SUMMERS, J.W. GU 1

Operated by GREAT AMERICAN RESOURCES INC. (P-5 328354) in the REKLAW (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 186298District 06Field 758396252 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.9 M
Nov 2001 – May 2026
Value, last 12 filed months
$5 k
at the published price for each month
Months reported
295
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 93 leases and 93 wells, and the rule below applies to all of them.

Discovered
1979-12-10
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2006-01-10.

The Commission's schedule remark for this field reads: #06-0244735. ALLOCATION FORMULA REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112002-09-27149302
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,758 bbl$84,517
GasProduction311,207 Mcf$1,825,151
Total$1,909,668

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7890, -94.9992. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,200 ft.

Completions filed
Nov 2001
1 of 1 wells

1 well

42-07331005110,200 ftNov 2001

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (295)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

295 months

May 2026050106.413.05$152
Apr 2026010098.932.87$287
Mar 202605089.753.15$157
Feb 2026010063.503.75$375
Jan 2026010059.138.00$800
Dec 2025010056.664.41$441
Nov 2025010058.593.93$393
Oct 20251310059.383.30$1,102
Sep 2025012262.743.08$375
Aug 2025010163.933.01$304
Jul 202505366.743.32$176
Jun 202502566.483.13$78
May 202502760.553.23$87
Apr 202501862.363.54$64
Mar 2025010967.704.27$465
Feb 2025012970.884.34$560
Jan 2025014974.324.28$638
Dec 2024015668.993.12$487
Nov 2024013469.052.20$295
Oct 2024012171.372.28$276
Sep 2024010169.612.36$239
Aug 2024010575.632.06$217
Jul 2024010079.932.15$215
Jun 2024016378.082.63$429
May 2024022978.812.20$503
Apr 2024024584.451.66$407
Mar 2024028880.301.55$445
Feb 2024044876.091.78$799
Jan 2024016273.023.30$534
Dec 2023010671.262.61$277
Nov 2023010477.892.81$292
Oct 2023024385.443.09$750
Sep 2023010189.042.74$276
Aug 2023034780.522.67$927
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 202329778.122.24$373
Mar 20231155072.852.39$2,118
Feb 2023316575.112.47$632
Jan 2023726376.533.39$1,427
Dec 202275276.415.73$833
Nov 20221185.005.65$91
Oct 202213587.185.86$292
Sep 2022012684.888.16$1,029
Aug 2022029094.529.13$2,647
Jul 202200101.587.54$0
Jun 202201,032115.097.98$8,232
May 202200109.378.43$0
Apr 20220208104.226.84$1,422
Mar 20220192108.885.08$975
Feb 20222315691.054.86$2,852
Jan 2022015481.844.54$699
Dec 2021016871.323.90$655
Nov 20211421177.435.24$2,189
Oct 2021017279.795.71$983
Sep 20211514569.865.35$1,824
Aug 202109866.024.22$414
Jul 202106370.783.98$251
Jun 2021145569.493.38$1,159
May 2021032163.483.02$969
Apr 20211327360.362.76$1,538
Mar 20211132261.302.72$1,549
Feb 2021010657.805.55$588
Jan 20211844450.412.81$2,155
Dec 202004544.642.68$120
Nov 2020017738.772.71$479
Oct 202001636.972.48$40
Sep 202002137.091.99$42
Aug 202004239.982.39$100
Jul 202004738.371.83$86
Jun 202003134.901.69$52
May 202001816.921.81$33
Apr 20200014.751.80$0
Mar 202001030.341.86$19
Feb 202001049.881.98$20
Jan 202002257.252.09$46
Dec 201901959.012.30$44
Nov 201901955.302.75$52
