WOOLWORTH GAS UNIT

Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the CARTHAGE (TRAVIS PEAK 6400) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 176615District 06Field 16032928CondensateGasSaveExport
Value, all time
$184 k
Feb 1999 – Feb 2005
Value, last 12 filed months
$49 k
at the published price for each month
Months reported
73
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 138 leases and 168 wells, and the rule below applies to all of them.

Discovered
1956-03-12
as the register files it
Field class
Oil and gas
the register's own label
Between wells
500 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2011-04-05.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition369 bbl$8,642
GasProduction42,847 Mcf$174,966
Total$183,607

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.0804, -94.2460. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.08040, -94.24600 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,400 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,400 ft.

Completions filed
Feb 2005
1 of 1 wells

1 well

42-3653113919,400 ftFeb 2005Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (73)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

73 months

Feb 20050045.226.31$0
Jan 2005055243.166.32$3,490
Dec 2004065739.866.75$4,435
Nov 2004064145.286.33$4,058
Oct 2004082049.706.52$5,342
Sep 2004083043.245.28$4,386
Aug 2004067242.375.55$3,730
Jul 200401,11638.286.08$6,790
Jun 200401,02836.106.43$6,613
May 2004085237.486.49$5,533
Apr 2004033934.475.86$1,986
Mar 2004051134.365.53$2,826
Feb 2004041832.455.51$2,303
Jan 2004047032.036.30$2,961
Dec 2003055430.266.30$3,491
Nov 2003045728.804.60$2,100
Oct 2003057128.174.76$2,718
Sep 2003057626.314.75$2,736
Aug 2003149329.765.13$2,559
Jul 2003161729.415.17$3,220
Jun 2003157928.565.98$3,493
May 2003169426.595.97$4,172
Apr 2003173126.675.41$3,979
Mar 2003177631.146.10$4,762
Feb 2003567833.487.93$5,541
Jan 20031375730.315.58$4,620
Dec 20022586826.914.85$4,886
Nov 20022286524.664.14$4,121
Oct 20022390026.464.23$4,415
Sep 2002171,20427.443.64$4,843
Aug 2002151,24725.963.16$4,335
Jul 2002181,35024.583.06$4,576
Jun 2002181,48723.733.34$5,391
May 2002111,57824.663.58$5,927
Apr 2002151,45223.653.51$5,455
Mar 2002151,67722.003.10$5,533
Feb 2002201,53818.222.38$4,018
Jan 2002231,78417.172.38$4,633
Dec 2001171,99716.932.36$5,010
Nov 2001112,28118.072.41$5,686
Oct 2001332,71719.782.53$7,524
Sep 2001623,51324.262.25$9,413
Aug 20010024.873.05$0
Jul 20010023.933.20$0
Jun 20010024.563.82$0
May 20010025.524.31$0
Apr 20010024.685.34$0
Mar 20010024.545.38$0
Feb 20010027.755.77$0
Jan 20010027.478.40$0
Dec 20000026.889.12$0
Nov 20000032.215.66$0
Oct 20000031.235.15$0
Sep 20000031.875.19$0
Aug 20000029.644.54$0
Jul 20000028.534.09$0
Jun 20000029.304.40$0
May 20000027.263.68$0
Apr 20000024.513.12$0
Mar 20000028.422.86$0
Feb 20000027.622.73$0
Jan 20000025.272.48$0
Dec 19990024.282.42$0
Nov 19990023.192.43$0
Oct 19990020.982.80$0
Sep 19990021.752.62$0
Aug 19990019.262.88$0
Jul 19990017.892.37$0
Jun 19990015.942.36$0
May 19990015.792.32$0
Apr 19990015.102.21$0
Mar 19990012.471.84$0
Feb 1999009.981.82$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jan 2005 — as filed, then multipliedworked
Condensate             0 bbl  × $ 43.16 =         $0
Gas                  552 Mcf  × $  6.32 =     $3,490

────────────────────────────────────────────────────
Month total                                   $3,490

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/176615 is the state's own key, not one this site invented.