MOORE

Operated by DIVERSIFIED PRODUCTION LLC (P-5 220903) in the OVERTON (COTTON VALLEY SAND) field. Every figure below is a volume the Railroad Commission published, multiplied by a monthly price you can check.

Gas lease lease 213941District 06Field 678491502 tax incentive programmesCondensateGasSaveExport
Value, all time
$4.8 M
Jun 2005 – May 2026
Value, last 12 filed months
$4 k
at the published price for each month
Months reported
252
no gaps in the span
Streams
2
condensate, gas

The Railroad Commission's own record for the field this lease produces from, including the spacing rule that governs how close together its wells may be drilled.

These are facts about the field, not about this lease. The field holds 702 leases and 702 wells, and the rule below applies to all of them.

Discovered
1977-02-23
as the register files it
Field class
Oil and gas
the register's own label
Between wells
600 ft
minimum
From a lease line
330 ft
minimum

A drilling unit in this field needs at least 40 acres. The field rule took effect on 2014-03-25.

The Commission's schedule remark for this field reads: DESIGNATED AS UFT FIELD PER DOCKET 01-0299858

Severance-tax incentive filings

Applications the operator filed to have this lease's gas taxed at a reduced state rate. A filing is an application, and this page never calls one a reduction that was granted.

ProgrammeFilingsWith an approval dateDatedDocket
High Cost Gas112006-03-21167612
NGPA1none

This says nothing about a royalty. A severance tax is charged to the operator. Whether a reduced rate reaches a royalty owner depends on the wording of the lease instrument, which is a private contract this site does not hold.

What this lease produced, and what it was worth

Oil and condensate are valued on the volume the state records as disposed of; gas and casinghead gas on the volume produced. They are different columns of different files, and the difference is not cosmetic.

StreamBasisVolumeValue
CondensateDisposition9,079 bbl$611,794
GasProduction650,637 Mcf$4,167,972
Total$4,779,767

Wells on this lease (1)

Every wellbore the Railroad Commission records against this lease key, with the depth, the last completion and the plug date exactly as filed. A well with no plug date is not stated to be producing — the state files no such flag.

These wells centre on 32.1522, -95.1004. A lease has no coordinate of its own — that point is the mean of its wells, and they span 0.0 miles.

32.15224, -95.10039 · centre of the wells drawn, derived

What these wells add up to

Every figure below is counted over all of this lease's wells, not over the rows listed above. The Railroad Commission files two facts about a well's state — a plug date and a proration-schedule flag — and a well can carry both, so they are published as separate counts and never merged into a status.

On the schedule
0.0%
0 of 1 wells
With a plug date
0.0%
0 of 1 wells
Median depth
11,950 ft
1 wells filed one
Completion to plug
no well filed both dates

What the state filed about each well

On the RRC proration schedule
00.0%
A plug date is filed
00.0%
BothOn the schedule and plugged. Neither fact cancels the other.
00.0%
NeitherNo plug date, and not on the schedule.
1100.0%

A plug date is the date the Commission recorded the wellbore as sealed with cement and abandoned. It is the only end-of-life fact Texas files. There is no "active" flag on a well, so this page does not print one — a well with no plug date is not stated to be producing.

How deep they were drilled

The one well that filed a depth was drilled to 11,950 ft.

Completions filed
Jun 2005
1 of 1 wells

1 well

42-42331810311,950 ftJun 2005

The API number is the state's, prefixed 42 for Texas. A well is matched to this lease by the lease key the Commission files on the wellbore record, so a well that has moved between leases appears under each one it was filed against.

Every month this lease reported (252)

Volume × price = value, one row per cycle. The price columns are the same series published on the prices page — nothing here is modelled.

