ADAMS, T. C.

Operated by ENDURANCE OIL & GAS, INC. (P-5 251876) in the BETHANY (NACATOSH) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 176595District 06Field 07527310GasSaveExport
Value, all time
$641 k
Dec 1999 – Oct 2017
Value, last 12 filed months
$0
at the published price for each month
Months reported
215
no gaps in the span
Streams
1
gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 18 leases and 18 wells, and the rule below applies to all of them.

Discovered
1928-05-13
as the register files it
Field class
Gas
the register's own label
Between wells
1,200 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA EFFECTIVE 05/01/91.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
GasProduction131,691 Mcf$640,868
Total$640,868

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2968, -94.0846. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.29679, -94.08461 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
100.0%
1 of 1 wells
Median depth
1,035 ft
1 wells filed one
Completion to plug
17.8 years
median over 1 well

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
1100.0%
BothOn the schedule and plugged. Neither fact cancels the other.
1100.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 1,035 ft.

Completions filed
Dec 1999
1 of 1 wells
Plug dates filed
Oct 2017
1 of 1 wells

Last completion to plug: a median of 17.8 years across the 1 well that filed both dates, with the middle half between 17.8 years and 17.8 years. The gap is the distance between two filed dates. It is not a statement of how long the well produced.

1 well

42-3653427831,035 ftDec 1999Oct 2017Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (215)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

