RAMPY, H. R.

Operated by MCGOWAN WORKING PARTNERS, INC. (P-5 549836) in the CAYUGA (TRINITY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 198427District 06Field 16481426CondensateGasSaveExport
Value, all time
$2.9 M
May 2003 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
277
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 53 leases and 61 wells, and the rule below applies to all of them.

Discovered
1935-10-02
as the register files it
Field class
Oil and gas
the register's own label
Between wells
1,320 ft
minimum
From a lease line
660 ft
minimum

A drilling unit in this field needs at least 80 acres.

The Commission's schedule remark for this field reads: ALLOCATION FORMULA SUSPENDED ADMINISTRATIVELY EFF. 5-1-95.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition3,344 bbl$223,223
GasProduction467,744 Mcf$2,688,422
Total$2,911,645

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.9544, -95.9894. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.95444, -95.98938 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,050 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,050 ft.

Completions filed
May 2003
1 of 1 wells

1 well

42-001322392 D10,050 ftMay 2003

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (277)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

277 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20180059.543.11$0
Aug 20180059.403.07$0
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 2017092945.373.00$2,791
Jul 2017090543.873.09$2,794
Jun 201701,06342.493.09$3,282
May 201701,13545.373.26$3,704
Apr 201701,11447.933.21$3,578
Mar 201701,14646.772.98$3,419
Feb 201701,03850.452.95$3,065
Jan 201701,11049.413.42$3,795
Dec 201601,10748.763.72$4,121
Nov 201601,03042.492.64$2,724
Oct 201601,13046.193.09$3,492
Sep 201601,07441.553.10$3,330
Aug 201601,13941.442.92$3,331
Jul 201601,07141.622.92$3,132
Jun 201601,05045.352.69$2,820
May 201601,03542.521.99$2,061
Apr 201601,18836.561.99$2,365
Mar 201601,34133.011.79$2,406
Feb 201601,40426.472.06$2,897
Jan 201601,96027.352.36$4,634
Dec 201501,82432.362.00$3,651
Nov 201502,01238.792.17$4,361
Oct 201501,94043.552.43$4,708
Sep 201501,15842.992.76$3,194
Aug 201501,22340.162.87$3,513
Jul 2015082548.152.95$2,430
Jun 2015087156.152.88$2,511
May 2015093255.212.96$2,754
Apr 201501,24549.822.71$3,370
Mar 201501,07242.892.93$3,146
Feb 201501,18444.662.98$3,524
Jan 201501,04343.433.10$3,234
Dec 201401,01654.693.59$3,649
Nov 2014036270.464.25$1,539
Oct 2014094178.303.90$3,671
Sep 2014092186.164.05$3,726
Aug 2014090689.394.04$3,656
Jul 2014085496.564.18$3,569
Jun 201401,09598.164.74$5,187
May 2014097494.734.73$4,604
Apr 2014090895.944.81$4,367
Mar 201401,32395.895.06$6,690
Feb 201401,19997.406.19$7,424
Jan 201401,10790.404.86$5,381
Dec 201301,11191.824.35$4,838
Nov 201301,09388.853.74$4,086
Oct 201301,03197.423.78$3,897
Sep 201301,012104.113.72$3,762
Aug 20130947104.253.52$3,336
Jul 20130958102.523.72$3,562
Jun 2013038494.403.93$1,510
May 2013085694.834.15$3,552
Apr 2013097393.964.28$4,167
Mar 201301,00593.623.91$3,932
Feb 2013079891.233.42$2,729
Jan 2013085291.603.42$2,914
Dec 2012090386.773.42$3,088
Nov 2012092986.953.62$3,368
Oct 2012068689.383.40$2,332
Sep 201201,80194.672.92$5,256
Aug 201202,50492.662.91$7,282
Jul 201201,22885.133.02$3,710
Jun 2012067379.822.52$1,695
May 201201,28891.612.49$3,205
Apr 201201,247101.652.00$2,490
Mar 201221,227105.052.22$2,937
Feb 2012182,016101.102.57$7,001
Jan 2012394,58498.092.73$16,359
Dec 2011283,78396.873.24$14,968
