Operated by TEXIAN OPERATING COMPANY, LLC (P-5 848681) in the DOUGLASS, W. (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 201345District 06Field 258644712 tax incentive programmesCondensateGasSaveExport
Value, all time
$5.5 M
Mar 2004 – May 2026
Value, last 12 filed months
$27 k
at the published price for each month
Months reported
267
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 423 leases and 423 wells, and the rule below applies to all of them.

Discovered
1973-06-01
as the register files it
Field class
Gas
the register's own label
Between wells
467 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 80 acres. The field rule took effect on 2008-11-12.

The Commission's schedule remark for this field reads: AND NACOGDOCHES, E. (JAMES LIME).

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112004-11-19157893
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition899 bbl$49,254
GasProduction926,614 Mcf$5,419,981
Total$5,469,235

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.6728, -94.7448. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.67283, -94.74480 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,694 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,694 ft.

1 well

42-34731844510,694 ft

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (267)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

267 months

May 20260599106.413.05$1,824
Apr 2026061298.932.87$1,756
Mar 2026050189.753.15$1,578
Feb 2026059663.503.75$2,235
Jan 2026058759.138.00$4,695
Dec 2025067556.664.41$2,979
Nov 2025070758.593.93$2,776
Oct 2025061959.383.30$2,046
Sep 2025062862.743.08$1,932
Aug 2025047863.933.01$1,441
Jul 2025072466.743.32$2,400
Jun 2025050366.483.13$1,574
May 2025029960.553.23$966
Apr 20250062.363.54$0
Mar 2025047767.704.27$2,036
Feb 2025061670.884.34$2,674
Jan 2025053374.324.28$2,281
Dec 2024059268.993.12$1,848
Nov 2024019169.052.20$420
Oct 2024082971.372.28$1,891
Sep 2024064869.612.36$1,532
Aug 2024095975.632.06$1,979
Jul 20241743779.932.15$2,297
Jun 2024093078.082.63$2,450
May 202401,17178.812.20$2,574
Apr 2024097784.451.66$1,621
Mar 202401,02180.301.55$1,578
Feb 2024085176.091.78$1,518
Jan 2024089273.023.30$2,942
Dec 202301,02171.262.61$2,666
Nov 202301,00477.892.81$2,819
Oct 202301,00085.443.09$3,087
Sep 2023099389.042.74$2,716
Aug 202301,02980.522.67$2,750
Jul 202301,04574.852.64$2,761
Jun 202301,00168.962.26$2,261
May 202301,03770.622.23$2,310
Apr 202301,10578.122.24$2,473
Mar 202301,15572.852.39$2,764
Feb 202311,01875.112.47$2,585
Jan 202301,12676.533.39$3,815
Dec 202201,08576.415.73$6,216
Nov 2022083985.005.65$4,737
Oct 2022096187.185.86$5,635
Sep 2022098384.888.16$8,025
Aug 202201,09694.529.13$10,003
Jul 202201,064101.587.54$8,025
Jun 20220956115.097.98$7,626
May 20220989109.378.43$8,340
Apr 20220999104.226.84$6,831
Mar 202201,119108.885.08$5,680
Feb 202211,02491.054.86$5,067
Jan 202201,09681.844.54$4,973
Dec 202101,04971.323.90$4,090
Nov 202101,07777.435.24$5,640
Oct 2021086179.795.71$4,920
Sep 202101,05469.865.35$5,640
Aug 202101,19166.024.22$5,027
Jul 20212999170.783.98$5,999
Jun 202101,01869.493.38$3,441
May 202101,13563.483.02$3,425
Apr 202101,16460.362.76$3,211
Mar 202101,23161.302.72$3,345
Feb 2021094857.805.55$5,259
Jan 202101,10450.412.81$3,103
