2021
Value, last 12 filed months
$58 k
at the published price for each month
Months reported
328
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 2,275 leases and 2,276 wells, and the rule below applies to all of them.

Discovered
1976-11-17
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2018-03-20.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111994-07-18129972
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,253 bbl$55,136
GasProduction1,600,914 Mcf$3,055,155
Total$3,110,291

811,890 Mcf of this lease's gas, across 34 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.3027, -94.6801. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.30269, -94.68009 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,617 ft
1 wells filed one
Completion to plug
27.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,617 ft.

Completions filed
Mar 1994
1 of 1 wells
Plug dates filed
Jun 2021
1 of 1 wells

Last completion to plug: a median of 27.3 years across the 1 well that filed both dates, with the middle half between 27.3 years and 27.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-40132374510,617 ftMar 1994Jun 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (328)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

328 months

Jun 2021020669.493.38$696
May 202101,93363.483.02$5,833
Apr 2021101,83560.362.76$5,665
Mar 202101,95361.302.72$5,306
Feb 202101,79757.805.55$9,970
Jan 2021111,95350.412.81$6,043
Dec 202001,75044.642.68$4,682
Nov 202052,36638.772.71$6,598
Oct 202002,00236.972.48$4,962
Sep 202011,48037.091.99$2,984
Aug 202011,34639.982.39$3,250
Jul 2020189138.371.83$1,665
Jun 2020067634.901.69$1,143
May 2020063616.921.81$1,154
Apr 2020060414.751.80$1,090
Mar 2020032330.341.86$600
Feb 2020035449.881.98$701
Jan 2020034257.252.09$716
Dec 2019043759.012.30$1,007
Nov 2019068255.302.75$1,876
Oct 201901,03753.472.42$2,508
Sep 2019048655.052.66$1,291
Aug 2019060453.112.30$1,392
Jul 2019060056.272.46$1,476
Jun 2019171252.782.49$1,827
May 2019054358.482.74$1,488
Apr 2019032262.632.75$886
Mar 2019036056.803.06$1,102
Feb 2019032950.852.79$919
Jan 2019040746.033.23$1,314
Dec 201801,53746.594.19$6,433
Nov 201801,00452.934.24$4,254
Oct 2018161,29661.443.40$5,387
Sep 201801,72859.543.11$5,371
Aug 201801,49959.403.07$4,597
Jul 201801,04165.142.93$3,052
Jun 201801,15160.183.08$3,542
May 201801,60465.382.90$4,653
Apr 201801,50263.842.90$4,357
Mar 201871,46661.222.79$4,514
Feb 201801,61061.782.77$4,453
Jan 201801,35862.874.01$5,445
Dec 201701,76557.272.92$5,156
Nov 201701,22755.423.12$3,826
Oct 201701,19549.292.98$3,566
Sep 201701,30347.523.09$4,023
Aug 201701,21345.373.00$3,644
Jul 201701,40843.873.09$4,347
Jun 201701,46742.493.09$4,529
May 201701,21145.373.26$3,952
Apr 201701,17647.933.21$3,777
Mar 201701,51846.772.98$4,529
Feb 201701,36850.452.95$4,039
Jan 201701,14949.413.42$3,928
Dec 201601,24648.763.72$4,639
Nov 201601,19742.492.64$3,165
Oct 201601,57446.193.09$4,864
Sep 201601,44141.553.10$4,468
Aug 201601,47041.442.92$4,299
Jul 201601,00341.622.92$2,933
Jun 201601,32345.352.69$3,553
May 201601,49042.521.99$2,967
Apr 201601,13536.561.99$2,260
Mar 201601,55133.011.79$2,783
Feb 201601,64826.472.06$3,401
Jan 201601,74927.352.36$4,135
Dec 201501,38732.362.00$2,776
Nov 201501,80038.792.17$3,901
Oct 201502,12043.552.43$5,144
Sep 201511,81242.992.76$5,041
Aug 201511,86640.162.87$5,400
Jul 201502,39348.152.95$7,048
Jun 201501,83756.152.88$5,296
May 201521,92755.212.96$5,806
Apr 201501,56949.822.71$4,247
Mar 201501,75842.892.93$5,159
Feb 201511,27144.662.98$3,827
Jan 201501,33443.433.10$4,136
Dec 201411,55954.693.59$5,654
Nov 201411,50670.464.25$6,474
Oct 201401,74178.303.90$6,792
Sep 201401,59586.164.05$6,452
Aug 201411,93089.394.04$7,877
Jul 201411,63196.564.18$6,913