Nov 2011313,34295.723.31$14,034
Oct 2011313,64484.983.65$15,930
Sep 2011253,43083.623.99$15,762
Aug 2011313,63883.404.15$17,681
Jul 2011233,55094.144.52$18,201
Jun 2011373,45392.904.64$19,459
May 2011404,06898.134.40$21,844
Apr 2011342,822105.964.33$15,831
Mar 2011271,96396.364.06$10,566
Feb 2011271,69885.644.18$9,410
Jan 2011222,54386.504.59$13,572
Dec 2010333,36485.734.35$17,455
Nov 2010243,26180.843.80$14,317
Oct 2010784378.103.51$3,505
Sep 201004072.633.98$159
Aug 201005673.684.42$247
Jul 201007972.554.74$374
Jun 2010011570.364.91$565
May 201005271.124.24$220
Apr 201003981.694.12$161
Mar 201015078.394.39$1,176
Feb 2010551,95073.585.44$14,660
Jan 2010573,45174.365.96$24,821
Dec 2009784,00571.445.48$27,535
Nov 2009594,04374.593.75$19,568
Oct 2009934,22772.544.11$24,120
Sep 2009574,12365.543.06$16,372
Aug 2009654,51267.423.22$18,904
Jul 2009633,95661.133.46$17,557
Jun 2009443,62666.163.90$17,034
May 2009473,87954.743.93$17,801
Apr 2009693,81646.773.59$16,917
Mar 2009694,59742.144.06$21,567
Feb 2009624,21132.814.63$21,544
Jan 2009724,81335.865.37$28,433
Dec 2008574,88237.105.98$31,295
Nov 2008534,65755.496.86$34,890
Oct 2008585,13675.246.92$39,915
Sep 2008474,537101.767.88$40,521
Aug 2008605,248114.228.48$51,372
Jul 2008575,501131.0811.39$70,125
Jun 2008595,425131.3313.03$78,450
May 2008645,826123.1711.57$75,315
Apr 2008735,898110.3110.45$69,715
Mar 2008695,512101.909.66$60,299
Feb 2008575,55592.538.77$53,995
Jan 2008696,36890.388.21$58,490
Dec 2007587,26988.337.30$58,201
Nov 2007184,90891.677.29$37,438
Oct 2007018082.856.92$1,246
Sep 2007017575.846.24$1,093
Aug 2007017969.066.39$1,143
Jul 2007022470.906.39$1,431
Jun 2007019662.007.55$1,480
May 2007030158.747.85$2,362
Apr 2007036959.617.81$2,880
Mar 2007035356.927.30$2,578
Feb 2007043755.108.22$3,590
Jan 2007039250.306.73$2,637
Dec 2006025556.656.92$1,764
Nov 2006029154.207.62$2,217
Oct 2006030254.906.01$1,816
Sep 2006031660.085.04$1,592
Aug 2006020268.717.34$1,483
Jul 2006021869.376.34$1,383
Jun 2006028166.286.38$1,794
May 2006020566.016.42$1,317
Apr 2006017664.397.36$1,295
Mar 2006032756.707.08$2,316
Feb 2006097357.597.75$7,542
Jan 200601,22760.598.93$10,961
Dec 200501,42654.9413.42$19,130
Nov 200501,02754.6910.59$10,874
Oct 200501,07058.3413.80$14,761
Sep 2005088161.4512.08$10,642
Aug 200501,14461.519.80$11,208
Jul 200521,99855.697.84$15,783
Jun 2005253,74152.337.38$28,921
May 2005527,43945.226.65$51,829
Apr 2005528,03649.207.36$61,707
Mar 2005728,63750.377.15$65,423
Feb 2005396,99845.226.31$45,934
Jan 2005728,43743.166.32$56,448
Dec 2004738,54339.866.75$60,584
Nov 2004678,92745.286.33$59,545
Oct 2004529,74449.706.52$66,068
Sep 2004619,70443.245.28$53,913
Aug 2004599,74842.375.55$56,608
Jul 20047010,10738.286.08$64,172
Jun 20048011,19636.106.43$74,912
May 20047610,87037.486.49$73,445
Apr 20047511,33634.475.86$68,997
Mar 20047311,99234.365.53$68,826
Feb 200410710,39232.455.51$60,728
Jan 20045411,99032.036.30$77,262
Dec 2003013,34630.266.30$84,102
Nov 2003013,71228.804.60$63,009
Oct 20030028.174.76$0
Sep 20030026.314.75$0
Aug 20030029.765.13$0
Jul 20030029.415.17$0
Jun 20030028.565.98$0
May 20030026.595.97$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Aug 2017 — as filed, then multipliedworked
Condensate             0 bbl  × $ 45.37 =         $0
Gas                  929 Mcf  × $  3.00 =     $2,791

────────────────────────────────────────────────────
Month total                                   $2,791

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/198427 is the state's own key, not one this site invented.