CUMMINS GAS UNIT O/A

Operated by TEXACO E & P INC. (P-5 844118) in the BETHEL (RODESSA) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 15778District 06Field 07544400CondensateGasSaveExport
Value, all time
$447 k
Jan 1993 – Feb 2001
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
98
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 17 leases and 17 wells, and the rule below applies to all of them.

Discovered
1957-07-25
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 02/01/98.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition850 bbl$14,299
GasProduction424,889 Mcf$433,025
Total$447,325

237,484 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8972, -95.9267. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.89721, -95.92669 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,988 ft
1 wells filed one
Completion to plug
23.5 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,988 ft.

Completions filed
Mar 2001
1 of 1 wells
Plug dates filed
Sep 2024
1 of 1 wells

Last completion to plug: a median of 23.5 years across the 1 well that filed both dates, with the middle half between 23.5 years and 23.5 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-0010076618,988 ftMar 2001Sep 2024Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (98)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

98 months

Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 200039026.889.12$1,048
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 2000025128.422.86$718
Feb 2000031127.622.73$848
Jan 2000027725.272.48$687
Dec 1999013724.282.42$332
Nov 199903223.192.43$78
Oct 1999038720.982.80$1,085
Sep 199932,02421.752.62$5,366
Aug 199931,49119.262.88$4,345
Jul 199902,36817.892.37$5,618
Jun 1999214,22915.942.36$10,324
May 199955,71115.792.32$13,334
Apr 19991636,81815.102.21$17,516
Mar 1999126,59612.471.84$12,275
Feb 199955,7529.981.82$10,506
Jan 199905,99210.381.90$11,385
Dec 199806,4549.201.77$11,445
Nov 199816,76110.892.19$14,789
Oct 199816,77812.421.97$13,360
Sep 199815,87512.592.08$12,248
Aug 199826,62311.301.91$12,655
Jul 199886,39511.742.24$14,401
Jun 199826,34911.242.24$14,227
May 199825,31512.622.21$11,752
Apr 199895,78513.042.51$14,611
Mar 199846,14412.802.31$14,240
Feb 199825,77313.952.30$13,301
Jan 199856,16514.702.15$13,358
Dec 19971856,57816.322.41$18,879
Nov 199748,52918.193.09$26,413
Oct 199716,61219.253.15$20,846
Sep 199724,48617.742.95$13,291
Aug 199715,37217.862.55$13,742
Jul 199745,99917.582.25$13,550
Jun 199757,01117.242.26$15,911
May 199727,90218.972.31$18,280
Apr 199705,28217.882.08$11,001
Mar 199724,21218.951.94$8,206
Feb 199704,03020.492.21$8,890
Jan 199704,59923.483.54$16,279
Dec 199605,28123.32$0
Nov 199606,37521.97$0
Oct 199603,23623.31$0
Sep 199606,54422.22$0
Aug 199602,11520.26$0
Jul 199642,84019.55$78
Jun 199603,31718.73$0
May 199603,62819.43$0
Apr 199605,54921.51$0
Mar 19961744,79019.38$3,372
Feb 199606,29816.98$0
Jan 1996011,10217.07$0
Dec 199501,42117.19$0
Nov 199501,64216.00$0
Oct 199504,13115.43$0
Sep 199507,16216.18$0
Aug 1995011,85315.92$0
Jul 199501,13715.24$0
Jun 1995053616.41$0
May 1995074817.56$0
Apr 199503,44417.73$0
Mar 199505,15416.44$0
Feb 199505,01816.58$0
Jan 199505,23515.92$0
Dec 199405,83315.03$0
Nov 199404,64715.90$0
Oct 19941575,67115.58$2,446
Sep 199405,18715.29$0
Aug 199401,08716.13$0
Jul 199412,45217.56$18
Jun 199404,96617.09$0
May 199415,78915.88$16
Apr 199405,85414.14$0
Mar 199406,42512.46$0
Feb 199405,02012.50$0
Jan 1994166,22912.66$203
Dec 199306,47312.33$0
Nov 199305,80914.49$0
Oct 199304,71715.85$0
Sep 199306,05915.03$0
Aug 199306,51515.66$0
Jul 199306,05915.46$0
Jun 199304,39316.79$0
May 199305,18617.68$0
Apr 199335,89418.05$54
Mar 199306,14518.14$0
Feb 199305,90717.90$0
Jan 199306,61116.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2000 — as filed, then multipliedworked
Condensate            39 bbl  × $ 26.88 =     $1,048
Gas                    0 Mcf  × $  9.12 =         $0

────────────────────────────────────────────────────
Month total                                   $1,048

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/15778 is the state's own key, not one this site invented.