252 months

May 20260114106.413.05$347
Apr 2026012898.932.87$367
Mar 2026015089.753.15$472
Feb 2026017163.503.75$641
Jan 2026010059.138.00$800
Dec 202508256.664.41$362
Nov 202507458.593.93$291
Oct 20250859.383.30$26
Sep 20250262.743.08$6
Aug 20250063.933.01$0
Jul 202503666.743.32$119
Jun 2025018166.483.13$566
May 2025017660.553.23$569
Apr 2025018362.363.54$648
Mar 2025018767.704.27$798
Feb 2025018170.884.34$786
Jan 2025019574.324.28$834
Dec 2024023668.993.12$737
Nov 2024023569.052.20$517
Oct 20241426971.372.28$1,613
Sep 2024029269.612.36$690
Aug 2024030575.632.06$629
Jul 2024030679.932.15$657
Jun 2024031278.082.63$822
May 2024031278.812.20$686
Apr 2024030684.451.66$508
Mar 202416632680.301.55$13,834
Feb 2024130276.091.78$615
Jan 2024139873.023.30$1,385
Dec 2023359871.262.61$1,775
Nov 2023132177.892.81$979
Oct 2023029485.443.09$908
Sep 2023128089.042.74$855
Aug 202302780.522.67$72
Jul 2023231874.852.64$990
Jun 2023328868.962.26$857
May 2023335370.622.23$998
Apr 2023032878.122.24$734
Mar 2023631972.852.39$1,201
Feb 2023328275.112.47$921
Jan 2023536076.533.39$1,602
Dec 2022543376.415.73$2,863
Nov 2022028485.005.65$1,604
Oct 2022637287.185.86$2,704
Sep 2022433284.888.16$3,050
Aug 2022436694.529.13$3,719
Jul 20226352101.587.54$3,264
Jun 20227398115.097.98$3,981
May 20224356109.378.43$3,440
Apr 20224372104.226.84$2,960
Mar 20222392108.885.08$2,208
Feb 2022437591.054.86$2,186
Jan 2022944281.844.54$2,742
Dec 2021639971.323.90$1,984
Nov 2021936977.435.24$2,629
Oct 2021444079.795.71$2,833
Sep 2021444269.865.35$2,645
Aug 20211547066.024.22$2,974
Jul 2021424570.783.98$1,259
Jun 2021539269.493.38$1,673
May 2021740963.483.02$1,679
Apr 2021241060.362.76$1,252
Mar 2021646961.302.72$1,642
Feb 2021639757.805.55$2,549
Jan 2021344350.412.81$1,396
Dec 2020845644.642.68$1,577
Nov 2020646638.772.71$1,494
Oct 20201153336.972.48$1,728
Sep 2020348537.091.99$1,077
Aug 2020854839.982.39$1,627
Jul 2020456738.371.83$1,188
Jun 20201156834.901.69$1,344
May 2020753416.921.81$1,088
Apr 202019654114.751.80$3,867
Mar 20202057330.341.86$1,670
Feb 2020553449.881.98$1,307
Jan 20201064157.252.09$1,915
Dec 20191369059.012.30$2,357
Nov 20191064455.302.75$2,324
Oct 2019864853.472.42$1,995
Sep 2019561355.052.66$1,904
Aug 2019862053.112.30$1,854
Jul 20191259256.272.46$2,132
Jun 2019255652.782.49$1,491
May 20191173558.482.74$2,657
Apr 2019178962.632.75$2,233
Mar 2019878456.803.06$2,855
Feb 2019871950.852.79$2,414
Jan 201919084946.033.23$11,486
Dec 2018775746.594.19$3,495
Nov 201811,06352.934.24$4,557
Oct 201892,01261.443.40$7,390
Sep 201801,05359.543.11$3,273
Aug 201871,17859.403.07$4,028
Jul 201851,21465.142.93$3,885
Jun 201811,17260.183.08$3,666
May 201811,16365.382.90$3,439
Apr 201861,21763.842.90$3,913
Mar 201811,34361.222.79$3,804
Feb 201821,12561.782.77$3,235
Jan 201871,08862.874.01$4,802
Dec 201711,16757.272.92$3,467
Nov 201771,15355.423.12$3,983
Oct 20171751,27349.292.98$12,424
Sep 201761,54647.523.09$5,058
