WHITE, R. B.

Operated by QUANTUM RESOURCES MANAGEMENT,LLC (P-5 684554) in the WHITE OAK (COTTON VALLEY SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 158612District 06Field 969691502 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.0 M
Apr 1996 – Aug 2014
Value, last 12 filed months
$4
at the published price for each month
Months reported
221
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 170 leases and 170 wells, and the rule below applies to all of them.

Discovered
1991-07-20
as the register files it
Field class
Gas
the register's own label
Between wells
600 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2012-03-20.

The Commission's schedule remark for this field reads: LOG OF C. W. RESOURCES MAUD SMITH #1 WELL (API 42-183-30958).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111996-07-29134601
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition216 bbl$18,706
GasProduction699,003 Mcf$1,992,271
Total$2,010,978

182,343 Mcf of this lease's gas, across 9 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.5007, -94.8576. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.50072, -94.85756 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,893 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,893 ft.

Completions filed
Aug 2014
1 of 1 wells

1 well

42-18331215110,893 ftAug 2014Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (221)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

221 months

Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130188.853.74$4
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 2013024194.403.93$948
May 201301,43794.834.15$5,962
Apr 20130593.964.28$21
Mar 2013051893.623.91$2,027
Feb 2013066191.233.42$2,261
Jan 2013071191.603.42$2,432
Dec 2012054686.773.42$1,867
Nov 2012042686.953.62$1,544
Oct 2012037689.383.40$1,278
Sep 20120094.672.92$0
Aug 2012023792.662.91$689
Jul 2012060385.133.02$1,822
Jun 201201,14579.822.52$2,884
May 201201,15491.612.49$2,872
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201202101.102.57$5
Jan 2012010698.092.73$290
Dec 20110796.873.24$23
Nov 201107395.723.31$242
Oct 2011063484.983.65$2,313
Sep 2011036183.623.99$1,439
Aug 2011026383.404.15$1,091
Jul 201109494.144.52$425
Jun 201101992.904.64$88
May 20110598.134.40$22
Apr 201109105.964.33$39
Mar 201104996.364.06$199
Feb 20110085.644.18$0
Jan 2011019886.504.59$909
Dec 20100185.734.35$4
Nov 20100180.843.80$4
Oct 20100478.103.51$14
Sep 201001272.633.98$48
Aug 201002273.684.42$97
Jul 20100372.554.74$14
Jun 201005970.364.91$290
May 2010012571.124.24$529
Apr 2010042381.694.12$1,744
Mar 2010040778.394.39$1,786
Feb 2010019273.585.44$1,045
Jan 2010042274.365.96$2,517
Dec 2009041971.445.48$2,298
Nov 2009068174.593.75$2,555
Oct 2009090072.544.11$3,699
Sep 2009947665.543.06$2,049
Aug 2009033467.423.22$1,075
Jul 2009885361.133.46$3,444
Jun 2009978166.163.90$3,637
May 2009889154.743.93$3,936
Apr 2009068046.773.59$2,440
Mar 20091063442.144.06$2,995
Feb 20091072632.814.63$3,692
Jan 20091245435.865.37$2,869
Dec 20081290737.105.98$5,866
Nov 200801,10155.496.86$7,553
Oct 20081815475.246.92$2,420
Sep 200822941101.767.88$9,651
Aug 20080127114.228.48$1,077
Jul 200846198131.0811.39$8,285
Jun 20081748131.3313.03$9,880
May 200822182123.1711.57$4,816
Apr 20080308110.3110.45$3,220
Mar 200812225101.909.66$3,397
Feb 2008085992.538.77$7,534
Jan 20081348190.388.21$5,122
Dec 2007098688.337.30$7,200
Nov 200701,00491.677.29$7,321
Oct 200701,17382.856.92$8,119
Sep 2007092775.846.24$5,788
Aug 2007045169.066.39$2,881
Jul 2007026470.906.39$1,686
Jun 2007083862.007.55$6,326
May 2007064458.747.85$5,053
Apr 2007063059.617.81$4,917
Mar 2007073756.927.30$5,382
Feb 2007076255.108.22$6,261
Jan 200701,10850.306.73$7,453
Dec 2006080856.656.92$5,590
Nov 2006077154.207.62$5,873
Oct 200601,24154.906.01$7,463
Sep 200601,11560.085.04$5,616
Aug 200601,45768.717.34$10,694
Jul 200601,24269.376.34$7,878
Jun 200601,23766.286.38$7,897
May 2006098566.016.42$6,329
Apr 200601,18764.397.36$8,737
Mar 200601,15656.707.08$8,188