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 201901653.112.30$37
Jul 201923356.272.46$194
Jun 201908052.782.49$199
May 201905258.482.74$143
Apr 20190462.632.75$11
Mar 2019015256.803.06$465
Feb 201917250.852.79$252
Jan 201907446.033.23$239
Dec 201837446.594.19$449
Nov 201807752.934.24$326
Oct 201808261.443.40$279
Sep 201801059.543.11$31
Aug 201801559.403.07$46
Jul 201807265.142.93$211
Jun 201802960.183.08$89
May 201803965.382.90$113
Apr 201803063.842.90$87
Mar 201802661.222.79$72
Feb 20180061.782.77$0
Jan 201802462.874.01$96
Dec 201708457.272.92$245
Nov 201711255.423.12$93
Oct 201708849.292.98$263
Sep 201743247.523.09$289
Aug 2017024945.373.00$748
Jul 201718443.873.09$303
Jun 201702042.493.09$62
May 2017119545.373.26$809
Apr 201707147.933.21$228
Mar 201707846.772.98$233
Feb 201709850.452.95$289
Jan 201708449.413.42$287
Dec 2016015348.763.72$570
Nov 2016013042.492.64$344
Oct 201605546.193.09$170
Sep 201605541.553.10$171
Aug 20160141.442.92$3
Jul 201601141.622.92$32
Jun 20160145.352.69$3
May 201608642.521.99$171
Apr 201609136.561.99$181
Mar 2016179133.011.79$724
Feb 201609126.472.06$188
Jan 20160127.352.36$2
Dec 20150032.362.00$0
Nov 201501438.792.17$30
Oct 201511043.552.43$479
Sep 201517142.992.76$734
Aug 20150140.162.87$3
Jul 20150048.152.95$0
Jun 20150156.152.88$3
May 201501155.212.96$33
Apr 201501849.822.71$49
Mar 201501642.892.93$47
Feb 2015069144.662.98$2,057
Jan 2015069243.433.10$2,146
Dec 2014065154.693.59$2,338
Nov 201401,03970.464.25$4,418
Oct 201403,89178.303.90$15,179
Sep 201411,09686.164.05$4,520
Aug 2014041189.394.04$1,658
Jul 2014066096.564.18$2,759
Jun 2014273098.164.74$3,654
May 2014084094.734.73$3,970
Apr 2014093495.944.81$4,492
Mar 2014043795.895.06$2,210
Feb 2014049297.406.19$3,046
Jan 2014020990.404.86$1,016
Dec 2013132691.824.35$1,511
Nov 201301,29588.853.74$4,841
Oct 2013046397.423.78$1,750
Sep 20138519104.113.72$2,762
Aug 20130521104.253.52$1,835
Jul 201318461102.523.72$3,559
Jun 2013028694.403.93$1,125
May 2013047994.834.15$1,987
Apr 20131767493.964.28$4,484
Mar 2013054493.623.91$2,129
Feb 20131648391.233.42$3,112
Jan 2013047191.603.42$1,611
Dec 2012047986.773.42$1,638
Nov 2012052086.953.62$1,885
Oct 2012068889.383.40$2,339
Sep 2012051194.672.92$1,491
Aug 2012074592.662.91$2,167
Jul 2012037985.133.02$1,145
Jun 2012034679.822.52$872
May 2012072791.612.49$1,809
Apr 20120874101.652.00$1,745
Mar 20120895105.052.22$1,989
Feb 201205,448101.102.57$14,003
Jan 2012079098.092.73$2,160
Dec 2011060896.873.24$1,970
Nov 2011075095.723.31$2,483
Oct 201101,15184.983.65$4,199
Sep 201101,18283.623.99$4,711
Aug 201101,05783.404.15$4,386
Jul 2011097094.144.52$4,382
Jun 2011099992.904.64$4,635
May 2011255798.134.40$2,650
Apr 201103105.964.33$13
Mar 201101596.364.06$61
Feb 201110885.644.18$890
Jan 201101786.504.59$78
Dec 201002185.734.35$91
Nov 201001280.843.80$46
Oct 20100178.103.51$4
Sep 20101731672.633.98$2,492
Aug 2010059573.684.42$2,630
Jul 2010063872.554.74$3,022
Jun 201001,09270.364.91$5,362
May 20102392771.124.24$5,562
Apr 2010092281.694.12$3,801
Mar 201001,01678.394.39$4,459
Feb 20101479773.585.44$5,368
Jan 2010077174.365.96$4,598
Dec 2009091871.445.48$5,034
Nov 2009060374.593.75$2,262
Oct 2009078572.544.11$3,227
Sep 2009068065.543.06$2,084