Aug 20171814,57945.373.00$21,969
Jul 201722,03443.873.09$6,367
Jun 201721,31842.493.09$4,154
May 201781,46145.373.26$5,131
Apr 201721,17447.933.21$3,866
Mar 201721,14746.772.98$3,516
Feb 201781,42150.452.95$4,599
Jan 201701,55549.413.42$5,316
Dec 201621,43648.763.72$5,444
Nov 201671,47842.492.64$4,206
Oct 201621,57246.193.09$4,950
Sep 201621,47541.553.10$4,657
Aug 201611,26241.442.92$3,732
Jul 201661,37241.622.92$4,262
Jun 20161781,68445.352.69$12,595
May 201621,79742.521.99$3,663
Apr 201611,54436.561.99$3,111
Mar 201641,61733.011.79$3,033
Feb 20162626.472.06$65
Jan 201671,60527.352.36$3,986
Dec 201541,65132.362.00$3,434
Nov 2015467238.792.17$1,612
Oct 201511,78443.552.43$4,373
Sep 20151781,54542.992.76$11,914
Aug 201501,79440.162.87$5,153
Jul 201501,39448.152.95$4,105
Jun 201511,15556.152.88$3,386
May 201531,17255.212.96$3,629
Apr 201521,50849.822.71$4,181
Mar 201541,66542.892.93$5,058
Feb 201511,60244.662.98$4,813
Jan 201501,84043.433.10$5,705
Dec 201421,84454.693.59$6,732
Nov 201401,81470.464.25$7,713
Oct 201431,92078.303.90$7,725
Sep 20141801,87186.164.05$23,078
Aug 201401,99189.394.04$8,034
Jul 201472,03796.564.18$9,190
Jun 201402,09698.164.74$9,929
May 2014102,07494.734.73$10,750
Apr 20141951,99095.944.81$28,278
Mar 201445495.895.06$657
Feb 201441,88697.406.19$12,068
Jan 201452,05990.404.86$10,460
Dec 201342,20891.824.35$9,982
Nov 201302,21288.853.74$8,269
Oct 201342,05197.423.78$8,141
Sep 20131891,763104.113.72$26,231
Aug 201301,948104.253.52$6,862
Jul 201302,009102.523.72$7,469
Jun 201381,99994.403.93$8,618
May 201301,97594.834.15$8,194
Apr 201342,02493.964.28$9,044
Mar 201302,04693.623.91$8,006
Feb 201341,84491.233.42$6,671
Jan 20131912,22091.603.42$25,088
Dec 201242,37786.773.42$8,477
Nov 201252,29286.953.62$8,743
Oct 201202,42689.383.40$8,248
Sep 201242,35394.672.92$7,246
Aug 201202,29892.662.91$6,683
Jul 201272,47785.133.02$8,078
Jun 20121872,43079.822.52$21,048
May 201201,91491.612.49$4,763
Apr 201272,077101.652.00$4,859
Mar 201272,088105.052.22$5,375
Feb 201242,050101.102.57$5,673
Jan 201272,35498.092.73$7,123
Dec 201162,49796.873.24$8,671
Nov 201182,59495.723.31$9,355
Oct 201142,43784.983.65$9,231
Sep 201182,67083.623.99$11,311
Aug 201142,82183.404.15$12,039
Jul 201192,76394.144.52$13,328
Jun 2011122,66792.904.64$13,489
May 20111852,79498.134.40$30,461
Apr 201182,637105.964.33$12,275
Mar 201142,83796.364.06$11,896
Feb 2011132,54885.644.18$11,764
Jan 201193,05186.504.59$14,779
Dec 201063,06685.734.35$13,845
Nov 201092,98180.843.80$12,041
Oct 2010142,76978.103.51$10,810
Sep 20101802,78272.633.98$24,144
Aug 2010102,40073.684.42$11,343
Jul 20101813,08772.554.74$27,753
Jun 2010183,03770.364.91$16,179
May 2010113,21671.124.24$14,403
Apr 2010233,18481.694.12$15,006
Mar 2010153,46578.394.39$16,383
Feb 2010143,30573.585.44$19,017
Jan 20101993,60774.365.96$36,310
Dec 200913,72671.445.48$20,504
Nov 200903,74774.593.75$14,057
Oct 2009143,88272.544.11$16,972
Sep 2009153,91065.543.06$12,966
