CLIFTON, SAMMY

Operated by WEATHERLY OIL & GAS, LLC (P-5 902815) in the NACONICHE CREEK (ROD.-TP CONS.) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213919District 06Field 643002872 tax incentive programmesCondensateGasSaveExport
Value, all time
$2.1 M
Jul 2005 – May 2026
Value, last 12 filed months
$0
at the published price for each month
Months reported
251
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 373 leases and 373 wells, and the rule below applies to all of them.

Discovered
2005-09-27
as the register files it
Field class
Oil and gas
the register's own label
Between wells
933 ft
minimum
From a lease line
467 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2005-09-27.

The Commission's schedule remark for this field reads: BY HEARING.

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-07-28169334
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition2,473 bbl$177,974
GasProduction244,171 Mcf$1,943,837
Total$2,121,811

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 31.7890, -94.5780. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

31.78899, -94.57799 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
9,000 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 9,000 ft.

Completions filed
Jul 2005
1 of 1 wells

1 well

42-3473203719,000 ftJul 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (251)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

251 months

May 202600106.413.05$0
Apr 20260098.932.87$0
Mar 20260089.753.15$0
Feb 20260063.503.75$0
Jan 20260059.138.00$0
Dec 20250056.664.41$0
Nov 20250058.593.93$0
Oct 20250059.383.30$0
Sep 20250062.743.08$0
Aug 20250063.933.01$0
Jul 20250066.743.32$0
Jun 20250066.483.13$0
May 20250060.553.23$0
Apr 20250062.363.54$0
Mar 20250067.704.27$0
Feb 20250070.884.34$0
Jan 20250074.324.28$0
Dec 20240068.993.12$0
Nov 20240069.052.20$0
Oct 20240071.372.28$0
Sep 20240069.612.36$0
Aug 20240075.632.06$0
Jul 20240079.932.15$0
Jun 20240078.082.63$0
May 20240078.812.20$0
Apr 20240084.451.66$0
Mar 20240080.301.55$0
Feb 20240076.091.78$0
Jan 20240073.023.30$0
Dec 20230071.262.61$0
Nov 20230077.892.81$0
Oct 20230085.443.09$0
Sep 20230089.042.74$0
Aug 20230080.522.67$0
Jul 20230074.852.64$0
Jun 20230068.962.26$0
May 20230070.622.23$0
Apr 20230078.122.24$0
Mar 20230072.852.39$0
Feb 20230075.112.47$0
Jan 20230076.533.39$0
Dec 20220076.415.73$0
Nov 20220085.005.65$0
Oct 20220087.185.86$0
Sep 20220084.888.16$0
Aug 20220094.529.13$0
Jul 202200101.587.54$0
Jun 202200115.097.98$0
May 202200109.378.43$0
Apr 202200104.226.84$0
Mar 202200108.885.08$0
Feb 20220091.054.86$0
Jan 20220081.844.54$0
Dec 20210071.323.90$0
Nov 20210077.435.24$0
Oct 20210079.795.71$0
Sep 20210069.865.35$0
Aug 20210066.024.22$0
Jul 20210070.783.98$0
Jun 20210069.493.38$0
May 20210063.483.02$0
Apr 20210060.362.76$0
Mar 20210061.302.72$0
Feb 20210057.805.55$0
Jan 20210050.412.81$0
Dec 20200044.642.68$0
Nov 20200038.772.71$0
Oct 20200036.972.48$0
Sep 20200037.091.99$0
Aug 20200039.982.39$0
Jul 20200038.371.83$0
Jun 20200034.901.69$0
May 20200016.921.81$0
Apr 20200014.751.80$0
Mar 20200030.341.86$0
Feb 20200049.881.98$0
Jan 20200057.252.09$0
Dec 20190059.012.30$0
Nov 20190055.302.75$0
Oct 20190053.472.42$0
Sep 20190355.052.66$8
Aug 20190053.112.30$0
Jul 201901156.272.46$27
Jun 201901252.782.49$30
May 20190658.482.74$16
Apr 201901662.632.75$44
Mar 201901156.803.06$34
Feb 201901450.852.79$39
Jan 201901246.033.23$39
Dec 201802246.594.19$92
Nov 20180052.934.24$0
Oct 201801461.443.40$48
Sep 201801859.543.11$56
Aug 201801059.403.07$31
Jul 201802665.142.93$76
Jun 2018010260.183.08$314
May 20180065.382.90$0
Apr 201807663.842.90$220
Mar 201895461.222.79$701
Feb 20180061.782.77$0
Jan 201805362.874.01$212
Dec 20170057.272.92$0
Nov 201704255.423.12$131
Oct 20170049.292.98$0
Sep 20170047.523.09$0
Aug 20170045.373.00$0
Jul 20170043.873.09$0
Jun 20170042.493.09$0
May 20170045.373.26$0
Apr 20170047.933.21$0
Mar 20170046.772.98$0
Feb 20170050.452.95$0
Jan 20170049.413.42$0
Dec 20160048.763.72$0
Nov 20160042.492.64$0
Oct 20160046.193.09$0
Sep 20160041.553.10$0
Aug 20160041.442.92$0
