WERNER-POPE

Operated by PETROQUEST ENERGY, L.L.C. (P-5 660818) in the CARTHAGE (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 162119District 06Field 160321742 tax incentive programmesGasSaveExport
Value, all time
$1.3 M
Jan 1997 – Nov 2021
Value, last 12 filed months
$0
at the published price for each month
Months reported
299
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 4,104 leases and 4,104 wells, and the rule below applies to all of them.

Discovered
1968-05-01
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2011-02-08.

The Commission's schedule remark for this field reads: FIELD. EFFECTIVE 4/12/16.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas111997-04-04136326
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction400,876 Mcf$1,336,569
Total$1,336,569

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1094, -94.0964. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.10941, -94.09643 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
9,913 ft
1 wells filed one
Completion to plug
15.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,913 ft.

Completions filed
Jan 2006
1 of 1 wells
Plug dates filed
Nov 2021
1 of 1 wells

Last completion to plug: a median of 15.8 years across the 1 well that filed both dates, with the middle half between 15.8 years and 15.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3653346479,913 ftJan 2006Nov 2021Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (299)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

299 months

Nov 2021077.435.24$0
Oct 2021079.795.71$0
Sep 2021069.865.35$0
Aug 2021066.024.22$0
Jul 2021070.783.98$0
Jun 2021069.493.38$0
May 2021063.483.02$0
Apr 2021060.362.76$0
Mar 2021061.302.72$0
Feb 2021057.805.55$0
Jan 2021050.412.81$0
Dec 2020044.642.68$0
Nov 2020038.772.71$0
Oct 2020036.972.48$0
Sep 2020037.091.99$0
Aug 2020039.982.39$0
Jul 2020038.371.83$0
Jun 2020034.901.69$0
May 2020016.921.81$0
Apr 2020014.751.80$0
Mar 2020030.341.86$0
Feb 2020049.881.98$0
Jan 2020057.252.09$0
Dec 2019059.012.30$0
Nov 2019055.302.75$0
Oct 2019053.472.42$0
Sep 2019055.052.66$0
Aug 2019053.112.30$0
Jul 2019056.272.46$0
Jun 2019052.782.49$0
May 2019058.482.74$0
Apr 2019062.632.75$0
Mar 2019056.803.06$0
Feb 2019050.852.79$0
Jan 2019046.033.23$0
Dec 2018046.594.19$0
Nov 2018052.934.24$0
Oct 2018061.443.40$0
Sep 2018059.543.11$0
Aug 2018059.403.07$0
Jul 2018065.142.93$0
Jun 2018060.183.08$0
May 2018065.382.90$0
Apr 2018063.842.90$0
Mar 2018061.222.79$0
Feb 2018061.782.77$0
Jan 2018062.874.01$0
Dec 2017057.272.92$0
Nov 2017055.423.12$0
Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 2014095.944.81$0
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014090.404.86$0
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 2013097.423.78$0
Sep 20130104.113.72$0
Aug 20130104.253.52$0
Jul 20130102.523.72$0
Jun 2013094.403.93$0
May 2013094.834.15$0
Apr 2013093.964.28$0
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 2012094.672.92$0
Aug 2012092.662.91$0
Jul 2012085.133.02$0
Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 20120101.652.00$0
Mar 20120105.052.22$0
Feb 20120101.102.57$0
Jan 2012098.092.73$0
Dec 2011096.873.24$0
Nov 2011095.723.31$0
Oct 2011084.983.65$0
Sep 2011083.623.99$0
Aug 2011083.404.15$0
Jul 2011094.144.52$0
Jun 2011092.904.64$0
May 2011098.134.40$0
Apr 20110105.964.33$0
Mar 2011096.364.06$0
Feb 2011085.644.18$0
Jan 2011086.504.59$0
Dec 2010085.734.35$0
Nov 2010080.843.80$0
Oct 2010078.103.51$0
Sep 2010072.633.98$0
Aug 2010073.684.42$0
Jul 2010072.554.74$0
Jun 2010070.364.91$0
May 2010071.124.24$0
Apr 2010081.694.12$0
Mar 2010078.394.39$0
Feb 2010073.585.44$0
Jan 2010074.365.96$0
Dec 2009071.445.48$0
Nov 2009074.593.75$0
Oct 2009072.544.11$0
Sep 2009065.543.06$0
Aug 2009067.423.22$0
Jul 2009061.133.46$0
Jun 2009066.163.90$0
May 2009054.743.93$0
Apr 2009046.773.59$0
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008037.105.98$0
Nov 2008055.496.86$0
Oct 2008075.246.92$0
Sep 20080101.767.88$0
Aug 20080114.228.48$0
Jul 20080131.0811.39$0
Jun 20080131.3313.03$0
May 20080123.1711.57$0
Apr 20080110.3110.45$0
Mar 20080101.909.66$0