Jun 2014033398.164.74$1,577
May 2014035894.734.73$1,692
Apr 2014074495.944.81$3,578
Mar 2014046695.895.06$2,356
Feb 2014058897.406.19$3,641
Jan 2014055490.404.86$2,693
Dec 2013052991.824.35$2,304
Nov 2013049688.853.74$1,854
Oct 2013040697.423.78$1,534
Sep 20130435104.113.72$1,617
Aug 20130511104.253.52$1,800
Jul 20130675102.523.72$2,509
Jun 2013062594.403.93$2,458
May 2013017594.834.15$726
Apr 2013567293.964.28$3,348
Mar 2013065693.623.91$2,567
Feb 2013059891.233.42$2,045
Jan 2013037291.603.42$1,272
Dec 2012075086.773.42$2,565
Nov 2012057486.953.62$2,081
Oct 2012063789.383.40$2,166
Sep 201201,01094.672.92$2,948
Aug 2012054192.662.91$1,573
Jul 2012089785.133.02$2,710
Jun 2012068479.822.52$1,723
May 20121075791.612.49$2,800
Apr 20127771101.652.00$2,251
Mar 20120612105.052.22$1,360
Feb 20120674101.102.57$1,732
Jan 2012050598.092.73$1,381
Dec 2011159296.873.24$2,015
Nov 2011073095.723.31$2,417
Oct 201101,08384.983.65$3,951
Sep 2011070983.623.99$2,826
Aug 2011069483.404.15$2,880
Jul 2011171894.144.52$3,338
Jun 2011469392.904.64$3,587
May 2011079298.134.40$3,489
Apr 201101,166105.964.33$5,053
Mar 2011071396.364.06$2,893
Feb 201101,22085.644.18$5,100
Jan 201111,12486.504.59$5,244
Dec 2010083685.734.35$3,635
Nov 2010023080.843.80$873
Oct 201001,34778.103.51$4,726
Sep 2010154272.633.98$2,230
Aug 2010051473.684.42$2,272
Jul 2010088672.554.74$4,197
Jun 2010039870.364.91$1,954
May 2010037471.124.24$1,584
Apr 2010037981.694.12$1,563
Mar 2010434978.394.39$1,845
Feb 2010030573.585.44$1,660
Jan 2010038374.365.96$2,284
Dec 2009233971.445.48$2,002
Nov 2009019174.593.75$717
Oct 2009056472.544.11$2,318
Sep 2009038065.543.06$1,165
Aug 2009042467.423.22$1,365
Jul 2009056261.133.46$1,947
Jun 200951,26766.163.90$5,266
May 2009061354.743.93$2,406
Apr 2009085446.773.59$3,064
Mar 2009092442.144.06$3,751
Feb 2009089332.814.63$4,137
Jan 200901,18735.865.37$6,375
Dec 200801,19837.105.98$7,161
Nov 2008258355.496.86$4,111
Oct 2008079375.246.92$5,489
Sep 200801,463101.767.88$11,524
Aug 20080747114.228.48$6,337
Jul 2008111,206131.0811.39$15,178
Jun 200802,627131.3313.03$34,237
May 20080827123.1711.57$9,572
Apr 200801,016110.3110.45$10,622
Mar 20083986101.909.66$9,834
Feb 200801,01292.538.77$8,876
Jan 2008070890.388.21$5,810
Dec 2007586188.337.30$6,729
Nov 2007579091.677.29$6,219
Oct 2007086182.856.92$5,960
Sep 200701,07975.846.24$6,737
Aug 200701,00869.066.39$6,439
Jul 200701,35370.906.39$8,643
Jun 2007026362.007.55$1,985
May 200706258.747.85$486
Apr 2007010959.617.81$851
Mar 2007050156.927.30$3,658
Feb 20071527955.108.22$3,119
Jan 20071351550.306.73$4,118
Dec 2006877356.656.92$5,801
Nov 20061949754.207.62$4,816
Oct 2006284754.906.01$5,203
Sep 2006238460.085.04$2,054
Aug 2006063868.717.34$4,683
Jul 20061587969.376.34$6,616
Jun 2006557966.286.38$4,028
May 2006075166.016.42$4,825
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 2006013557.597.75$1,046
Jan 2006106560.598.93$1,187
Dec 2005065054.9413.42$8,720
Nov 2005131054.6910.59$3,337
Oct 2005091458.3413.80$12,609
Sep 200501,54461.4512.08$18,650
Aug 200592,24061.519.80$22,499
Jul 200502,77155.697.84$21,735
Jun 2005286052.337.38$6,452
May 200502,00145.226.65$13,309
Apr 200501,50949.207.36$11,107
Mar 200501,09550.377.15$7,835
Feb 200551,27945.226.31$8,299
Jan 2005020743.166.32$1,309
Dec 2004040339.866.75$2,721
Nov 200401,16045.286.33$7,343
Oct 200401,38149.706.52$8,997
Sep 200401,44943.245.28$7,656
Aug 200402,06242.375.55$11,445
Jul 200462,12438.286.08$13,152
Jun 200402,29136.106.43$14,738
May 200402,50737.486.49$16,282
Apr 2004134,46234.475.86$26,589
Mar 200405,55434.365.53$30,714
Feb 200404,89332.455.51$26,959
Jan 200406,47332.036.30$40,778
Dec 200306,85030.266.30$43,166
Nov 2003247,16728.804.60$33,625
Oct 200306,34428.174.76$30,195
Sep 200303,95226.314.75$18,769
