TAYLOR, W. B.

Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the WASKOM (TRAVIS PEAK X-SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 172666District 06Field 95369815CondensateGasSaveExport
Value, all time
$839 k
Sep 1998 – Dec 2015
Value, last 12 filed months
$0
at the published price for each month
Months reported
208
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 20 leases and 20 wells, and the rule below applies to all of them.

Discovered
1986-11-18
as the register files it
Field class
Gas
the register's own label
Between wells
no field rule filed
From a lease line
no field rule filed

The Commission's schedule remark for this field reads: EFFECTIVE AUGUST.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,169 bbl$63,884
GasProduction285,865 Mcf$775,357
Total$839,241

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4600, -94.1028. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.46002, -94.10278 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
7,850 ft
1 wells filed one
Completion to plug
23.2 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 7,850 ft.

Completions filed
Aug 2002
1 of 1 wells
Plug dates filed
Oct 2025
1 of 1 wells

Last completion to plug: a median of 23.2 years across the 1 well that filed both dates, with the middle half between 23.2 years and 23.2 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-2033253017 L7,850 ftAug 2002Oct 2025Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (208)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

208 months

Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 20150043.433.10$0
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20149090.404.86$814
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 201300104.253.52$0
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 20120086.773.42$0
Nov 20120086.953.62$0
Oct 20120089.383.40$0
Sep 20120094.672.92$0
Aug 20120092.662.91$0
Jul 20120085.133.02$0
Jun 201226079.822.52$2,075
May 20120091.612.49$0
Apr 201200101.652.00$0
Mar 201200105.052.22$0
Feb 201200101.102.57$0
Jan 20120098.092.73$0
Dec 20110096.873.24$0
Nov 20110095.723.31$0
Oct 20110084.983.65$0
Sep 20110083.623.99$0
Aug 20110083.404.15$0
Jul 20110094.144.52$0
Jun 20110092.904.64$0
May 20110098.134.40$0
Apr 201100105.964.33$0
Mar 20110096.364.06$0
Feb 20110085.644.18$0
Jan 20110086.504.59$0
Dec 20100085.734.35$0
Nov 20100080.843.80$0
Oct 20100078.103.51$0
Sep 20100072.633.98$0
Aug 20100073.684.42$0
Jul 20100072.554.74$0
Jun 20100070.364.91$0
May 20100071.124.24$0
Apr 20100081.694.12$0
Mar 20100078.394.39$0
Feb 20100073.585.44$0
Jan 20100074.365.96$0
Dec 20090071.445.48$0
Nov 20090074.593.75$0
Oct 20090072.544.11$0
Sep 20090065.543.06$0
Aug 20090067.423.22$0
Jul 20090061.133.46$0
Jun 20090066.163.90$0
May 20090054.743.93$0
Apr 20090046.773.59$0
Mar 20090042.144.06$0
Feb 20090032.814.63$0
Jan 20090035.865.37$0
Dec 20080037.105.98$0
Nov 20080055.496.86$0
Oct 20080075.246.92$0
Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 200800131.0811.39$0
Jun 200800131.3313.03$0
May 200800123.1711.57$0
Apr 200800110.3110.45$0
Mar 200800101.909.66$0
Feb 20080092.538.77$0
Jan 20080090.388.21$0
Dec 20070088.337.30$0
Nov 20070091.677.29$0
Oct 20070082.856.92$0
Sep 20070075.846.24$0
Aug 20070069.066.39$0
Jul 20070070.906.39$0
Jun 20070062.007.55$0
May 20070058.747.85$0
Apr 20070059.617.81$0
Mar 20070056.927.30$0
Feb 20070055.108.22$0
Jan 20070050.306.73$0
Dec 20060056.656.92$0
Nov 20060054.207.62$0
Oct 20060054.906.01$0
Sep 20060060.085.04$0
Aug 20060068.717.34$0
Jul 20060069.376.34$0
Jun 20060066.286.38$0
May 20060066.016.42$0
Apr 20060064.397.36$0
Mar 20060056.707.08$0
Feb 20060057.597.75$0
Jan 20060060.598.93$0
Dec 20050054.9413.42$0
Nov 20050054.6910.59$0
Oct 20050058.3413.80$0
Sep 20050061.4512.08$0
Aug 20050061.519.80$0
Jul 20050055.697.84$0
Jun 20050052.337.38$0
May 20050045.226.65$0
Apr 20050049.207.36$0
Mar 20050050.377.15$0
Feb 20050045.226.31$0
Jan 20050043.166.32$0
Dec 20040039.866.75$0
Nov 20040045.286.33$0
Oct 20040049.706.52$0
Sep 20040043.245.28$0
Aug 20040042.375.55$0
Jul 20040038.286.08$0
Jun 20040036.106.43$0
May 20040037.486.49$0
Apr 20040034.475.86$0
Mar 20040034.365.53$0
Feb 20040032.455.51$0
Jan 20040032.036.30$0
Dec 20030030.266.30$0
Nov 20030028.804.60$0
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0
Apr 20030026.675.41$0
Mar 20030031.146.10$0
Feb 20030033.487.93$0
Jan 20030030.315.58$0
Dec 20020026.914.85$0
Nov 20020024.664.14$0
Oct 20020026.464.23$0
Sep 20020027.443.64$0
Aug 20020025.963.16$0
Jul 2002022424.583.06$686
Jun 200201,76523.733.34$5,892
May 200201,28524.663.58$4,605
Apr 200201,47623.653.51$5,184
Mar 200241,71322.003.10$5,403
Feb 200201,82918.222.38$4,345
Jan 200201,28517.172.38$3,053
Dec 20010016.932.36$0
Nov 20010018.072.41$0
Oct 2001124019.782.53$2,453
Sep 2001038524.262.25$867
Aug 2001042724.873.05$1,304
Jul 2001048923.933.20$1,563
Jun 200101,40624.563.82$5,377
May 200102,54125.524.31$10,945
Apr 20011523,28524.685.34$21,278
Mar 200103,85824.545.38$20,742
Feb 200103,08527.755.77$17,791
Jan 200103,76027.478.40$31,579
Dec 200003,11126.889.12$28,380
Nov 200003,46532.215.66$19,605
Oct 200043,74031.235.15$19,369
Sep 2000693,68431.875.19$21,306
Aug 200043,47829.644.54$15,911
Jul 20001732,84428.534.09$16,567
Jun 2000152,44229.304.40$11,178
May 2000698227.263.68$3,777
Apr 2000113,67324.513.12$11,715
Mar 20001834,51228.422.86$18,104
Feb 20001804,53427.622.73$17,334
Jan 20001824,96025.272.48$16,902
Dec 19991555,39824.282.42$16,847
Nov 19991745,78023.192.43$18,104
Oct 19991756,50620.982.80$21,912
Sep 19991696,83121.752.62$21,565
Aug 199907,77719.262.88$22,364
Jul 19991768,83317.892.37$24,104
Jun 199909,04115.942.36$21,356
May 1999010,70815.792.32$24,853
Apr 199917611,08015.102.21$27,123
Mar 199908,47412.471.84$15,578
Feb 199918210,4279.981.82$20,770
Jan 1999013,98410.381.90$26,569
Dec 199830818,9179.201.77$36,379
Nov 199818327,01210.892.19$61,034
Oct 199832940,41312.421.97$83,668
Sep 1998024,44612.592.08$50,912

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2014 — as filed, then multipliedworked
Condensate             9 bbl  × $ 90.40 =       $814
Gas                    0 Mcf  × $  4.86 =         $0

────────────────────────────────────────────────────
Month total                                     $814

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/172666 is the state's own key, not one this site invented.