STURGES GU

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the HARDWOOD (COTTON VALLEY) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 210212District 06Field 390262002 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.2 M
Apr 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
254
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 91 leases and 91 wells, and the rule below applies to all of them.

Discovered
1985-02-08
as the register files it
Field class
Gas
the register's own label
Between wells
0 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 20 acres. The field rule took effect on 2010-11-30.

The Commission's schedule remark for this field reads: STACKED LATERAL INFORMATION. ALLOCATION FORMULA REMAINS SUSPENDED.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112005-10-26165980
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition5,039 bbl$325,886
GasProduction273,287 Mcf$1,908,591
Total$2,234,477

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.4270, -94.3340. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.42704, -94.33402 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
10,200 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 10,200 ft.

Completions filed
Apr 2006
1 of 1 wells

1 well

42-20333118110,200 ftApr 2006

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (254)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

254 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190055.052.66$0
Aug 20190053.112.30$0
Jul 20190056.272.46$0
Jun 20190052.782.49$0
May 20190058.482.74$0
Apr 20190062.632.75$0
Mar 20190056.803.06$0
Feb 20190050.852.79$0
Jan 20190046.033.23$0
Dec 20180046.594.19$0
Nov 20180052.934.24$0
Oct 20180061.443.40$0
Sep 20181159.543.11$63
Aug 20182259.403.07$125
Jul 20180065.142.93$0
Jun 20180060.183.08$0
May 20180065.382.90$0
Apr 20180063.842.90$0
Mar 20180061.222.79$0
Feb 20180061.782.77$0
Jan 20180062.874.01$0
Dec 20170057.272.92$0
Nov 20170055.423.12$0
Oct 20170049.292.98$0
Sep 20170147.523.09$3
Aug 20170145.373.00$3
Jul 20170043.873.09$0
Jun 20170142.493.09$3
May 20170145.373.26$3
Apr 20170447.933.21$13
Mar 20170746.772.98$21
Feb 20170850.452.95$24
Jan 20170649.413.42$21
Dec 20160448.763.72$15
Nov 20160242.492.64$5
Oct 20160246.193.09$6
Sep 20160141.553.10$3
Aug 20160041.442.92$0
Jul 20164941.622.92$193
Jun 201601945.352.69$51
May 20160842.521.99$16
Apr 20160736.561.99$14
Mar 201601433.011.79$25
Feb 201601126.472.06$23
Jan 20160327.352.36$7
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150242.992.76$6
Aug 2015010540.162.87$302
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 201501243.433.10$37
Dec 201402354.693.59$83
Nov 201403370.464.25$140
Oct 201402378.303.90$90
Sep 201402986.164.05$117
Aug 20140089.394.04$0
Jul 201402596.564.18$104
Jun 201406598.164.74$308
May 201406794.734.73$317
Apr 201405,53295.944.81$26,604
Mar 201406895.895.06$344
Feb 201406197.406.19$378
Jan 201406190.404.86$297
Dec 201305291.824.35$226
Nov 201303388.853.74$123
Oct 201303497.423.78$129
Sep 2013066104.113.72$245
Aug 20130372104.253.52$1,310
Jul 20130127102.523.72$472
Jun 2013032394.403.93$1,270
May 201316694.834.15$369
Apr 201308593.964.28$364
Mar 2013511593.623.91$918
Feb 2013957191.233.42$2,774
Jan 2013083591.603.42$2,856
Dec 2012335986.773.42$1,488
Nov 201207286.953.62$261