Aug 200304,83229.765.13$24,787
Jul 2003236,94229.415.17$36,572
Jun 200307,23228.565.98$43,269
May 200307,46126.595.97$44,562
Apr 200307,39326.675.41$39,976
Mar 2003247,46231.146.10$46,236
Feb 2003287,58133.487.93$61,024
Jan 200308,28330.315.58$46,236
Dec 2002319,65226.914.85$47,683
Nov 200207,96024.664.14$32,930
Oct 2002269,16226.464.23$39,435
Sep 200203,97927.443.64$14,464
Aug 200202,43025.963.16$7,689
Jul 200202,39624.583.06$7,336
Jun 200282,30623.733.34$7,888
May 200202,50824.663.58$8,989
Apr 200282,46123.653.51$8,833
Mar 200263,00622.003.10$9,459
Feb 200202,68718.222.38$6,383
Jan 200282,62217.172.38$6,366
Dec 200102,68516.932.36$6,348
Nov 200102,37718.072.41$5,718
Oct 200193,08319.782.53$7,975
Sep 200186,49524.262.25$14,816
Aug 200103,92824.873.05$11,993
Jul 2001104,65823.933.20$15,131
Jun 200106,87324.563.82$26,283
May 2001168,26225.524.31$35,995
Apr 2001358,38224.685.34$45,584
Mar 200108,04724.545.38$43,264
Feb 2001237,96927.755.77$46,596
Jan 2001197,46427.478.40$63,210
Dec 200007,79226.889.12$71,083
Nov 20002811,62332.215.66$66,665
Oct 20001048,42931.235.15$46,619
Sep 200008,47831.875.19$43,971
Aug 2000010,87229.644.54$49,367
Jul 200003,09828.534.09$12,670
Jun 2000203,41729.304.40$15,611
May 200003,50827.263.68$12,909
Apr 200003,45524.513.12$10,766
Mar 200003,50728.422.86$10,029
Feb 200003,40527.622.73$9,284
Jan 2000233,46825.272.48$9,184
Dec 199903,55724.282.42$8,621
Nov 199904,04023.192.43$9,833
Oct 199904,19720.982.80$11,767
Sep 199904,18821.752.62$10,968
Aug 199906,72119.262.88$19,327
Jul 1999328,03617.892.37$19,637
Jun 199909,26515.942.36$21,885
May 199909,77915.792.32$22,697
Apr 1999378,29015.102.21$18,863
Mar 199905,19912.471.84$9,557
Feb 1999577,6349.981.82$14,446
Jan 19994410,06810.381.90$19,585
Dec 199808,4449.201.77$14,974
Nov 1998154,29810.892.19$9,558
Oct 199804,80612.421.97$9,464
Sep 199804,77612.592.08$9,947
Aug 1998595,41911.301.91$11,003
Jul 199807,76811.742.24$17,379
Jun 199809,45311.242.24$21,149
May 199838,87912.622.21$19,628
Apr 199808,77513.042.51$21,984
Mar 1998258,77712.802.31$20,590
Feb 199808,72313.952.30$20,055
Jan 19983410,16614.702.15$22,405
Dec 1997010,48316.322.41$25,276
Nov 1997288,64018.193.09$27,192
Oct 1997258,30719.253.15$26,647
Sep 199707,70717.742.95$22,773
Aug 199717,21517.862.55$18,450
Jul 1997010,40917.582.25$23,388
Jun 19973310,33917.242.26$23,906
May 1997268,76018.972.31$20,716
Apr 1997011,30117.882.08$23,538
Mar 19972710,19718.951.94$20,285
Feb 19975610,98020.492.21$25,368
Jan 19972710,74623.483.54$38,672
Dec 1996111,58523.32$23
Nov 199609,47921.97$0
Oct 199608,48123.31$0
Sep 1996011,66822.22$0
Aug 19968112,12720.26$1,641
Jul 19965712,96619.55$1,114
Jun 1996012,85018.73$0
May 1996014,39319.43$0
Apr 1996111,79221.51$22
Mar 19965214,02819.38$1,008
Feb 1996114,03216.98$17
Jan 19965115,02817.07$871
Dec 1995015,60017.19$0
Nov 19955016,63716.00$800
Oct 1995017,55215.43$0
Sep 1995017,22516.18$0
Aug 19955319,11215.92$844
Jul 19956319,58015.24$960
Jun 1995219,62416.41$33
May 199511622,34417.56$2,037
Apr 19956821,91517.73$1,206
Mar 19955024,81616.44$822
Feb 1995122,59716.58$17
Jan 19956727,72715.92$1,067
Dec 19945929,51015.03$887
Nov 19946430,95615.90$1,018
Oct 1994234,97315.58$31
Sep 19947836,56115.29$1,193
Aug 1994142,91616.13$16
Jul 1994446,20917.56$70
Jun 1994548,85817.09$85
May 19944258,55715.88$667
Apr 1994868,26914.14$113
Mar 19941221,92312.46$150

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2021 — as filed, then multipliedworked
Condensate             0 bbl  × $ 69.49 =         $0
Gas                  206 Mcf  × $  3.38 =       $696

────────────────────────────────────────────────────
Month total                                     $696

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/149618 is the state's own key, not one this site invented.