215 months

Oct 2017049.292.98$0
Sep 2017047.523.09$0
Aug 2017045.373.00$0
Jul 2017043.873.09$0
Jun 2017042.493.09$0
May 2017045.373.26$0
Apr 2017047.933.21$0
Mar 2017046.772.98$0
Feb 2017050.452.95$0
Jan 2017049.413.42$0
Dec 2016048.763.72$0
Nov 2016042.492.64$0
Oct 2016046.193.09$0
Sep 2016041.553.10$0
Aug 2016041.442.92$0
Jul 2016041.622.92$0
Jun 2016045.352.69$0
May 2016042.521.99$0
Apr 2016036.561.99$0
Mar 2016033.011.79$0
Feb 2016026.472.06$0
Jan 2016027.352.36$0
Dec 2015032.362.00$0
Nov 2015038.792.17$0
Oct 2015043.552.43$0
Sep 2015042.992.76$0
Aug 2015040.162.87$0
Jul 2015048.152.95$0
Jun 2015056.152.88$0
May 2015055.212.96$0
Apr 2015049.822.71$0
Mar 2015042.892.93$0
Feb 2015044.662.98$0
Jan 2015043.433.10$0
Dec 2014054.693.59$0
Nov 2014070.464.25$0
Oct 2014078.303.90$0
Sep 2014086.164.05$0
Aug 2014089.394.04$0
Jul 2014096.564.18$0
Jun 2014098.164.74$0
May 2014094.734.73$0
Apr 2014095.944.81$0
Mar 2014095.895.06$0
Feb 2014097.406.19$0
Jan 2014090.404.86$0
Dec 2013091.824.35$0
Nov 2013088.853.74$0
Oct 2013097.423.78$0
Sep 20130104.113.72$0
Aug 20130104.253.52$0
Jul 20130102.523.72$0
Jun 2013094.403.93$0
May 2013094.834.15$0
Apr 2013093.964.28$0
Mar 2013093.623.91$0
Feb 2013091.233.42$0
Jan 2013091.603.42$0
Dec 2012086.773.42$0
Nov 2012086.953.62$0
Oct 2012089.383.40$0
Sep 2012094.672.92$0
Aug 2012092.662.91$0
Jul 2012085.133.02$0
Jun 2012079.822.52$0
May 2012091.612.49$0
Apr 201211101.652.00$22
Mar 20129105.052.22$20
Feb 20120101.102.57$0
Jan 20121898.092.73$49
Dec 20112196.873.24$68
Nov 2011095.723.31$0
Oct 20111384.983.65$47
Sep 2011983.623.99$36
Aug 2011883.404.15$33
Jul 20111294.144.52$54
Jun 2011092.904.64$0
May 20111198.134.40$48
Apr 20118105.964.33$35
Mar 20111296.364.06$49
Feb 2011685.644.18$25
Jan 20111186.504.59$50
Dec 2010085.734.35$0
Nov 2010880.843.80$30
Oct 20101178.103.51$39
Sep 2010772.633.98$28
Aug 20101073.684.42$44
Jul 2010872.554.74$38
Jun 2010070.364.91$0
May 2010971.124.24$38
Apr 20101481.694.12$58
Mar 20101678.394.39$70
Feb 2010073.585.44$0
Jan 2010974.365.96$54
Dec 20091171.445.48$60
Nov 20091274.593.75$45
Oct 20091072.544.11$41
Sep 2009765.543.06$21
Aug 2009967.423.22$29
Jul 20092161.133.46$73
Jun 20091566.163.90$58
May 20091854.743.93$71
Apr 20091446.773.59$50
Mar 2009042.144.06$0
Feb 2009032.814.63$0
Jan 2009035.865.37$0
Dec 2008537.105.98$30
Nov 2008855.496.86$55
Oct 20081075.246.92$69
Sep 20086101.767.88$47
Aug 20088114.228.48$68
Jul 20087131.0811.39$80
Jun 20089131.3313.03$117
May 200810123.1711.57$116
Apr 20088110.3110.45$84
Mar 20089101.909.66$87
Feb 2008892.538.77$70
Jan 2008990.388.21$74
Dec 20071188.337.30$80
Nov 2007891.677.29$58
Oct 20071082.856.92$69
Sep 20071175.846.24$69
Aug 2007869.066.39$51
Jul 20071270.906.39$77
Jun 20071062.007.55$75
May 2007758.747.85$55
Apr 20071059.617.81$78
Mar 20071256.927.30$88
Feb 20071355.108.22$107
Jan 20071250.306.73$81
Dec 20061756.656.92$118
Nov 20061454.207.62$107
Oct 20061054.906.01$60
Sep 20061160.085.04$55
Aug 20061368.717.34$95
Jul 20061269.376.34$76
Jun 20069566.286.38$606
May 200610566.016.42$675
Apr 20061064.397.36$74
Mar 2006056.707.08$0
Feb 20069557.597.75$736
Jan 200615160.598.93$1,349
Dec 20058754.9413.42$1,167
Nov 200512454.6910.59$1,313
Oct 200514058.3413.80$1,931
Sep 20057561.4512.08$906
Aug 200535561.519.80$3,478
Jul 200555555.697.84$4,353
Jun 200535452.337.38$2,613
May 200533745.226.65$2,241
Apr 200543949.207.36$3,231
Mar 200542450.377.15$3,034
Feb 200545845.226.31$2,891
Jan 200549643.166.32$3,136
Dec 200456539.866.75$3,814
Nov 200485345.286.33$5,400
Oct 200489349.706.52$5,818
Sep 200467643.245.28$3,572
Aug 200491042.375.55$5,051
Jul 200488038.286.08$5,354
Jun 200491136.106.43$5,860
May 20041,33537.486.49$8,670
Apr 20041,33734.475.86$7,833
Mar 20041,72234.365.53$9,523
Feb 20041,88132.455.51$10,364
Jan 20041,76632.036.30$11,125
Dec 20031,78830.266.30$11,267
Nov 20031,57928.804.60$7,256
Oct 20031,74128.174.76$8,287
Sep 20031,29626.314.75$6,155
Aug 20031,58629.765.13$8,136
Jul 20031,66029.415.17$8,584
Jun 20031,80328.565.98$10,787
May 20031,73026.595.97$10,333
Apr 20031,51226.675.41$8,176
Mar 20031,90631.146.10$11,619
Feb 20031,81933.487.93$14,417
Jan 20032,13330.315.58$11,906
Dec 20021,85826.914.85$9,018
Nov 20022,16324.664.14$8,948
Oct 20022,37326.464.23$10,036
Sep 20022,08727.443.64$7,587
Aug 20022,07225.963.16$6,556
Jul 20022,23624.583.06$6,846
Jun 20022,43523.733.34$8,129
May 20022,21624.663.58$7,942
Apr 20022,24023.653.51$7,868
Mar 20022,35722.003.10$7,313
Feb 20022,27918.222.38$5,414
Jan 20022,53817.172.38$6,029
Dec 20012,72316.932.36$6,438
Nov 20012,89818.072.41$6,971
Oct 20012,42919.782.53$6,143
Sep 20013,11424.262.25$7,011
Aug 20013,64224.873.05$11,120
Jul 20013,50323.933.20$11,199
Jun 20013,55424.563.82$13,591
May 20013,61525.524.31$15,571
Apr 20014,11124.685.34$21,934
Mar 20013,94824.545.38$21,226
Feb 20013,57227.755.77$20,600
Jan 20014,41327.478.40$37,064
Dec 20004,20926.889.12$38,397
Nov 20004,45932.215.66$25,229
Oct 20002,98631.235.15$15,364
Sep 20003,04131.875.19$15,772
Aug 20002,96529.644.54$13,463
Jul 20002,83128.534.09$11,578
Jun 20001,34529.304.40$5,914
May 20001,58227.263.68$5,821
Apr 200065924.513.12$2,053
Mar 2000028.422.86$0
Feb 2000027.622.73$0
Jan 2000025.272.48$0
Dec 1999024.282.42$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Apr 2012 — as filed, then multipliedworked
Gas                   11 Mcf  × $  2.00 =        $22

────────────────────────────────────────────────────
Month total                                      $22

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/176595 is the state's own key, not one this site invented.