Aug 2009168567.423.22$2,272
Jul 2009067961.133.46$2,352
Jun 2009027866.163.90$1,083
May 200921154.743.93$153
Apr 2009031146.773.59$1,116
Mar 2009043142.144.06$1,749
Feb 2009942132.814.63$2,246
Jan 2009048135.865.37$2,583
Dec 20081936737.105.98$2,899
Nov 2008041355.496.86$2,833
Oct 20082538675.246.92$4,553
Sep 20080321101.767.88$2,529
Aug 20080849114.228.48$7,202
Jul 200819438131.0811.39$7,479
Jun 20080521131.3313.03$6,790
May 20080675123.1711.57$7,813
Apr 20080648110.3110.45$6,775
Mar 200819749101.909.66$9,174
Feb 2008084292.538.77$7,385
Jan 2008092890.388.21$7,615
Dec 2007090888.337.30$6,630
Nov 2007090591.677.29$6,599
Oct 200701,21882.856.92$8,431
Sep 2007251,11675.846.24$8,864
Aug 200701,39069.066.39$8,879
Jul 2007173,28470.906.39$22,183
Jun 200701,92762.007.55$14,546
May 200703,88858.747.85$30,506
Apr 2007152,32659.617.81$19,049
Mar 200702,57956.927.30$18,832
Feb 200743,45355.108.22$28,590
Jan 200752,68750.306.73$18,327
Dec 200673,66656.656.92$25,760
Nov 200643,47754.207.62$26,703
Oct 2006113,60754.906.01$22,296
Sep 2006142,83560.085.04$15,122
Aug 200603,59468.717.34$26,380
Jul 2006203,25069.376.34$22,001
Jun 200603,70166.286.38$23,627
May 200693,82666.016.42$25,176
Apr 2006123,23264.397.36$24,562
Mar 2006133,31056.707.08$24,182
Feb 2006123,80557.597.75$30,184
Jan 2006363,67660.598.93$35,020
Dec 200563,38454.9413.42$45,727
Nov 200573,50754.6910.59$37,516
Oct 2005193,70858.3413.80$52,263
Sep 2005352,94261.4512.08$37,687
Aug 200513,41361.519.80$33,498
Jul 200533,62955.697.84$28,632
Jun 200534,08952.337.38$30,338
May 200583,90145.226.65$26,308
Apr 200552,73049.207.36$20,340
Mar 200524,98850.377.15$35,789
Feb 200582,54245.226.31$16,407
Jan 2005114,23343.166.32$27,237
Dec 2004353,25439.866.75$23,363
Nov 2004353,33445.286.33$22,690
Oct 2004333,85249.706.52$26,736
Sep 2004364,39643.245.28$24,785
Aug 2004333,40942.375.55$20,320
Jul 2004435,72038.286.08$36,448
Jun 2004304,78536.106.43$31,865
May 2004631,26737.486.49$10,590
Apr 2004402,97734.475.86$18,819
Mar 2004403,81834.365.53$22,488
Feb 2004183,12632.455.51$17,807
Jan 2004113,78032.036.30$24,165
Dec 200375,21130.266.30$33,050
Nov 2003124,10028.804.60$19,186
Oct 2003205,90728.174.76$28,679
Sep 2003264,02526.314.75$19,800
Aug 2003503,76929.765.13$20,822
Jul 2003732,63329.415.17$15,762
Jun 2003322,40528.565.98$15,303
May 2003502,61826.595.97$16,966
Apr 20036991226.675.41$6,772
Mar 20036697431.146.10$7,993
Feb 2003767,90333.487.93$65,183
Jan 2003816,94530.315.58$41,222
Dec 2002231,13926.914.85$6,147
Nov 200201,93424.664.14$8,001
Oct 200201,41126.464.23$5,967
Sep 2002040727.443.64$1,480
Aug 2002041225.963.16$1,304
Jul 2002074824.583.06$2,290
Jun 200203,21823.733.34$10,742
May 200202,58524.663.58$9,265
Apr 200201,02923.653.51$3,614
Mar 200202,34422.003.10$7,273
Feb 200204,39518.222.38$10,441
Jan 200204,79517.172.38$11,391
Dec 200106,23316.932.36$14,737
Nov 200105,62318.072.41$13,526

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                   50 Mcf  × $  3.05 =       $152

────────────────────────────────────────────────────
Month total                                     $152

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/186298 is the state's own key, not one this site invented.