GARRISON GAS UNIT 3

Operated by MAG EXPLORATION LLC (P-5 102971) in the GARRISON (TRAVIS PEAK) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 206308District 06Field 34044800CondensateGasSaveExport
Value, all time
$560 k
Jan 2004 – May 2026
Value, last 12 filed months
$16
at the published price for each month
Months reported
269
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 93 leases and 93 wells, and the rule below applies to all of them.

Discovered
1975-06-21
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2007-03-06.

The Commission's schedule remark for this field reads: DOCKET #06-0250025.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition1,364 bbl$99,895
GasProduction84,864 Mcf$459,857
Total$559,752

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.8291, -94.4490. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.82907, -94.44897 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,529 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,529 ft.

Completions filed
Jan 2004
1 of 1 wells

1 well

42-34730121110,529 ftJan 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (269)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

269 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250566.483.13$16
May 20250060.553.23$0
Apr 20250262.363.54$7
Mar 20250967.704.27$38
Feb 20250570.884.34$22
Jan 20250974.324.28$39
Dec 202401468.993.12$44
Nov 202402369.052.20$51
Oct 202401071.372.28$23
Sep 202401069.612.36$24
Aug 202407575.632.06$155
Jul 202409279.932.15$197
Jun 2024014178.082.63$371
May 202406378.812.20$139
Apr 2024017284.451.66$285
Mar 2024016080.301.55$247
Feb 2024017976.091.78$319
Jan 2024028273.023.30$930
Dec 20230971.262.61$24
Nov 202302177.892.81$59
Oct 202302585.443.09$77
Sep 202309589.042.74$260
Aug 202306980.522.67$184
Jul 2023056474.852.64$1,490
Jun 202307268.962.26$163
May 2023016370.622.23$363
Apr 2023023178.122.24$517
Mar 2023010972.852.39$261
Feb 202307275.112.47$178
Jan 202309576.533.39$322
Dec 2022016176.415.73$922
Nov 202207485.005.65$418
Oct 202205987.185.86$346
Sep 2022014684.888.16$1,192
Aug 202208994.529.13$812
Jul 20220161101.587.54$1,214
Jun 20226090115.097.98$7,623
May 20220169109.378.43$1,425
Apr 20220191104.226.84$1,306
Mar 2022085108.885.08$431
Feb 2022017191.054.86$831
Jan 202208381.844.54$377
Dec 2021020871.323.90$811
Nov 2021010377.435.24$539
Oct 2021020679.795.71$1,177
Sep 202109169.865.35$487
Aug 2021010266.024.22$431
Jul 2021020070.783.98$796
Jun 202104369.493.38$145
May 2021019063.483.02$573
Apr 202109060.362.76$248
Mar 2021020261.302.72$549
Feb 2021014457.805.55$799
Jan 2021017450.412.81$489
Dec 2020016944.642.68$452
Nov 2020015038.772.71$406
Oct 2020019636.972.48$486
Sep 202009637.091.99$191
Aug 2020015439.982.39$367
Jul 202007338.371.83$133
Jun 2020013734.901.69$232
May 2020023216.921.81$421
Apr 2020016014.751.80$289
Mar 2020032830.341.86$609
Feb 202009849.881.98$194
Jan 2020015557.252.09$325
Dec 2019013059.012.30$300
Nov 2019018555.302.75$509
Oct 2019018753.472.42$452
Sep 201907855.052.66$207
Aug 2019014053.112.30$323
Jul 2019017756.272.46$435
Jun 2019016252.782.49$404
May 2019016558.482.74$452
Apr 2019017462.632.75$479
Mar 2019016856.803.06$514
Feb 2019024150.852.79$673
Jan 2019018646.033.23$600
Dec 2018024246.594.19$1,013
Nov 2018024852.934.24$1,051
Oct 2018024461.443.40$829
Sep 2018021259.543.11$659
Aug 2018057959.403.07$1,776
Jul 201809065.142.93$264
Jun 2018080760.183.08$2,483
May 2018022565.382.90$653
Apr 2018016463.842.90$476
Mar 2018018461.222.79$513
Feb 2018067861.782.77$1,875
Jan 201803462.874.01$136
Dec 201705457.272.92$158
Nov 2017022955.423.12$714
Oct 201701949.292.98$57
Sep 2017011047.523.09$340
Aug 2017010345.373.00$309
Jul 2017011143.873.09$343
Jun 20170342.493.09$9
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 2017014750.452.95$434
Jan 2017043749.413.42$1,494
Dec 2016035848.763.72$1,333
Nov 2016015542.492.64$410
Oct 2016046346.193.09$1,431
Sep 201606741.553.10$208
Aug 2016035941.442.92$1,050
Jul 2016214341.622.92$501
Jun 2016026445.352.69$709
May 2016041342.521.99$822
Apr 201605736.561.99$113
Mar 2016437933.011.79$812
Feb 201609726.472.06$200
Jan 20166915727.352.36$2,258
Dec 201549632.362.00$322
Nov 2015011138.792.17$241
Oct 2015010143.552.43$245