Dec 202001,16344.642.68$3,112
Nov 202001,13338.772.71$3,067
Oct 202001,15736.972.48$2,868
Sep 202001,09737.091.99$2,184
Aug 202001,10839.982.39$2,643
Jul 202001,16938.371.83$2,134
Jun 202001,08834.901.69$1,839
May 202001,08616.921.81$1,971
Apr 202001,10414.751.80$1,992
Mar 2020141,16530.341.86$2,587
Feb 202001,06649.881.98$2,111
Jan 202001,25557.252.09$2,629
Dec 201901,16259.012.30$2,678
Nov 201901,21055.302.75$3,328
Oct 201901,32253.472.42$3,197
Sep 201901,16755.052.66$3,101
Aug 201911,27153.112.30$2,982
Jul 201901,28556.272.46$3,161
Jun 201901,26452.782.49$3,149
May 201901,34058.482.74$3,672
Apr 201901,33662.632.75$3,675
Mar 201901,42656.803.06$4,367
Feb 201901,34150.852.79$3,744
Jan 201901,32246.033.23$4,268
Dec 201801,15746.594.19$4,843
Nov 201801,28452.934.24$5,441
Oct 201801,64261.443.40$5,580
Sep 2018028259.543.11$876
Aug 201801,55459.403.07$4,765
Jul 2018089265.142.93$2,615
Jun 2018079660.183.08$2,449
May 201801,37565.382.90$3,989
Apr 201801,20763.842.90$3,501
Mar 201801,47961.222.79$4,122
Feb 201801,16161.782.77$3,211
Jan 201801,42562.874.01$5,713
Dec 201701,45457.272.92$4,248
Nov 201701,43455.423.12$4,472
Oct 201701,54249.292.98$4,601
Sep 201701,46047.523.09$4,507
Aug 201701,51445.373.00$4,549
Jul 201701,51543.873.09$4,677
Jun 201701,53642.493.09$4,742
May 201701,60145.373.26$5,225
Apr 201701,58947.933.21$5,103
Mar 201701,61546.772.98$4,819
Feb 201701,44850.452.95$4,275
Jan 201761,48649.413.42$5,377
Dec 201601,59148.763.72$5,923
Nov 201601,58842.492.64$4,199
Oct 201601,65846.193.09$5,124
Sep 201601,64341.553.10$5,094
Aug 201601,73841.442.92$5,083
Jul 201601,80641.622.92$5,281
Jun 201601,77545.352.69$4,767
May 201601,81542.521.99$3,614
Apr 201601,75436.561.99$3,492
Mar 201601,82533.011.79$3,274
Feb 201601,69426.472.06$3,496
Jan 201601,78427.352.36$4,218
Dec 201501,79732.362.00$3,597
Nov 201501,77238.792.17$3,841
Oct 201501,86843.552.43$4,533
Sep 201501,80042.992.76$4,965
Aug 201501,56740.162.87$4,501
Jul 201501,68548.152.95$4,962
Jun 201501,81956.152.88$5,244
May 201501,94555.212.96$5,748
Apr 201501,86849.822.71$5,056
Mar 201501,94742.892.93$5,714
Feb 201501,76444.662.98$5,250
Jan 2015251,97143.433.10$7,197
Dec 201401,99354.693.59$7,158
Nov 201401,96770.464.25$8,363
Oct 201401,69378.303.90$6,604
Sep 201401,79686.164.05$7,266
Aug 201401,86789.394.04$7,534
Jul 201401,91696.564.18$8,008
Jun 201401,90898.164.74$9,038
May 201402,05294.734.73$9,699
Apr 201402,01795.944.81$9,700
Mar 2014262,12295.895.06$13,224
Feb 201401,36897.406.19$8,471
Jan 201401,72990.404.86$8,404
Dec 201301,79091.824.35$7,795
Nov 201301,71888.853.74$6,422
Oct 201301,73597.423.78$6,557
Sep 201301,785104.113.72$6,636
Aug 201301,896104.253.52$6,679
Jul 201301,868102.523.72$6,945
Jun 201301,90494.403.93$7,489
May 201302,05094.834.15$8,506
Apr 201302,02793.964.28$8,681
Mar 201302,06093.623.91$8,061
Feb 201302,03691.233.42$6,963
Jan 201302,30791.603.42$7,890
Dec 201202,16386.773.42$7,398
Nov 201202,20686.953.62$7,997
Oct 201202,34289.383.40$7,962
Sep 201202,31794.672.92$6,762
Aug 2012262,47092.662.91$9,592
Jul 201202,41285.133.02$7,286
Jun 201202,17079.822.52$5,466
May 201202,82991.612.49$7,039
Apr 201202,341101.652.00$4,675
Mar 201202,443105.052.22$5,429
Feb 201202,290101.102.57$5,886
Jan 201202,22598.092.73$6,083
Dec 201101,61496.873.24$5,229
