HUDSON-JOHNSON UNIT

Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the CARTHAGE (TRAVIS PEAK 7400) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 172517District 06Field 160329642 tax incentive programmesCondensateGasSaveExport
Value, all time
$709 k
Mar 1999 – May 2005
Value, last 12 filed months
$2 k
at the published price for each month
Months reported
75
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 7 leases and 7 wells, and the rule below applies to all of them.

Discovered
1994-09-16
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: AOF-1 AND AOF-2 EFFECTIVE 07/01/96.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-04-01155521
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,487 bbl$57,573
GasProduction230,116 Mcf$651,076
Total$708,649

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2142, -94.3302. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.21422, -94.33016 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
8,150 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 8,150 ft.

Completions filed
Sep 2006
1 of 1 wells

1 well

42-3653409515 U8,150 ftSep 2006Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (75)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

75 months

May 20050045.226.65$0
Apr 200502849.207.36$206
Mar 20050050.377.15$0
Feb 200502445.226.31$151
Jan 200502343.166.32$145
Dec 200401239.866.75$81
Nov 200402245.286.33$139
Oct 200402849.706.52$182
Sep 200402143.245.28$111
Aug 200403342.375.55$183
Jul 200403638.286.08$219
Jun 200404136.106.43$264
May 200407037.486.49$455
Apr 200406634.475.86$387
Mar 200407934.365.53$437
Feb 200406332.455.51$347
Jan 200406232.036.30$391
Dec 200307030.266.30$441
Nov 2003013528.804.60$620
Oct 2003017028.174.76$809
Sep 2003012626.314.75$598
Aug 2003014229.765.13$728
Jul 2003014429.415.17$745
Jun 2003014628.565.98$874
May 2003017926.595.97$1,069
Apr 2003517226.675.41$1,063
Mar 20034117431.146.10$2,337
Feb 20033715333.487.93$2,451
Jan 20031818230.315.58$1,562
Dec 20021719426.914.85$1,399
Nov 20021619724.664.14$1,210
Oct 20022024926.464.23$1,582
Sep 2002181,09827.443.64$4,485
Aug 2002121,13625.963.16$3,906
Jul 2002351524.583.06$1,651
Jun 20020023.733.34$0
May 20020024.663.58$0
Apr 200211623.653.51$80
Mar 2002010922.003.10$338
Feb 20021118.222.38$21
Jan 200202617.172.38$62
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 20010019.782.53$0
Sep 200125724.262.25$177
Aug 20011039624.873.05$1,458
Jul 2001181,02123.933.20$3,695
Jun 2001262,43824.563.82$9,962
May 2001272,28025.524.31$10,510
Apr 2001292,55924.685.34$14,369
Mar 2001363,33124.545.38$18,792
Feb 2001264,25727.755.77$25,272
Jan 2001393,95927.478.40$34,322
Dec 20001412,15926.889.12$23,486
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 2000214131.875.19$795
Aug 2000192629.644.54$681
Jul 20001262,15528.534.09$12,408
Jun 20001503,46729.304.40$19,640
May 20001864,38327.263.68$21,199
Apr 20001404,67524.513.12$17,999
Mar 2000305,83628.422.86$17,542
Feb 2000286,48827.622.73$18,463
Jan 2000478,11725.272.48$21,322
Dec 19991509,29324.282.42$26,166
Nov 199914110,13323.192.43$27,933
Oct 199913313,60720.982.80$40,940
Sep 1999847,55421.752.62$21,610
Aug 19991172,09719.262.88$8,284
Jul 199912710,55617.892.37$27,315
Jun 19999121,61815.942.36$52,514
May 199911928,39215.792.32$67,777
Apr 199913534,14115.102.21$77,424
Mar 199911929,03812.471.84$54,865

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2005 — as filed, then multipliedworked
Condensate             0 bbl  × $ 49.20 =         $0
Gas                   28 Mcf  × $  7.36 =       $206

────────────────────────────────────────────────────
Month total                                     $206

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/172517 is the state's own key, not one this site invented.