Feb 2008092.538.77$0
Jan 2008090.388.21$0
Dec 2007088.337.30$0
Nov 2007091.677.29$0
Oct 2007082.856.92$0
Sep 2007075.846.24$0
Aug 2007069.066.39$0
Jul 2007070.906.39$0
Jun 2007062.007.55$0
May 2007058.747.85$0
Apr 2007059.617.81$0
Mar 2007056.927.30$0
Feb 2007055.108.22$0
Jan 2007050.306.73$0
Dec 2006056.656.92$0
Nov 2006054.207.62$0
Oct 2006054.906.01$0
Sep 2006060.085.04$0
Aug 2006068.717.34$0
Jul 2006069.376.34$0
Jun 2006066.286.38$0
May 2006066.016.42$0
Apr 2006064.397.36$0
Mar 2006056.707.08$0
Feb 2006057.597.75$0
Jan 2006060.598.93$0
Dec 200565754.9413.42$8,814
Nov 200543954.6910.59$4,648
Oct 200553558.3413.80$7,381
Sep 200548861.4512.08$5,895
Aug 200561561.519.80$6,025
Jul 200580155.697.84$6,283
Jun 200549452.337.38$3,646
May 20051,72745.226.65$11,487
Apr 20051,51949.207.36$11,181
Mar 20051,90650.377.15$13,637
Feb 20051,83745.226.31$11,595
Jan 20052,49343.166.32$15,761
Dec 20042,07839.866.75$14,029
Nov 20041,79445.286.33$11,357
Oct 20042,46949.706.52$16,086
Sep 20042,11243.245.28$11,160
Aug 20042,06442.375.55$11,457
Jul 20041,69138.286.08$10,288
Jun 20041,11236.106.43$7,154
May 200490837.486.49$5,897
Apr 20041,02134.475.86$5,981
Mar 20041,39434.365.53$7,709
Feb 20041,00132.455.51$5,515
Jan 200494732.036.30$5,966
Dec 200398230.266.30$6,188
Nov 20031,42628.804.60$6,553
Oct 20031,57228.174.76$7,482
Sep 20032,05326.314.75$9,750
Aug 20031,83529.765.13$9,413
Jul 20032,37029.415.17$12,255
Jun 20031,84928.565.98$11,062
May 20032,20126.595.97$13,146
Apr 20031,76526.675.41$9,544
Mar 20031,72331.146.10$10,503
Feb 20031,82733.487.93$14,481
Jan 20032,47930.315.58$13,838
Dec 20022,38426.914.85$11,571
Nov 20022,28624.664.14$9,457
Oct 20021,85326.464.23$7,837
Sep 20022,75127.443.64$10,000
Aug 20021,87525.963.16$5,933
Jul 20022,29024.583.06$7,011
Jun 20022,35523.733.34$7,862
May 20022,44624.663.58$8,766
Apr 20022,82123.653.51$9,908
Mar 20022,45422.003.10$7,614
Feb 20022,35018.222.38$5,583
Jan 20023,04617.172.38$7,236
Dec 20012,81816.932.36$6,663
Nov 20012,27818.072.41$5,480
Oct 20011,14119.782.53$2,885
Sep 20011,41524.262.25$3,186
Aug 20011,03024.873.05$3,145
Jul 20011,39623.933.20$4,463
Jun 20012,63324.563.82$10,069
May 20012,53025.524.31$10,898
Apr 20012,43924.685.34$13,013
Mar 20012,60124.545.38$13,984
Feb 20012,74127.755.77$15,808
Jan 20013,51627.478.40$29,530
Dec 20004,69226.889.12$42,803
Nov 20003,43832.215.66$19,452
Oct 20003,07731.235.15$15,833
Sep 20003,26531.875.19$16,934
Aug 20003,32929.644.54$15,116
Jul 20004,16728.534.09$17,042
Jun 20003,59229.304.40$15,795
May 20003,49027.263.68$12,842
Apr 20003,30724.513.12$10,305
Mar 20003,75828.422.86$10,747
Feb 20004,07527.622.73$11,110
Jan 20004,03925.272.48$10,019
Dec 19996,38224.282.42$15,468
Nov 19992,73623.192.43$6,659
Oct 19993,12320.982.80$8,756
Sep 19993,03821.752.62$7,956
Aug 19993,63219.262.88$10,444
Jul 19993,44517.892.37$8,173
Jun 19993,31815.942.36$7,837
May 19992,86715.792.32$6,654
Apr 19993,22115.102.21$7,112
Mar 19993,84312.471.84$7,065
Feb 19994,2729.981.82$7,766
Jan 19994,31110.381.90$8,191
Dec 19985,3719.201.77$9,525
Nov 19985,14110.892.19$11,237
Oct 19985,26012.421.97$10,358
Sep 19985,33512.592.08$11,111
Aug 19985,59711.301.91$10,675
Jul 19986,06711.742.24$13,574
Jun 19986,00011.242.24$13,424
May 19986,22012.622.21$13,723
Apr 19985,80013.042.51$14,531
Mar 19987,02812.802.31$16,231
Feb 19986,48213.952.30$14,903
Jan 19987,12014.702.15$15,342
Dec 19977,71316.322.41$18,597
Nov 19978,02018.193.09$24,768
Oct 19979,53219.253.15$30,024
Sep 19979,98717.742.95$29,510
Aug 19979,31717.862.55$23,803
Jul 199712,47617.582.25$28,033
Jun 199710,17117.242.26$22,958
May 199711,68318.972.31$26,970
Apr 199713,09417.882.08$27,272
Mar 199715,15918.951.94$29,395
Feb 199719,78520.492.21$43,644
Jan 19974,46823.483.54$15,815

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Dec 2005 — as filed, then multipliedworked
Gas                  657 Mcf  × $ 13.42 =     $8,814

────────────────────────────────────────────────────
Month total                                   $8,814

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/162119 is the state's own key, not one this site invented.