Aug 2009393,97267.423.22$15,413
Jul 20092074,06061.133.46$26,720
Jun 20090266.163.90$8
May 200943,95454.743.93$15,741
Apr 2009224,03046.773.59$15,487
Mar 20092053,83442.144.06$24,201
Feb 2009173,63632.814.63$17,403
Jan 200903,70635.865.37$19,905
Dec 200803,97037.105.98$23,729
Nov 2008194,00955.496.86$28,557
Oct 2008394,04975.246.92$30,961
Sep 20081974,330101.767.88$54,155
Aug 200834,648114.228.48$39,772
Jul 2008204,734131.0811.39$56,539
Jun 2008174,583131.3313.03$61,961
May 20081964,857123.1711.57$80,358
Apr 2008124,634110.3110.45$49,772
Mar 2008124,805101.909.66$47,659
Feb 2008194,38292.538.77$40,191
Jan 20081894,64190.388.21$55,165
Dec 2007114,84288.337.30$36,328
Nov 20071844,63291.677.29$50,642
Oct 2007114,92782.856.92$35,016
Sep 20072145,03375.846.24$47,657
Aug 2007104,43869.066.39$29,040
Jul 2007145,34470.906.39$35,130
Jun 20071965,79662.007.55$55,903
May 200711,26258.747.85$9,961
Apr 2007116,00459.617.81$47,518
Mar 200736,40156.927.30$46,911
Feb 20071905,59555.108.22$56,438
Jan 2007196,47450.306.73$44,505
Dec 2006146,63256.656.92$46,676
Nov 2006146,89654.207.62$53,289
Oct 20061857,58554.906.01$55,771
Sep 200647,28760.085.04$36,946
Aug 20061877,73168.717.34$69,594
Jul 200697,95069.376.34$51,049
Jun 20061898,08666.286.38$64,147
May 2006128,76466.016.42$57,101
Apr 20061898,54464.397.36$75,058
Mar 200636910,23656.707.08$93,423
Feb 20062279,89457.597.75$89,763
Jan 20062012,22660.598.93$110,431
Dec 200519113,34154.9413.42$189,468
Nov 200520614,27554.6910.59$162,416
Oct 200520516,67658.3413.80$242,018
Sep 200538917,34861.4512.08$233,451
Aug 200523623,03461.519.80$240,177
Jul 200554129,88055.697.84$264,496
Jun 20053232,89552.337.38$244,474

How to read this page

The arithmetic is one multiplication per stream per month. Here it is, worked, on a real row from the table above.

May 2026 — as filed, then multipliedworked
Condensate             0 bbl  × $106.41 =         $0
Gas                  114 Mcf  × $  3.05 =       $347

────────────────────────────────────────────────────
Month total                                     $347

The volumes are the state's, unchanged

Every barrel and every Mcf on this page is a number the Railroad Commission of Texas published in its monthly production query. Nothing is modelled, estimated or filled in.

The dollars are a multiplication, not a valuation

Volume × a published monthly price. It is not what the operator was paid: it takes no account of a contract, a differential, a transportation deduction, or the share any one owner holds.

Oil and gas are priced differently

Oil is a Texas realisation — the crude oil first purchase price. Gas is a benchmark, because no free Texas wellhead gas series exists at any date. The prices page publishes the difference rather than correcting it away.

A lease is not a well

The state reports oil on lease and gas on well, and this page is the lease grain. 06/G/213941 is the state's own key, not one this site invented.