LAIRD, LOMA L.

Operated by KAISER-FRANCIS OIL COMPANY (P-5 450175) in the NACONICHE CREEK, W. (TRAVIS PK.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 164998District 06Field 64305750CondensateGasSaveExport
Value, all time
$114 k
Jan 1993 – Jun 2000
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
90
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 6 leases and 6 wells, and the rule below applies to all of them.

Discovered
1983-06-28
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AND AOF-2 EFFECTIVE 1-1-98.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition353 bbl$7,391
GasProduction78,248 Mcf$107,102
Total$114,492

34,082 Mcf of this lease's gas, across 48 months, carries no value here. No free Texas wellhead gas price exists before 1997, so those months are left out of the total rather than valued at zero. The total above is therefore a floor, not an estimate.

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7344, -94.5865. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.73443, -94.58651 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
8,852 ft
1 wells filed one
Completion to plug
11.3 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,852 ft.

Completions filed
Nov 2004
1 of 1 wells
Plug dates filed
Mar 2016
1 of 1 wells

Last completion to plug: a median of 11.3 years across the 1 well that filed both dates, with the middle half between 11.3 years and 11.3 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3473138918,852 ftNov 2004Mar 2016Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (90)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

90 months

Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 2000122028.422.86$3,467
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0
Jan 199901,41710.381.90$2,692
Dec 199801,4599.201.77$2,587
Nov 199801,40710.892.19$3,075
Oct 199801,79812.421.97$3,541
Sep 199801,21712.592.08$2,535
Aug 199801,47411.301.91$2,811
Jul 199801,26811.742.24$2,837
Jun 199802,01611.242.24$4,510
May 199802,43012.622.21$5,361
Apr 199802,15113.042.51$5,389
Mar 199802,40712.802.31$5,559
Feb 199802,88213.952.30$6,626
Jan 199803,34914.702.15$7,216
Dec 199703,48516.322.41$8,403
Nov 199704,23118.193.09$13,066
Oct 199704,53319.253.15$14,278
Sep 199701,22417.742.95$3,617
Aug 1997076017.862.55$1,942
Jul 1997077117.582.25$1,732
Jun 19973462117.242.26$1,988
May 1997074218.972.31$1,713
Apr 1997058817.882.08$1,225
Mar 1997063518.951.94$1,231
Feb 1997063920.492.21$1,410
Jan 1997066223.483.54$2,343
Dec 1996066223.32$0
Nov 1996071721.97$0
Oct 1996035523.31$0
Sep 1996068322.22$0
Aug 1996069720.26$0
Jul 1996074019.55$0
Jun 1996063418.73$0
May 1996071319.43$0
Apr 1996060921.51$0
Mar 1996060319.38$0
Feb 1996051116.98$0
Jan 1996060517.07$0
Dec 1995054917.19$0
Nov 1995052416.00$0
Oct 1995058515.43$0
Sep 1995046216.18$0
Aug 1995051115.92$0
Jul 19951646315.24$244
Jun 1995047716.41$0
May 1995057117.56$0
Apr 1995056317.73$0
Mar 1995053516.44$0
Feb 1995047216.58$0
Jan 1995067315.92$0
Dec 1994092015.03$0
Nov 1994083215.90$0
Oct 1994056415.58$0
Sep 1994089015.29$0
Aug 1994069316.13$0
Jul 199401,02017.56$0
Jun 19941811,08317.09$3,093
May 1994090015.88$0
Apr 1994084514.14$0
Mar 1994084612.46$0
Feb 1994077012.50$0
Jan 199401,00312.66$0
Dec 1993075412.33$0
Nov 1993081614.49$0
Oct 1993099615.85$0
Sep 199301,00415.03$0
Aug 1993086515.66$0
Jul 1993093915.46$0
Jun 1993062816.79$0
May 1993077717.68$0
Apr 1993069718.05$0
Mar 1993081618.14$0
Feb 199301,00417.90$0
Jan 1993050616.93$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Mar 2000 — as filed, then multipliedworked
Condensate           122 bbl  × $ 28.42 =     $3,467
Gas                    0 Mcf  × $  2.86 =         $0

────────────────────────────────────────────────────
Month total                                   $3,467

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/164998 is the state's own key, not one this site invented.