Sep 201504342.992.76$119
Aug 201506140.162.87$175
Jul 20150148.152.95$3
Jun 201506656.152.88$190
May 201514055.212.96$173
Apr 2015013449.822.71$363
Mar 2015015242.892.93$446
Feb 2015013944.662.98$414
Jan 201503243.433.10$99
Dec 201409554.693.59$341
Nov 2014012370.464.25$523
Oct 2014017178.303.90$667
Sep 201407286.164.05$291
Aug 20140089.394.04$0
Jul 201408096.564.18$334
Jun 201408598.164.74$403
May 201407894.734.73$369
Apr 201409495.944.81$452
Mar 20140095.895.06$0
Feb 2014011197.406.19$687
Jan 2014320390.404.86$1,258
Dec 201305691.824.35$244
Nov 201303688.853.74$135
Oct 201303097.423.78$113
Sep 2013036104.113.72$134
Aug 2013038104.253.52$134
Jul 2013047102.523.72$175
Jun 2013014894.403.93$582
May 201301794.834.15$71
Apr 2013013793.964.28$587
Mar 2013017793.623.91$693
Feb 20130091.233.42$0
Jan 2013023291.603.42$793
Dec 2012025386.773.42$865
Nov 20121691,06186.953.62$18,541
Oct 201202389.383.40$78
Sep 201205394.672.92$155
Aug 2012027292.662.91$791
Jul 2012012385.133.02$372
Jun 2012029579.822.52$743
May 2012032091.612.49$796
Apr 20120242101.652.00$483
Mar 20120118105.052.22$262
Feb 20120165101.102.57$424
Jan 201215918798.092.73$16,108
Dec 2011013796.873.24$444
Nov 20110095.723.31$0
Oct 2011031184.983.65$1,135
Sep 2011038683.623.99$1,539
Aug 2011053083.404.15$2,199
Jul 2011027194.144.52$1,224
Jun 2011034592.904.64$1,601
May 2011035298.134.40$1,551
Apr 20110139105.964.33$602
Mar 2011034196.364.06$1,384
Feb 2011023885.644.18$995
Jan 2011051486.504.59$2,359
Dec 2010047585.734.35$2,065
Nov 2010041480.843.80$1,571
Oct 2010036878.103.51$1,291
Sep 2010049972.633.98$1,986
Aug 201012384173.684.42$12,779
Jul 2010089472.554.74$4,234
Jun 201001,06270.364.91$5,215
May 201001,95871.124.24$8,293
Apr 201002,39581.694.12$9,874
Mar 20101733,23278.394.39$27,746
Feb 201003,79573.585.44$20,654
Jan 20101787,14174.365.96$55,826
Dec 200901,84071.445.48$10,090
Nov 200902374.593.75$86
Oct 20090072.544.11$0
Sep 20090965.543.06$28
Aug 200903967.423.22$126
Jul 200903061.133.46$104
Jun 2009010166.163.90$393
May 2009015654.743.93$612
Apr 2009038346.773.59$1,374
Mar 2009029842.144.06$1,210
Feb 200903632.814.63$167
Jan 200902735.865.37$145
Dec 2008077837.105.98$4,650
Nov 200806355.496.86$432
Oct 200805775.246.92$395
Sep 2008066101.767.88$520
Aug 20080348114.228.48$2,952
Jul 2008062131.0811.39$706
Jun 20080307131.3313.03$4,001
May 20080515123.1711.57$5,961
Apr 20080958110.3110.45$10,016
Mar 20080118101.909.66$1,140
Feb 2008018892.538.77$1,649
Jan 2008022490.388.21$1,838
Dec 200708988.337.30$650
Nov 2007015091.677.29$1,094
Oct 2007025382.856.92$1,751
Sep 2007029375.846.24$1,830
Aug 2007015269.066.39$971
Jul 2007055270.906.39$3,526
Jun 2007038562.007.55$2,906
May 2007019958.747.85$1,561
Apr 2007024759.617.81$1,928
Mar 2007038856.927.30$2,833
Feb 2007035355.108.22$2,900
Jan 2007050250.306.73$3,377
Dec 2006036856.656.92$2,546
Nov 2006026154.207.62$1,988
Oct 200601,17454.906.01$7,060
Sep 2006040260.085.04$2,025
Aug 200601,50568.717.34$11,047
Jul 2006060069.376.34$3,806
Jun 20061625766.286.38$11,101
May 200606966.016.42$443
Apr 2006020964.397.36$1,538
Mar 200618152356.707.08$13,967
Feb 2006038457.597.75$2,976
Jan 2006083260.598.93$7,433
Dec 2005057054.9413.42$7,647
Nov 2005074654.6910.59$7,899
Oct 2005071558.3413.80$9,864
Sep 2005094461.4512.08$11,403
Aug 2005094261.519.80$9,229
Jul 2005088155.697.84$6,910
Jun 2005079452.337.38$5,861
May 200503045.226.65$200
Apr 2005093749.207.36$6,897
Mar 2005083750.377.15$5,989
Feb 20050045.226.31$0
Jan 20057632143.166.32$5,310
Dec 2004090039.866.75$6,076
Nov 2004090045.286.33$5,697
Oct 20040049.706.52$0
Sep 200401,09743.245.28$5,796
Aug 2004092742.375.55$5,145
Jul 200401,52938.286.08$9,303
Jun 2004072236.106.43$4,645
May 2004044937.486.49$2,916
Apr 2004022934.475.86$1,342
Mar 2004057834.365.53$3,196
Feb 200402,31832.455.51$12,771
Jan 2004035232.036.30$2,217

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Jun 2025 — as filed, then multipliedworked
Condensate             0 bbl  × $ 66.48 =         $0
Gas                    5 Mcf  × $  3.13 =        $16

────────────────────────────────────────────────────
Month total                                      $16

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/206308 is the state's own key, not one this site invented.