Jul 20160041.622.92$0
Jun 20160045.352.69$0
May 20160042.521.99$0
Apr 20160036.561.99$0
Mar 20160033.011.79$0
Feb 20160026.472.06$0
Jan 20160027.352.36$0
Dec 20150032.362.00$0
Nov 20150038.792.17$0
Oct 20150043.552.43$0
Sep 20150042.992.76$0
Aug 20150040.162.87$0
Jul 20150048.152.95$0
Jun 20150056.152.88$0
May 20150055.212.96$0
Apr 20150049.822.71$0
Mar 20150042.892.93$0
Feb 20150044.662.98$0
Jan 201524043.433.10$1,042
Dec 20140054.693.59$0
Nov 20140070.464.25$0
Oct 20140078.303.90$0
Sep 20140086.164.05$0
Aug 20140089.394.04$0
Jul 20140096.564.18$0
Jun 20140098.164.74$0
May 20140094.734.73$0
Apr 20140095.944.81$0
Mar 20140095.895.06$0
Feb 20140097.406.19$0
Jan 20140090.404.86$0
Dec 20130091.824.35$0
Nov 20130088.853.74$0
Oct 20130097.423.78$0
Sep 201300104.113.72$0
Aug 2013790104.253.52$8,236
Jul 201300102.523.72$0
Jun 20130094.403.93$0
May 20130094.834.15$0
Apr 20130093.964.28$0
Mar 20130093.623.91$0
Feb 20130091.233.42$0
Jan 20130091.603.42$0
Dec 2012010486.773.42$356
Nov 20120786.953.62$25
Oct 2012010389.383.40$350
Sep 2012011794.672.92$341
Aug 2012013992.662.91$404
Jul 2012014685.133.02$441
Jun 2012017079.822.52$428
May 2012019991.612.49$495
Apr 20120288101.652.00$575
Mar 20120242105.052.22$538
Feb 20120121101.102.57$311
Jan 2012014398.092.73$391
Dec 2011021096.873.24$680
Nov 2011047095.723.31$1,556
Oct 2011091084.983.65$3,320
Sep 2011080383.623.99$3,201
Aug 201110077983.404.15$11,572
Jul 2011081994.144.52$3,700
Jun 2011076392.904.64$3,540
May 2011077398.134.40$3,405
Apr 20110779105.964.33$3,376
Mar 20113581596.364.06$6,679
Feb 2011070985.644.18$2,964
Jan 2011083486.504.59$3,827
Dec 2010095585.734.35$4,152
Nov 2010089180.843.80$3,382
Oct 2010095078.103.51$3,333
Sep 20108390272.633.98$9,618
Aug 2010096173.684.42$4,247
Jul 201001,06772.554.74$5,054
Jun 201001,14670.364.91$5,627
May 201001,23971.124.24$5,247
Apr 201001,20781.694.12$4,976
Mar 201001,26678.394.39$5,556
Feb 20101471,15573.585.44$17,102
Jan 201001,30474.365.96$7,777
Dec 200901,35071.445.48$7,403
Nov 200901,37374.593.75$5,151
Oct 200901,32872.544.11$5,458
Sep 200901,46265.543.06$4,481
Aug 200901,55167.423.22$4,992
Jul 200901,57561.133.46$5,457
Jun 200901,56966.163.90$6,111
May 2009901,72854.743.93$11,710
Apr 200901,71346.773.59$6,145
Mar 200901,66442.144.06$6,754
Feb 200901,68332.814.63$7,797
Jan 200901,85535.865.37$9,963
Dec 200801,86137.105.98$11,123
Nov 200801,85055.496.86$12,692
Oct 20081031,55875.246.92$18,534
Sep 200801,802101.767.88$14,195
Aug 200802,010114.228.48$17,051
Jul 200802,081131.0811.39$23,701
Jun 20081072,120131.3313.03$41,681
May 200802,241123.1711.57$25,938
Apr 20081082,196110.3110.45$34,872
Mar 200802,251101.909.66$21,754
Feb 200801,93792.538.77$16,989
Jan 200801,64290.388.21$13,474
Dec 20071012,45088.337.30$26,811
Nov 2007832,69891.677.29$27,282
Oct 200702,81182.856.92$19,458
Sep 2007693,01375.846.24$24,047
Aug 2007463,34069.066.39$24,512
Jul 2007583,17370.906.39$24,381
Jun 2007913,07862.007.55$28,876
May 200713,34358.747.85$26,289
Apr 200703,55359.617.81$27,732
Mar 200703,96956.927.30$28,982
Feb 200703,82155.108.22$31,393
Jan 20071774,48550.306.73$39,073
Dec 200604,75056.656.92$32,863
Nov 200604,97954.207.62$37,927
Oct 200615,93854.906.01$35,765
Sep 200615,31060.085.04$26,808
Aug 200605,45768.717.34$40,054
Jul 200647,10569.376.34$45,343
Jun 20061815,70666.286.38$48,423
May 200606,18466.016.42$39,732
Apr 200606,40264.397.36$47,122
Mar 20061767,09956.707.08$60,261
Feb 200606,98957.597.75$54,173
Jan 200608,47760.598.93$75,728
Dec 20052018,63954.9413.42$126,939
Nov 200509,94554.6910.59$105,302
Oct 200519011,53258.3413.80$170,177
Sep 2005013,86361.4512.08$167,451
Aug 200520819,67461.519.80$205,537
Jul 20050055.697.84$0

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

Sep 2019 — as filed, then multipliedworked
Condensate             0 bbl  × $ 55.05 =         $0
Gas                    3 Mcf  × $  2.66 =         $8

────────────────────────────────────────────────────
Month total                                       $8

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/213919 is the state's own key, not one this site invented.