Feb 200601,77357.597.75$13,743
Jan 200602,23260.598.93$19,939
Dec 200502,12154.9413.42$28,454
Nov 200502,33054.6910.59$24,671
Oct 200502,29458.3413.80$31,647
Sep 200502,31261.4512.08$27,927
Aug 200501,65461.519.80$16,204
Jul 200503,03955.697.84$23,837
Jun 200502,35352.337.38$17,368
May 200502,79745.226.65$18,603
Apr 200501,92949.207.36$14,198
Mar 200501,86050.377.15$13,308
Feb 200501,90045.226.31$11,993
Jan 200502,35943.166.32$14,914
Dec 200402,27239.866.75$15,338
Nov 200402,11045.286.33$13,357
Oct 200401,84649.706.52$12,027
Sep 200402,21843.245.28$11,720
Aug 200402,61242.375.55$14,498
Jul 200402,72938.286.08$16,604
Jun 200402,24236.106.43$14,423
May 200402,18837.486.49$14,210
Apr 200402,28234.475.86$13,369
Mar 200401,86034.365.53$10,286
Feb 200402,16132.455.51$11,906
Jan 200402,33632.036.30$14,716
Dec 200302,30630.266.30$14,532
Nov 200302,30628.804.60$10,596
Oct 200302,30028.174.76$10,947
Sep 200302,72626.314.75$12,947
Aug 200302,64129.765.13$13,548
Jul 200302,91229.415.17$15,057
Jun 200302,96028.565.98$17,710
May 200302,43926.595.97$14,567
Apr 200303,29826.675.41$17,833
Mar 200302,85331.146.10$17,392
Feb 200302,70733.487.93$21,455
Jan 200302,67630.315.58$14,938
Dec 200242,56926.914.85$12,577
Nov 200202,18124.664.14$9,023
Oct 200202,17526.464.23$9,198
Sep 200202,16827.443.64$7,881
Aug 200203,72425.963.16$11,783
Jul 200202,77324.583.06$8,490
Jun 200203,03223.733.34$10,122
May 200203,21224.663.58$11,512
Apr 200202,54023.653.51$8,921
Mar 200202,86622.003.10$8,892
Feb 200203,38118.222.38$8,032
Jan 200203,63917.172.38$8,645
Dec 200104,21416.932.36$9,964
Nov 200104,42018.072.41$10,632
Oct 200105,06319.782.53$12,804
Sep 200103,90724.262.25$8,796
Aug 200104,50024.873.05$13,739
Jul 200104,07023.933.20$13,012
Jun 200103,83024.563.82$14,647
May 200104,20225.524.31$18,099
Apr 200104,58024.685.34$24,436
Mar 200103,30024.545.38$17,742
Feb 200102,65327.755.77$15,300
Jan 200104,41227.478.40$37,055
Dec 200003,78826.889.12$34,556
Nov 200003,44232.215.66$19,475
Oct 200003,27231.235.15$16,836
Sep 200003,87831.875.19$20,113
Aug 200003,76829.644.54$17,110
Jul 200003,71328.534.09$15,185
Jun 200004,26729.304.40$18,763
May 200003,69827.263.68$13,608
Apr 200004,37324.513.12$13,626
Mar 200004,57428.422.86$13,081
Feb 200003,70427.622.73$10,099
Jan 200004,28025.272.48$10,617
Dec 199904,69424.282.42$11,377
Nov 199904,34223.192.43$10,568
Oct 199904,59820.982.80$12,891
Sep 199904,25921.752.62$11,154
Aug 199904,27719.262.88$12,299
Jul 199904,76217.892.37$11,297
Jun 199904,35915.942.36$10,296
May 199905,23315.792.32$12,146
Apr 199904,94715.102.21$10,923
Mar 199905,34712.471.84$9,830
Feb 199904,6149.981.82$8,387
Jan 199905,38610.381.90$10,233
Dec 199805,6179.201.77$9,961
Nov 199805,25910.892.19$11,495
Oct 199806,13312.421.97$12,077
Sep 199806,00712.592.08$12,510
Aug 199806,28811.301.91$11,993
Jul 199806,58011.742.24$14,721
Jun 199806,25211.242.24$13,987
May 199806,51412.622.21$14,372
Apr 199806,95713.042.51$17,430
Mar 199806,28412.802.31$14,513
Feb 199806,57613.952.30$15,119
Jan 199807,54214.702.15$16,251
Dec 199707,92816.322.41$19,115
Nov 199707,63918.193.09$23,591
Oct 199707,63119.253.15$24,036
Sep 199706,91117.742.95$20,421
Aug 199709,95517.862.55$25,432
Jul 199707,63317.582.25$17,151
Jun 199707,66017.242.26$17,290
May 1997016,38118.972.31$37,816
Apr 1997015,41117.882.08$32,098
Mar 1997011,75918.951.94$22,802
Feb 199709,86320.492.21$21,757
Jan 199708,62623.483.54$30,533
Dec 199608,60523.32$0
Nov 1996013,23221.97$0
Oct 1996013,04123.31$0
Sep 1996015,60322.22$0
Aug 1996016,79420.26$0
Jul 1996024,92419.55$0
Jun 1996024,68218.73$0
May 1996027,37619.43$0
Apr 1996038,08621.51$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Nov 2013 — as filed, then multipliedworked
Condensate             0 bbl  × $ 88.85 =         $0
Gas                    1 Mcf  × $  3.74 =         $4

────────────────────────────────────────────────────
Month total                                       $4

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/158612 is the state's own key, not one this site invented.