GREEN BAY

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the OVERTON (COTTON VALLEY SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 209482District 06Field 678491502 tax incentive programmesCondensateGasSaveExport
Value, all time
$1.0 M
Sep 2004 – May 2026
Value, last 12 filed months
$3 k
at the published price for each month
Months reported
261
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 702 leases and 702 wells, and the rule below applies to all of them.

Discovered
1977-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2014-03-25.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-04-11164789
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition347 bbl$23,159
GasProduction148,614 Mcf$1,018,307
Total$1,041,466

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.2106, -95.1320. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.21057, -95.13196 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
12,069 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 12,069 ft.

Completions filed
Sep 2004
1 of 1 wells

1 well

42-423318151212,069 ftSep 2004

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (261)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

261 months

May 2026156106.413.05$277
Apr 202638298.932.87$532
Mar 202675089.753.15$786
Feb 202615063.503.75$251
Jan 202611859.138.00$203
Dec 202523656.664.41$272
Nov 202505058.593.93$196
Oct 202514359.383.30$201
Sep 202504062.743.08$123
Aug 202504463.933.01$133
Jul 202504366.743.32$143
Jun 202513566.483.13$176
May 202514560.553.23$206
Apr 2025194662.363.54$1,348
Mar 202501067.704.27$43
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 202404768.993.12$147
Nov 202402569.052.20$55
Oct 20245371.372.28$364
Sep 202403669.612.36$85
Aug 202403075.632.06$62
Jul 202405579.932.15$118
Jun 202407578.082.63$198
May 202405278.812.20$114
Apr 202405184.451.66$85
Mar 202416180.301.55$175
Feb 202406276.091.78$111
Jan 202406273.023.30$204
Dec 202306171.262.61$159
Nov 202306077.892.81$168
Oct 202304285.443.09$130
Sep 202305789.042.74$156
Aug 202304880.522.67$128
Jul 202304374.852.64$114
Jun 202305468.962.26$122
May 202303470.622.23$76
Apr 202307078.122.24$157
Mar 202306572.852.39$156
Feb 202305475.112.47$133
Jan 202307276.533.39$244
Dec 202205976.415.73$338
Nov 2022011185.005.65$627
Oct 202206487.185.86$375
Sep 202204684.888.16$376
Aug 2022083694.529.13$7,630
Jul 20220226101.587.54$1,705
Jun 2022022115.097.98$176
May 2022017109.378.43$143
Apr 2022079104.226.84$540
Mar 2022010108.885.08$51
Feb 20220691.054.86$29
Jan 202201881.844.54$82
Dec 20210671.323.90$23
Nov 20210877.435.24$42
Oct 202103079.795.71$171
Sep 202101269.865.35$64
Aug 202101966.024.22$80
Jul 202102270.783.98$88
Jun 202102669.493.38$88
May 202102063.483.02$60
Apr 202102560.362.76$69
Mar 202113861.302.72$165
Feb 202101357.805.55$72
Jan 202101250.412.81$34
Dec 202004044.642.68$107
Nov 202001938.772.71$51
Oct 202002036.972.48$50
Sep 202002137.091.99$42
Aug 202005839.982.39$138
Jul 202003538.371.83$64
Jun 202002534.901.69$42
May 202004316.921.81$78
Apr 202004014.751.80$72
Mar 202002830.341.86$52
Feb 202003849.881.98$75
Jan 202003857.252.09$80
Dec 201902559.012.30$58
Nov 201917155.302.75$251
Oct 201905153.472.42$123
Sep 201904155.052.66$109
Aug 201909453.112.30$217
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 201901250.852.79$34
Jan 201912046.033.23$111
Dec 201802546.594.19$105
Nov 201804352.934.24$182
Oct 201805561.443.40$187
Sep 201804459.543.11$137
Aug 201806359.403.07$193
Jul 201803165.142.93$91
Jun 201814560.183.08$199
May 201806765.382.90$194
Apr 201809663.842.90$278
Mar 201802561.222.79$70
Feb 201802061.782.77$55
Jan 201804562.874.01$180
Dec 201714057.272.92$174
Nov 201704155.423.12$128
Oct 201704549.292.98$134
Sep 201704447.523.09$136
Aug 201716445.373.00$238
Jul 201704443.873.09$136
Jun 201704042.493.09$123
May 201706045.373.26$196
Apr 201701947.933.21$61
Mar 201706146.772.98$182
Feb 20171950.452.95$77
Jan 201703849.413.42$130
Dec 201607948.763.72$294
Nov 201605942.492.64$156
Oct 201603546.193.09$108
Sep 201606641.553.10$205
Aug 2016010741.442.92$313
Jul 2016012541.622.92$366
Jun 2016012445.352.69$333
May 2016012842.521.99$255
Apr 2016010536.561.99$209
Mar 2016012833.011.79$230
Feb 2016017226.472.06$355