Oct 201218189.383.40$365
Sep 20121012994.672.92$1,323
Aug 2012077392.662.91$2,248
Jul 20121060885.133.02$2,688
Jun 2012083479.822.52$2,101
May 20121198991.612.49$3,469
Apr 2012121,042101.652.00$3,300
Mar 2012111,067105.052.22$3,527
Feb 201212982101.102.57$3,737
Jan 20121088398.092.73$3,395
Dec 20111087496.873.24$3,800
Nov 201101,03395.723.31$3,421
Oct 2011101,13984.983.65$5,005
Sep 2011111,11383.623.99$5,356
Aug 2011111,14683.404.15$5,673
Jul 201101,34894.144.52$6,089
Jun 2011231,31892.904.64$8,252
May 201101,23198.134.40$5,422
Apr 2011111,186105.964.33$6,305
Mar 2011121,50896.364.06$7,275
Feb 2011121,07385.644.18$5,513
Jan 2011141,39186.504.59$7,594
Dec 2010141,67785.734.35$8,491
Nov 2010151,69880.843.80$7,657
Oct 2010111,75378.103.51$7,010
Sep 2010131,63072.633.98$7,431
Aug 2010151,38273.684.42$7,213
Jul 201001,80872.554.74$8,564
Jun 201001,89970.364.91$9,325
May 2010172,00971.124.24$9,718
Apr 2010301,86881.694.12$10,152
Mar 201062,24978.394.39$10,340
Feb 2010202,01873.585.44$12,454
Jan 2010111,72174.365.96$11,082
Dec 2009142,02371.445.48$12,094
Nov 2009252,04174.593.75$9,522
Oct 2009122,21172.544.11$9,958
Sep 2009142,38565.543.06$8,227
Aug 2009122,34467.423.22$8,353
Jul 200981,72161.133.46$6,451
Jun 2009231,54866.163.90$7,551
May 200971,66654.743.93$6,923
Apr 2009221,36846.773.59$5,937
Mar 2009311,77242.144.06$8,499
Feb 2009411,56332.814.63$8,587
Jan 200982,09135.865.37$11,518
Dec 2008121,08437.105.98$6,924
Nov 2008161,23755.496.86$9,374
Oct 2008251,41375.246.92$11,662
Sep 2008281,624101.767.88$15,642
Aug 2008421,740114.228.48$19,558
Jul 2008242,129131.0811.39$27,394
Jun 2008331,763131.3313.03$27,310
May 2008571,567123.1711.57$25,158
Apr 200871,222110.3110.45$13,548
Mar 2008161,074101.909.66$12,010
Feb 2008121,20392.538.77$11,661
Jan 2008201,81790.388.21$16,717
Dec 2007571,74888.337.30$17,799
Nov 2007231,57591.677.29$13,593
Oct 2007921,93782.856.92$21,030
Sep 20071692,36375.846.24$27,572
Aug 2007592,48769.066.39$19,961
Jul 20071382,26170.906.39$24,227
Jun 20071722,07562.007.55$26,327
May 2007642,31158.747.85$21,892
Apr 20072272,74159.617.81$34,926
Mar 20072663,30956.927.30$39,303
Feb 20071152,65555.108.22$28,150
Jan 20071973,94650.306.73$36,453
Dec 20062873,77656.656.92$42,383
Nov 20061483,34954.207.62$33,533
Oct 20061134,41354.906.01$32,743
Sep 20061537,73760.085.04$48,165
Aug 20062035,24868.717.34$52,468
Jul 2006827,54969.376.34$53,570
Jun 20061017,36666.286.38$53,718
May 20065710,48966.016.42$71,154
Apr 20062644,79664.397.36$52,300
Mar 200615,27856.707.08$37,440
Feb 2006655,81057.597.75$48,777
Jan 2006697,26060.598.93$69,037
Dec 2005427,84454.9413.42$107,538
Nov 20051066,86354.6910.59$78,465
Oct 2005767,34558.3413.80$105,764
Sep 2005624,71861.4512.08$60,799
Aug 200511610,28661.519.80$107,905
Jul 200524482255.697.84$20,036
Jun 200519612,33352.337.38$101,287
May 200519316,18145.226.65$116,350
Apr 2005511,02249.207.36$81,373

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2018 — as filed, then multipliedworked
Condensate             1 bbl  × $ 59.54 =        $60
Gas                    1 Mcf  × $  3.11 =         $3

────────────────────────────────────────────────────
Month total                                      $63

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/210212 is the state's own key, not one this site invented.