Operated by DEVON ENERGY PRODUCTION CO, L.P. (P-5 216378) in the CARTHAGE, NORTH (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 185216District 06Field 160342502 tax incentive programmesCondensateGasSaveExport
Value, all time
$657 k
Sep 2001 – Sep 2008
Value, last 12 filed months
$7 k
at the published price for each month
Months reported
85
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 568 leases and 570 wells, and the rule below applies to all of them.

Discovered
1981-11-18
as the register files it
Field class
Oil and gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2010-12-14.

The Commission's schedule remark for this field reads: EFFECTIVE AUGUST.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-02-14145422
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,817 bbl$103,870
GasProduction138,847 Mcf$553,029
Total$656,899

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2709, -94.1780. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.27089, -94.17802 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
100.0%
1 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,850 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
1100.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
00.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,850 ft.

Completions filed
Sep 2008
1 of 1 wells

1 well

42-365346522 L9,850 ftSep 2008Yes

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (85)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

85 months

Sep 200800101.767.88$0
Aug 200800114.228.48$0
Jul 2008010131.0811.39$114
Jun 2008022131.3313.03$287
May 2008041123.1711.57$475
Apr 2008032110.3110.45$335
Mar 2008065101.909.66$628
Feb 200802992.538.77$254
Jan 200803790.388.21$304
Dec 200706388.337.30$460
Nov 2007362391.677.29$3,468
Oct 200704382.856.92$298
Sep 200703575.846.24$219
Aug 2007512169.066.39$3,656
Jul 200706170.906.39$390
Jun 2007674462.007.55$4,486
May 2007163958.747.85$1,246
Apr 200714559.617.81$411
Mar 200705156.927.30$372
Feb 2007254955.108.22$1,780
Jan 2007746150.306.73$4,133
Dec 20062215656.656.92$12,907
Nov 20061245154.207.62$7,109
Oct 2006694954.906.01$4,083
Sep 2006452260.085.04$2,814
Aug 2006422168.717.34$3,040
Jul 2006212669.376.34$1,622
Jun 200682266.286.38$671
May 20069066.016.42$594
Apr 2006461964.397.36$3,102
Mar 200604456.707.08$312
Feb 20065057.597.75$288
Jan 200661660.598.93$506
Dec 20050054.9413.42$0
Nov 2005101654.6910.59$716
Oct 200531658.3413.80$396
Sep 20050761.4512.08$85
Aug 20051061.519.80$62
Jul 20050055.697.84$0
Jun 2005141752.337.38$858
May 2005601345.226.65$2,800
Apr 2005487049.207.36$2,877
Mar 2005686550.377.15$3,890
Feb 200531145.226.31$205
Jan 2005184143.166.32$1,036
Dec 2004195,42639.866.75$37,389
Nov 200486,40445.286.33$40,902
Oct 200411549.706.52$147
Sep 20041529643.245.28$2,213
Aug 2004215,02142.375.55$28,760
Jul 20041113,83138.286.08$84,571
Jun 20044036.106.43$144
May 2004261437.486.49$4,063
Apr 20040034.475.86$0
Mar 20043034.365.53$103
Feb 2004840632.455.51$2,497
Jan 20040032.036.30$0
Dec 200319030.266.30$575
Nov 200311388328.804.60$7,312
Oct 200314167528.174.76$7,185
Sep 20038581526.314.75$6,107
Aug 20032176729.765.13$4,559
Jul 20033187729.415.17$5,447
Jun 20035289628.565.98$6,846
May 20032947026.595.97$3,578
Apr 20031792626.675.41$5,461
Mar 2003391,84431.146.10$12,456
Feb 200312,38633.487.93$18,945
Jan 200322,87030.315.58$16,081
Dec 200213,49226.914.85$16,976
Nov 200213,43724.664.14$14,243
Oct 200214,77726.464.23$20,229
Sep 200214,29627.443.64$15,644
Aug 200214,29825.963.16$13,626
Jul 200214,16424.583.06$12,774
Jun 2002773,00523.733.34$11,859
May 20021992,33024.663.58$13,258
Apr 20020023.653.51$0
Mar 20021056,07522.003.10$21,159
Feb 20021076,78818.222.38$18,076
Jan 2002919,10417.172.38$23,191
Dec 200118110,00816.932.36$26,727
Nov 200118510,71018.072.41$29,106
Oct 200113316,85219.782.53$45,247
Sep 200102,73624.262.25$6,160

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jul 2008 — as filed, then multipliedworked
Condensate             0 bbl  × $131.08 =         $0
Gas                   10 Mcf  × $ 11.39 =       $114

────────────────────────────────────────────────────
Month total                                     $114

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/185216 is the state's own key, not one this site invented.