Jan 2016038727.352.36$915
Dec 2015046432.362.00$929
Nov 2015245038.792.17$1,053
Oct 2015047543.552.43$1,153
Sep 2015047942.992.76$1,321
Aug 2015045340.162.87$1,301
Jul 2015045448.152.95$1,337
Jun 2015047656.152.88$1,372
May 2015044555.212.96$1,315
Apr 2015047649.822.71$1,288
Mar 2015141342.892.93$1,255
Feb 2015041744.662.98$1,241
Jan 2015049143.433.10$1,522
Dec 2014048654.693.59$1,745
Nov 2014346170.464.25$2,171
Oct 2014046878.303.90$1,826
Sep 2014052886.164.05$2,136
Aug 2014054589.394.04$2,199
Jul 2014052196.564.18$2,178
Jun 2014056798.164.74$2,686
May 2014066594.734.73$3,143
Apr 2014069595.944.81$3,342
Mar 2014072295.895.06$3,651
Feb 2014062097.406.19$3,839
Jan 2014074490.404.86$3,616
Dec 2013073491.824.35$3,196
Nov 2013365388.853.74$2,708
Oct 2013078497.423.78$2,963
Sep 20130773104.113.72$2,874
Aug 20130853104.253.52$3,005
Jul 20130778102.523.72$2,892
Jun 2013079894.403.93$3,139
May 2013077294.834.15$3,203
Apr 2013376893.964.28$3,571
Mar 2013077593.623.91$3,032
Feb 2013067691.233.42$2,312
Jan 2013073291.603.42$2,503
Dec 2012078686.773.42$2,688
Nov 2012076686.953.62$2,777
Oct 2012281189.383.40$2,936
Sep 2012078994.672.92$2,303
Aug 2012064292.662.91$1,867
Jul 2012074385.133.02$2,244
Jun 2012067279.822.52$1,693
May 2012160791.612.49$1,602
Apr 2012025101.652.00$50
Mar 2012021105.052.22$47
Feb 20120336101.102.57$864
Jan 2012030198.092.73$823
Dec 2011018896.873.24$609
Nov 201107095.723.31$232
Oct 201104784.983.65$171
Sep 201104783.623.99$187
Aug 201105483.404.15$224
Jul 201109694.144.52$434
Jun 201108492.904.64$390
May 201108898.134.40$388
Apr 2011045105.964.33$195
Mar 201108996.364.06$361
Feb 201108085.644.18$334
Jan 201104886.504.59$220
Dec 2010010485.734.35$452
Nov 201009380.843.80$353
Oct 2010012578.103.51$439
Sep 20101018172.633.98$7,658
Aug 2010010873.684.42$477
Jul 201001472.554.74$66
Jun 2010016670.364.91$815
May 2010010971.124.24$462
Apr 201001281.694.12$49
Mar 201031278.394.39$288
Feb 20100773.585.44$38
Jan 201006174.365.96$364
Dec 200907271.445.48$395
Nov 200908374.593.75$311
Oct 200908072.544.11$329
Sep 2009022965.543.06$702
Aug 2009027167.423.22$872
Jul 2009030661.133.46$1,060
Jun 2009029166.163.90$1,133
May 2009022854.743.93$895
Apr 2009123246.773.59$879
Mar 2009065842.144.06$2,671
Feb 2009017032.814.63$788
Jan 2009030335.865.37$1,627
Dec 2008023537.105.98$1,405
Nov 2008018555.496.86$1,269
Oct 2008013875.246.92$955
Sep 20080189101.767.88$1,489
Aug 20080112114.228.48$950
Jul 20080115131.0811.39$1,310
Jun 20080102131.3313.03$1,329
May 2008191123.1711.57$1,176
Apr 20080161110.3110.45$1,683
Mar 2008292101.909.66$1,093
Feb 2008711592.538.77$1,656
Jan 2008034090.388.21$2,790
Dec 2007019988.337.30$1,453
Nov 2007020591.677.29$1,495
Oct 2007036382.856.92$2,513
Sep 2007035875.846.24$2,235
Aug 2007042369.066.39$2,702
Jul 2007080970.906.39$5,168
Jun 200701,58462.007.55$11,957
May 200701,10358.747.85$8,654
Apr 200701,25059.617.81$9,757
Mar 200702,04356.927.30$14,918
Feb 200701,29255.108.22$10,615
Jan 200701,86150.306.73$12,519
Dec 200601,65456.656.92$11,443
Nov 200601,62654.207.62$12,386
Oct 200601,85554.906.01$11,156
Sep 2006262,37760.085.04$13,536
Aug 200602,73868.717.34$20,097
Jul 2006153,04369.376.34$20,342
Jun 200612,86166.286.38$18,331
May 200603,27166.016.42$21,016
Apr 2006272,97064.397.36$23,599
Mar 200602,16756.707.08$15,349
Feb 200602,70457.597.75$20,959
Jan 2006303,25360.598.93$30,878
Dec 200503,95954.9413.42$53,112
Nov 200504,54454.6910.59$48,114
Oct 200504,77958.3413.80$65,930
Sep 200504,26461.4512.08$51,505
Aug 2005324,01861.519.80$41,332
Jul 200504,42455.697.84$34,700
Jun 200505,45052.337.38$40,227
May 200508,16845.226.65$54,327
Apr 2005363,42649.207.36$26,988
Mar 200505,04050.377.15$36,061
Feb 200502,00745.226.31$12,668
Jan 200502,80943.166.32$17,759
Dec 200404,44939.866.75$30,036
Nov 2004010645.286.33$671
Oct 200406,33849.706.52$41,293
Sep 200401,19843.245.28$6,330

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             1 bbl  × $106.41 =       $106
Gas                   56 Mcf  × $  3.05 =       $171

────────────────────────────────────────────────────
Month total                                     $277

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/209482 is the state's own key, not one this site invented.