DELONEY "B"

Operated by EOG RESOURCES, INC. (P-5 253162) in the APPLEBY, N. (ROD-TP CONS) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 151813District 06Field 03311580CondensateGasSaveExport
Value, all time
$595 k
Sep 1994 – Jun 2012
Value, last 12 filed months
$0
at the published price for each month
Months reported
214
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 135 leases and 135 wells, and the rule below applies to all of them.

Discovered
2009-04-14
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2009-04-14.

The Commission's schedule remark for this field reads: EFFECTIVE AUGUST.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,809 bbl$47,201
GasProduction299,368 Mcf$547,342
Total$594,543

125,413 Mcf of this lease's gas, across 27 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8052, -94.5385. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.80516, -94.53846 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
10,000 ft
1 wells filed one
Completion to plug
17.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,000 ft.

Completions filed
Sep 1994
1 of 1 wells
Plug dates filed
Jun 2012
1 of 1 wells

Last completion to plug: a median of 17.8 years across the 1 well that filed both dates, with the middle half between 17.8 years and 17.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-34730586110,000 ftSep 1994Jun 2012Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (214)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

214 months

Jun 20120079.822.52$0
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 200801292.538.77$105
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070691.677.29$44
Oct 20070082.856.92$0
Sep 20070575.846.24$31
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 200701162.007.55$83
May 200758058.747.85$3,407
Apr 200701959.617.81$148
Mar 20070356.927.30$22
Feb 200702955.108.22$238
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060854.207.62$61
Oct 20060054.906.01$0
Sep 20060460.085.04$20
Aug 20060068.717.34$0
Jul 2006391169.376.34$2,775
Jun 200601066.286.38$64
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060256.707.08$14
Feb 20060857.597.75$62
Jan 20060560.598.93$45
Dec 20050754.9413.42$94
Nov 20050454.6910.59$42
Oct 20050958.3413.80$124
Sep 20050561.4512.08$60
Aug 200501061.519.80$98
Jul 200501355.697.84$102
Jun 200509752.337.38$716
May 20058316045.226.65$4,817
Apr 2005014049.207.36$1,030
Mar 200507250.377.15$515
Feb 200502045.226.31$126
Jan 200501643.166.32$101
Dec 200401839.866.75$122
Nov 200402845.286.33$177
Oct 200403549.706.52$228
Sep 200406643.245.28$349
Aug 200402442.375.55$133
Jul 20041183938.286.08$4,754
Jun 200403936.106.43$251
May 200402237.486.49$143
Apr 200407434.475.86$434
Mar 200405134.365.53$282
Feb 200402432.455.51$132
Jan 200402232.036.30$139
Dec 2003011730.266.30$737
Nov 20039711728.804.60$3,331
Oct 2003015528.174.76$738
Sep 2003010126.314.75$480
Aug 2003030329.765.13$1,554
Jul 2003019729.415.17$1,019
Jun 20037016128.565.98$2,962
May 2003037826.595.97$2,258
Apr 2003044226.675.41$2,390
Mar 20034274331.146.10$5,837
Feb 200331,25833.487.93$10,071
Jan 2003551,42730.315.58$9,633
Dec 200201,74926.914.85$8,489
Nov 200201,32624.664.14$5,486
Oct 2002611,88926.464.23$9,603
Sep 2002083127.443.64$3,021
Aug 200201,66125.963.16$5,256
Jul 2002201,73724.583.06$5,810
Jun 200201,29323.733.34$4,316
May 200201,30724.663.58$4,684
Apr 200201,63923.653.51$5,757
Mar 200201,18022.003.10$3,661
Feb 200211,65518.222.38$3,950
Jan 200211,70517.172.38$4,068
Dec 200141,73016.932.36$4,158
Nov 200192,29518.072.41$5,683
Oct 2001781,12919.782.53$4,398
Sep 200101,65624.262.25$3,728
Aug 200101,93624.873.05$5,911
Jul 2001971,53823.933.20$7,238
Jun 200102,00824.563.82$7,679
May 200101,74425.524.31$7,512
Apr 200101,84424.685.34$9,838
Mar 200101,22724.545.38$6,597
Feb 200102,04627.755.77$11,799
Jan 200101,70927.478.40$14,353
Dec 200001,82226.889.12$16,621
Nov 200001,77532.215.66$10,043
Oct 200001,58631.235.15$8,161
Sep 200001,78531.875.19$9,258
Aug 200001,54129.644.54$6,997
Jul 200002,06228.534.09$8,433
Jun 200002,04029.304.40$8,970
May 200001,92027.263.68$7,065
Apr 200001,90724.513.12$5,942
Mar 200002,22328.422.86$6,357
Feb 200002,00327.622.73$5,461
Jan 20001782,06425.272.48$9,618
Dec 199902,32424.282.42$5,633
Nov 199902,30323.192.43$5,605
Oct 199902,42720.982.80$6,805
Sep 199902,48121.752.62$6,497
Aug 199902,77419.262.88$7,977
Jul 199902,56917.892.37$6,095
Jun 199932,67215.942.36$6,359
May 199902,93615.792.32$6,815
Apr 199903,52415.102.21$7,781
Mar 199902,01412.471.84$3,702
Feb 199911,7149.981.82$3,126
Jan 199912,79710.381.90$5,325
Dec 199832,6869.201.77$4,791
Nov 199802,83610.892.19$6,199
Oct 199802,74212.421.97$5,400
Sep 199802,88212.592.08$6,002
Aug 199803,08611.301.91$5,886
Jul 199803,66111.742.24$8,191
Jun 199803,25811.242.24$7,289
May 199803,90312.622.21$8,611
Apr 199802,88913.042.51$7,238
Mar 199803,60812.802.31$8,332
Feb 199803,53113.952.30$8,118
Jan 199804,02714.702.15$8,677
Dec 19971934,45516.322.41$13,891
Nov 199704,65718.193.09$14,382
Oct 199705,41419.253.15$17,053
Sep 199706,46117.742.95$19,091
Aug 199706,62617.862.55$16,928
Jul 1997020217.582.25$454
Jun 1997014617.242.26$330
May 1997022818.972.31$526
Apr 1997038117.882.08$794
Mar 1997043618.951.94$845
Feb 199701,30620.492.21$2,881
Jan 199705,91023.483.54$20,920
Dec 199606,18723.32$0
Nov 199604,72221.97$0
Oct 19961432823.31$3,333
Sep 19960022.22$0
Aug 199602,91220.26$0
Jul 199603,42119.55$0
Jun 19961763,48218.73$3,296
May 199603,27919.43$0
Apr 199603,37121.51$0
Mar 199603,61119.38$0
Feb 199603,48116.98$0
Jan 199603,82617.07$0
Dec 199513,96817.19$17
Nov 199503,90316.00$0
Oct 199504,26215.43$0
Sep 19951784,17616.18$2,880
Aug 199504,07415.92$0
Jul 199584,54915.24$122
Jun 199504,80616.41$0
May 199505,23917.56$0
Apr 199505,28517.73$0
Mar 199505,70016.44$0
Feb 199505,35516.58$0
Jan 199506,36615.92$0
Dec 1994886,84015.03$1,323
Nov 199407,42115.90$0
Oct 199408,86715.58$0
Sep 199406,28215.29$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Feb 2008 — as filed, then multipliedworked
Condensate             0 bbl  × $ 92.53 =         $0
Gas                   12 Mcf  × $  8.77 =       $105

────────────────────────────────────────────────────
Month total                                     $105

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/151813 is the state's own key, not one this site invented.