Nov 201101,71595.723.31$5,679
Oct 201102,06884.983.65$7,545
Sep 201102,49183.623.99$9,929
Aug 201103,26883.404.15$13,560
Jul 201103,18994.144.52$14,405
Jun 201103,27092.904.64$15,172
May 201103,29598.134.40$14,514
Apr 201102,221105.964.33$9,624
Mar 201103,01796.364.06$12,241
Feb 201102,84285.644.18$11,880
Jan 201103,21386.504.59$14,744
Dec 201003,29785.734.35$14,335
Nov 201003,19780.843.80$12,134
Oct 201003,47578.103.51$12,193
Sep 2010293,03872.633.98$14,196
Aug 201003,24673.684.42$14,345
Jul 201003,29172.554.74$15,588
Jun 201013,26270.364.91$16,088
May 201003,44271.124.24$14,578
Apr 201002,71381.694.12$11,185
Mar 201003,34478.394.39$14,676
Feb 201002,91773.585.44$15,875
Jan 201003,54474.365.96$21,137
Dec 200903,51971.445.48$19,297
Nov 200903,55474.593.75$13,333
Oct 200903,79972.544.11$15,615
Sep 200903,72865.543.06$11,425
Aug 200903,91667.423.22$12,604
Jul 2009283,92461.133.46$15,306
Jun 200903,86066.163.90$15,035
May 200904,06254.743.93$15,946
Apr 200904,02446.773.59$14,436
Mar 200904,20142.144.06$17,052
Feb 200903,81732.814.63$17,684
Jan 200904,20435.865.37$22,580
Dec 200804,37637.105.98$26,156
Nov 200804,40755.496.86$30,234
Oct 200804,62475.246.92$32,007
Sep 200894,463101.767.88$36,071
Aug 200804,416114.228.48$37,461
Jul 200814,718131.0811.39$53,866
Jun 200814,389131.3313.03$57,332
May 200814,788123.1711.57$55,541
Apr 200824,717110.3110.45$49,536
Mar 2008174,956101.909.66$49,627
Feb 200804,77692.538.77$41,888
Jan 200804,99090.388.21$40,947
Dec 200704,03588.337.30$29,463
Nov 200714,94591.677.29$36,149
Oct 200715,42882.856.92$37,655
Sep 200705,28975.846.24$33,025
Aug 200715,68869.066.39$36,404
Jul 2007255,41970.906.39$36,389
Jun 200715,35862.007.55$40,507
May 200715,71458.747.85$44,892
Apr 200715,30359.617.81$41,451
Mar 200715,84056.927.30$42,700
Feb 200705,61355.108.22$46,116
Jan 200716,32150.306.73$42,571
Dec 2006326,45356.656.92$46,457
Nov 200616,25954.207.62$47,732
Oct 200606,66154.906.01$40,058
Sep 200616,61060.085.04$33,356
Aug 2006257,08868.717.34$53,743
Jul 200607,18269.376.34$45,554
Jun 200607,17266.286.38$45,785
May 200617,52266.016.42$48,395
Apr 200617,90764.397.36$58,264
Mar 2006227,71756.707.08$55,906
Feb 200617,46057.597.75$57,881
Jan 200618,51860.598.93$76,155
Dec 2005398,62454.9413.42$117,837
Nov 200508,72554.6910.59$92,384
Oct 200509,34758.3413.80$128,949
Sep 2005449,15361.4512.08$113,263
Aug 200509,64661.519.80$94,500
Jul 20053710,48555.697.84$84,301
Jun 2005010,51552.337.38$77,612
May 2005010,98145.226.65$73,036
Apr 20052011,13149.207.36$82,914
Mar 2005012,36350.377.15$88,456
Feb 20053511,43345.226.31$73,747
Jan 20055113,46043.166.32$87,298
Dec 2004014,27739.866.75$96,385
Nov 20045515,08845.286.33$98,004
Oct 2004017,12249.706.52$111,552
Sep 20044717,96443.245.28$96,952
Aug 2004021,06742.375.55$116,936
Jul 20048924,52538.286.08$152,621
Jun 2004028,34136.106.43$182,318
May 20049232,65637.486.49$215,535
Apr 20043245,87934.475.86$269,883
Mar 2004525,14234.365.53$139,211

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  599 Mcf  × $  3.05 =     $1,824

────────────────────────────────────────────────────
Month total                                   $1,824

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/201345 is the state's own key, not one this site invented.