GUILL, J. C.

Operated by HARLETON OIL & GAS INC. (P-5 357165) in the CARTHAGE (TRAVIS PEAK 6450) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 154208District 06Field 16032950GasSaveExport
Value, all time
$243 k
Mar 1995 – Jun 2004
Value, last 12 filed months
$0
at the published price for each month
Months reported
112
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 62 leases and 62 wells, and the rule below applies to all of them.

Discovered
1986-09-20
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 1994-08-29.

The Commission's schedule remark for this field reads: EFFECTIVE AUGUST.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction381,156 Mcf$242,817
Total$242,817

295,652 Mcf of this lease's gas, across 22 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1840, -94.1953. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.18398, -94.19532 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
6,433 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 6,433 ft.

Completions filed
Jul 2004
1 of 1 wells

1 well

42-3650114116,433 ftJul 2004Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (112)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

112 months

Jun 2004036.106.43$0
May 2004037.486.49$0
Apr 2004034.475.86$0
Mar 2004034.365.53$0
Feb 2004032.455.51$0
Jan 2004032.036.30$0
Dec 2003030.266.30$0
Nov 2003028.804.60$0
Oct 2003028.174.76$0
Sep 2003026.314.75$0
Aug 2003029.765.13$0
Jul 2003029.415.17$0
Jun 2003028.565.98$0
May 2003026.595.97$0
Apr 2003026.675.41$0
Mar 2003031.146.10$0
Feb 2003033.487.93$0
Jan 2003030.315.58$0
Dec 2002026.914.85$0
Nov 2002024.664.14$0
Oct 2002026.464.23$0
Sep 2002027.443.64$0
Aug 2002025.963.16$0
Jul 2002024.583.06$0
Jun 2002023.733.34$0
May 2002724.663.58$25
Apr 20024823.653.51$169
Mar 20028822.003.10$273
Feb 200219918.222.38$473
Jan 200281917.172.38$1,946
Dec 200189416.932.36$2,114
Nov 20011,35318.072.41$3,255
Oct 200194519.782.53$2,390
Sep 200189324.262.25$2,010
Aug 200174624.873.05$2,278
Jul 20011,10823.933.20$3,542
Jun 200194124.563.82$3,599
May 20011,39525.524.31$6,009
Apr 20011,10924.685.34$5,917
Mar 200186124.545.38$4,629
Feb 200182827.755.77$4,775
Jan 200178427.478.40$6,585
Dec 200080626.889.12$7,353
Nov 200086332.215.66$4,883
Oct 20001,21831.235.15$6,267
Sep 200080531.875.19$4,175
Aug 200090929.644.54$4,128
Jul 200070928.534.09$2,900
Jun 200070729.304.40$3,109
May 20001,14427.263.68$4,210
Apr 20001,12324.513.12$3,499
Mar 20001,02128.422.86$2,920
Feb 200082527.622.73$2,249
Jan 20001,17825.272.48$2,922
Dec 19991,34924.282.42$3,270
Nov 19991,04523.192.43$2,544
Oct 19991,15120.982.80$3,227
Sep 19991,32021.752.62$3,457
Aug 19991,45119.262.88$4,173
Jul 19991,14617.892.37$2,719
Jun 19991,11215.942.36$2,627
May 199992515.792.32$2,147
Apr 199980715.102.21$1,782
Mar 19991,02312.471.84$1,881
Feb 19991,0299.981.82$1,871
Jan 19991,36110.381.90$2,586
Dec 19981,6089.201.77$2,852
Nov 19981,71410.892.19$3,746
Oct 19982,12512.421.97$4,185
Sep 19981,76512.592.08$3,676
Aug 19982,31911.301.91$4,423
Jul 19981,18011.742.24$2,640
Jun 199839511.242.24$884
May 19981,75412.622.21$3,870
Apr 19981,65013.042.51$4,134
Mar 19982,23812.802.31$5,169
Feb 199879313.952.30$1,823
Jan 19981,96014.702.15$4,223
Dec 199738216.322.41$921
Nov 19971,02118.193.09$3,153
Oct 19972,23519.253.15$7,040
Sep 19971,97917.742.95$5,848
Aug 19972,14717.862.55$5,485
Jul 19972,36017.582.25$5,303
Jun 19972,39117.242.26$5,397
May 19972,50118.972.31$5,774
Apr 19972,56317.882.08$5,338
Mar 19973,47718.951.94$6,742
Feb 19973,83920.492.21$8,468
Jan 19973,06323.483.54$10,842
Dec 19963,35223.32$0
Nov 19964,11321.97$0
Oct 19964,82623.31$0
Sep 19965,17122.22$0
Aug 19965,16820.26$0
Jul 19966,53819.55$0
Jun 19967,48818.73$0
May 19967,93119.43$0
Apr 19969,70421.51$0
Mar 19969,87319.38$0
Feb 199610,62716.98$0
Jan 199614,34217.07$0
Dec 199517,02517.19$0
Nov 199519,94416.00$0
Oct 199515,75315.43$0
Sep 199518,43816.18$0
Aug 199524,95515.92$0
Jul 199520,40615.24$0
Jun 199531,03416.41$0
May 199530,50417.56$0
Apr 199526,96417.73$0
Mar 19951,49616.44$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2002 — as filed, then multipliedworked
Gas                    7 Mcf  × $  3.58 =        $25

────────────────────────────────────────────────────
Month total                                      $25

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/154208 is the state's own key, not one this site invented.